HomeMy WebLinkAboutCouncil Workshop Minutes 03.16.2021MINUTES
CITY OF LAUREL
CITY COUNCIL WORKSHOP
TUESDAY, MARCH 16, 2021
A Council Workshop was held in Council Chambers and called to order by Mayor Tom Nelson at
6:33 p.m. on March 16, 2021.
COUNCIL MEMBERS PRESENT:
_x_ Emelie Eaton _x_ Heidi Sparks
x Bruce McGee x Richard Herr
x Scot Stokes x Iry Wilke
x Richard Klose Don Nelson
OTHERS PRESENT:
Kurt Markegard, Public Works Director
Nick Altonaga, Planning Director
Nathan Herman, Utility Plants Superintendent
Public Input:
There were none.
General Items
Executive Review
1. Resolution - A Resolution Of The City Council To Amend The Large Grant Request
Program Budget Pursuant To The Recommendation Of The Laurel Urban Renewal
Agency.
Nick Altonaga, Planning Director, stated the Laurel Urban Renewal Agency had discussed the
increase for the past few months. Last year the Large Grant cap was increased to $225k. The use
of this program has significantly increased. They are recommending the cap be increased to
$275k. Total project costs last year were over $500k. They would like to have the budget
increased to be able to review projects and provide more reimbursement. So far this year, there
have not been any applications.
It was questioned how this increase falls with LURA's overall budget. It was clarified there is
still extra money left over after the loan payment and the current grant expenditures. In the past
few years, LURA has received approximately $600k in revenue. The Small Grant program is a
small portion of their expenditures. There are a new hotel and commercial rental space going in
near Walmart. That will increase revenues as well.
2. Resolution - A Resolution Of The City Council Authorizing The Mayor To Sign A
Memorandum Of Understanding With The Laurel Lions Club And Laurel Community
Foundation Accepting Donations For Improvements At The Laurel Lion's Family Park.
Kurt Markegard, Public Works Director, stated this project is in connection with the money
granted from the Exxon oil spill. The Lions spearheaded this project. The City applied for the
funds on their behalf. The project is expected to cost up to $200k. The Lions have been
fundraising for this project. Laurel Community Foundation has been handling the donations.
Paul Kober, 1008 E. 8th Street, stated he is with the Lions. They were awarded a grant of $80k.
There are approximately $30k of additional funds that they could contribute to the project.
These funds will be transferred to the City as they bid on the project. The plans were turned over
to the City earlier today. The dock will be a T-shaped dock to allow for handicap accessibility to
the pond. KLJ did the design work, and the project is ready to go out to bid.
The City has used pit fill gravel to widen the walking path around the pond. It will be a
community amenity. Fishing will be available. The fishing game stocks the pond. The City is
looking at putting in more riprap along the pond's eastern side to keep the shore from eroding.
This MOU is to transfer those finds to the City to begin work on this project.
It was questioned if the riprap is needed all the way around. It was clarified only on the eastern
side as the prevailing winds are in a northwesterly direction.
Any funds remaining after the construction of the dock will be used to pave the walkway. Most
likely, there will not be enough to pave all the way around the pond, but a portion will be paved.
3. Ordinance - An Ordinance Amending Certain Chapters Of Title 14 Of The Laurel
Municipal Code Relating To The Adoption And Enforcement Of Building Codes For
The City Of Laurel As Required By The State Of Montana.
Nick Altonaga, Planning Director, stated that Karen has been working over the past few years to
update various codes. This is another one of those efforts. There are minor tweaks in the
language in tandem with other codes. There is a statutory deadline with the State on this
ordinance.
Council Issues
4. Individual Duck Variance
It was clarified that both this agenda item and the next would be part of the same discussion.
The attached handout was given to Council.
Recently a Constituent contacted a Council Member about being fined for ducks on her property.
She stated that due to the incline of the ducks, they naturally congregate there. This Council
Member is proposing the attached ordinance change. This Council Member wanted to get
feedback from the rest of the Council on if they would like to pursue the code change.
It was questioned why the constituent was fined for the ducks if they were naturally on the
property. Council noted they felt there was more to this story. Council noted that by allowing
ducks as proposed in the language change, they felt that chickens would come up again. It was
questioned if Council wanted to broach the topic. Council also questioned what happens if the
ducks choose to come back and raise their ducklings in a yard. They would have more than six
ducks would they get fined.
Council Members were not interested in bringing this ordinance forward at a business meeting.
Mayor Nelson stated that if people are interested in discussing the chicken issue, they would
need to bring it to Emergency Services.
5. Review Ordinance 6.16.010.
This agenda item was discussed with the previous item.
Other Items
® Small Service Contract — Manhole Repairs
Kurt Markegard, Public Works Director, and Nathan Herman, Utility Plants Superintendent,
stated this small service contract could not wait the five weeks it would have taken to bring this
forward on the next Council cycle. The rubber liners need to be ordered before the work can
begin.
The quote was received yesterday. The contractor will be in the area repairing manholes and will
waive the $2500 mobilization fee. This is the same contractor as in past years. One manhole
slotted to be repaired at the Water Treatment Plant. That manhole contains the meter for raw
water going to CHS. The liner will help waterproof the manhole. The meter is water submergible
but cannot be submerged 100% of the time. When the ditches fill in April, water will begin to fill
the manhole as in previous years. The City cannot pump out water fast enough. Currently have a
150 -gallon pump in the manhole to keep the water level down. The City has had to replace the
meter before because of this issue. When the meter goes down, the City must take an average
usage to bill CHS. That may or may not be what the refinery is currently using. It is better not to
have the meter fail.
The manholes are typically on a monthly cleaning schedule. Crews go in with a jet rodder and
move any solids. However, with Covid concerns, the monthly maintenance has been suspended
as the water vapor is an exposure risk.
There is one manhole on the southside that is made of brick. The goal is to preserve this manhole
as long as possible.
It was questioned what the cost to replace the meter would be. It was clarified that the meter
costs $4k to replace.
® Small Service Contract - Doors
Kurt Markegard, Public Works Director, apologized to Council. When the Utility Plants
Superintendent gave him the quote, he thought it needed to go to Budget/Finance Committee;
however, the quote is not just for the doors themselves but also for the labor to install the doors.
Thus needing to come to Council.
Nathan, Utility Plants Superintendent, stated the recent windstorm caught the door and broke the
pins on the top and bottom. It also bent the door. The doors are 9 feet by 14 feet in size. These
are custom doors. The doors are used to bring the chlorine into the Water Treatment Plant.
It was questioned if, while replacing the doors if they could be fixed so this does not happen
again. It was clarified that they would be reinforced to stop this from happening again in the
future.
It was questioned why the doors were so pricey. It was clarified the doors are made out of
fiberglass. It was further questioned why this is not an insurance claim. It was further clarified
that this could be an insurance claim; however, since the City has the funds to replace the door, it
is better not to submit an insurance claim. It would cost the City more to submit the claim as the
rates would go up for the next three years.
Review of Draft Council Agendas
6. Draft Council Agenda for March 23, 2021.
The two small service contracts will be added to next week's meeting.
Attendance at Upcoming Council Meeting
All present at tonight's meeting will be at next week's meeting.
Announcements
Mayor Nelson briefly reviewed the proper meeting procedure. There have been questions on how
the two different meetings work. Many municipalities around the State do not have work
sessions. We have moved to having work sessions in conjunction with Council meetings. The
Workshop is meant to have items brought before Council for debate. Then it will move onto a
Council meeting. Staff will not be present at Council meetings. The motion is made to bring the
item forward. Public comment is for the public to state if they are in favor or not of the item
being presented. Council discussion is for Council to state to other Council Members why they
think it should be voted up or down. Council Members are allowed to speak twice. Should
Council feel they need additional questions answered to make a decision, they can move to bring
back to the next Workshop. If the motion to table the motion fails, the original question would
then be called to question.
In the event, an item is brought to Council without being debated at a Workshop; the item will be
debated prior to the motion being called.
A Council Member noted the Tri -County banquet would be held in Joliet this year. They were
hoping to have the banquet in Riverside Park, but that is not ironed out just yet.
The next Emergency Services Committee will be Monday, March 22, 2021, at 6:00 in Council
Chambers.
A Council Member noted the maps in Council Chambers are about four years old. It was
questioned if these maps can be updated.
Council was reminded that March is a five Tuesday month. There will be no meeting held on
March 30, 2021.
The council workshop adjourned at 7:37 p.m.
Respectfully submitted,
s
Brittney M rman)
Administrative Assistant
NOTE: This meeting is open to the public. This meeting is for information and discussion of the Council for
the listed workshop agenda items.
Council:
I decided to write out everything I was going to say regarding this topic to prevent confusion.
I was approached by a constituent who was asking for a Variance specific to her situation.
I am aware certain Councilmembers are not fond of variances, due to future possible ramifications.
As such, I listened to what this constituent had to say and considered how her situation might affect the
community as a whole.
My solution is what follows.
Please understand that I am asking two things.
First, I want the Council to consider the change to Ordinance I am proposing.
If the Council agrees tonight that the changes are acceptable, I would like a simple Resolution drawn up
for vote next week which reflects that the Council would be in favor of making these changes. If the
Council votes in favor of the Resolution reflecting these simple changes to the Ordinance, I would then
like to pass this proposal along to Code Enforcement so the proper steps can be followed in changing
this Ordinance.
Second, I would like Code Enforcement to make the simple changes I am proposing. I don't want to
have these changes be included in a larger update of the Code or be put aside for later consideration.
This proposal is in response to a specific constituent request and I want to only address that request.
Title 6 Animals
Chapter 6.16 Miscellaneous Animal Regulations
Section 6.16.010 Keeping Certain Animals Prohibited.
Paragraph A reads:
A. No person shall keep swine, chickens,, ducks, peese, turke s, goats, ?gorses, sheep, caws, mules,
ZD
or chinchillas within the limits ofthe city except v hen transferring sUch animals to market or
where otherwise allowed within this code.
What I propose is to simply remove the word "ducks" from this paragraph.
Title 6 Animals
Chapter 6.16 Miscellaneous Animal Regulations
Section 6.16.010 Keeping Certain Animals Prohibited.
Paragraph C reads:
C. No person shall keep or maintain more than three pairs or total of'six pigeons. persons
keepir- gi-cons shrill not allow any barn, shed, cage, yard or other place wherein such
pigeons aro kept or housed to become filthy or offensive to neighbors or passersby, or
n1jurious to the health of any neighborhood or tend to contaminate the atmosphere in any
place in the cite, nor shall the persons suffer or permit sr:.ch pigeons to make any load or
Continuous noises tending to annoy or disturb any neighbors or neighborhood. Violations
of this subsection are deemed to constitute a public nuisance under Section 6.16.010 of this
code and shall be punishable as provided in :sections 6.1 E.0 30 and 6.08.080 of this code.
What I would like to propose in this section is to add the word "or ducks" in the four places where the
word "pigeons" appear, so that it reads:
No person shall keep or maintain more than three pairs or total of six pigeons or ducks.
Persons keeping pigeons or ducks shall not allow any barn, shed, cage, yard or other place wherein
such pigeons or ducks are kept or housed to become filthy or offensive to neighbors or passersby, or
injurious to the health of any neighborhood or tend to contaminate the atmosphere in any place in the
city, nor shall the persons suffer or permit such pigeons or ducks to make any loud or continuous noises
tending to annoy or disturb any neighbors or neighborhood.
RESOLUTION NO. R21 -
A RESOLUTION OF THE CITY COUNCIL AUTHORIZING THE MAYOR TO
SIGN A CONTRACT WITH CIP CONSTRUCTION TECHNOLOGIES, INC. FOR
THE REHABILITATION AND REPAIR OF CERTAIN SEWER
MANHOLES FOR THE CITY OF LAUREL.
BE IT RESOLVED by the City Council of the City of Laurel, Montana,
Section 1: Approval. The Independent Contractor Service Contract ("Contract")
recommended by the Mayor and Staff, is attached hereto and incorporated herein and by
adoption of the resolution, hereby approved.
Section 2: Adoption and Execution. The Mayor and City Clerk are hereby authorized
to execute the Contract on the City's behalf.
Introduced at a regular meeting of the City Council on , 2021, by Council
Member
PASSED and APPROVED by the City Council of the City of Laurel, Montana, this
day of 2021.
APPROVED by the Mayor this _ day of 2021.
C f1Wi3-aw., �)"J4
Thomas C. Nelson, Mayor
ATTEST:
Bethany Langve, City Clerk/Treasurer
Approved as to form:
Sam S. Painter, Civil City Attorney
R2I- Approve Contract CIP Construction Technologies, Inc
INDEPENDENT CONTRACTOR SERVICE CONTRACT
This Contract is made and entered into this 23rd day of March, 2021, between the City of
Laurel, a municipal corporation organized and existing under the laws of the State of Montana whose
address is P.O. Box 10, Laurel, Montana 59044, hereinafter referred to as "City" and CIP
Construction Technologies, Inc., a contractor licensed to conduct business in the State of Montana,
whose address is 134 1" Ave W Kalispell, MT 59901, hereinafter referred to as "Contractor".
SECTION ONE
DESCRIPTION OF SERVICES
A. Purpose. City shall hire Contractor as an independent contractor to perform for City the services
described in the Bid dated March 15, 2021, attached hereto as Exhibit "A" and by this reference made
part of this contract.
B. Effective Date. This contract is effective upon the date of its execution by both Parties.
Contractor shall complete the services within 60 days of commencing work. The parties may extend
the term of this contract in writing prior to its termination for good cause.
C. Scope of Work. Contractor shall perform his/her work and provide services in accordance with
the specifications and requirements of this contract, any applicable Montana Public Work Standard(s)
and Exhibit "A".
SECTION TWO
CONTRACT PRICE
Payment. City shall pay Contractor seventeen thousand four hundred eighty five dollars and no cents
($17,485.00) for the work described in Exhibit A. Any alteration or deviation form -the described work
that involves extra costs must be executed only upon written request by the City to Contractor and
will become an extra charge over and above the contract amount. The parties must agree to extra
payments or charges in writing. Prior to final payment, Contractor shall provide City with an invoice
for all charges.
SECTION THREE
CITY'S RESPONSIBILITIES
Upon completion of the contract and acceptance of the work, City shall pay Contractor the contract
price, plus or minus any additions or deductions agreed upon between the parties in accordance with
Sections one and two, if any.
SECTION FOUR
CONTRACTOR'S WARRANTIES AND RESPONSIBILITIES
A. Independent Contractor Status. The parties agree that Contractor is an independent contractor for
purposes of this contract and is not to be considered an employee of the City for any purpose
hereunder. Contractor is not subject to the terms and provisions of the City's personnel policies or
handbook and shall not be considered a City employee for workers' compensation or any other
purpose. Contractor is not authorized to represent the City or otherwise bind the City in any dealings,
Page 1 of 5
agreements or sub -contracts in any dealings between Contractor and any third parties. The City is
interested solely in the results of this contract. Contractor is solely responsible for all work and work
product under this contract, including techniques, sequences, procedures, and means. Contractor shall
supervise and direct the work to the best of his/her ability.
B. Wages and Employment. Contractor shall abide by all applicable State of Montana Rules,
Regulations and/or Statutes in regards to prevailing wages and employment requirements. Contractor
shall comply with the applicable requirements of the Workers' Compensation Act. Contractor shall
maintain workers' compensation coverage for all members and employees of his/her business, except
for those members who are exempted as independent contractors under the provisions of §39-71-401,
MCA. Contractor understands that all contractors or subcontractors working on publicly funded
projects are required to have withheld from earnings a license fee of one percent (1%) of the gross
contract price if the gross contract price is Five Thousand Dollars ($5,000) or more. This license fee
is paid to the Montana Department of Revenue pursuant to Montana law.
C. Unless otherwise specified by the terms of this Agreement, all materials and equipment used by
Contractor on the Construction Project shall be new and where not otherwise specified, of the most
suitable grade for their intended uses.
D. All workmanship and materials shall be of a kind and nature acceptable to the City.
E. All equipment, materials, and labor provided to, on, or for the Contract must be free of defects and
nonconformities in design, materials, and workmanship for a minimum period beginning with the
commencement of the work and ending one (1) year from completion and final acceptance by the
City. Upon receipt of City's written notice of a defective or nonconforming condition during the
warranty period, Contractor shall take all actions, including redesign and replacement, to correct the
defective or nonconforming condition within a time frame acceptable to the City and at no additional
cost to the City. Contractor shall also, at its sole cost, perform any tests required by City to verify that
such defective or nonconforming condition has been corrected. Contractor warrants the corrective
action taken against defective and nonconforming conditions for a period of an additional one (1) year
from the date of City's acceptance of the corrective action.
F. Contractor and its sureties are liable for the satisfaction and full performance of all warranties.
G. Contractor has examined the facilities and/or has made field examinations. Contractor has
knowledge of the services or project sought under this Contract and he/she further understands the site
conditions to be encountered during the performance of this Contract. Contractor has knowledge of
the types and character of equipment necessary for the work, the types of materials needed and the
sources of such materials, and the condition of the local labor market.
H. Contractor is responsible for the safety of the work and shall maintain all lights, guards, signs,
temporary passages, or other protections necessary for that purpose at all times.
I. All work is performed at Contractor's risk, and Contractor shall promptly repair or replace all
damage and loss at its sole cost and expense regardless of the reason or cause of the damage or loss;
provided, however, should the damage or loss be caused by an intentional or negligent act of the City,
the risk of such loss shall be placed on the City.
Page 2 of 5
J. Contractor is responsible for any loss or damage to materials, tools, work product or other articles
used or held for use in the completion or performance of the Contract.
K. Title to all work, work product, materials and equipment covered by any payment of Contractor's
compensation by City, whether directly incorporated into the Contract or not, passes to City at the
time of payment, free and clear of all liens and encumbrances.
SECTION FIVE
INDEMNITY AND INSURANCE
Contractor shall indemnify, defend and save City, its officers, agents and employees harmless from
any and all losses, damage and liability occasioned by, growing out of, or in any way arising or
resulting from any intentional or negligent act on the part of Contractor or its agents or employees.
SECTION SIX
COMPLIANCE WITH LAWS
Contractor shall comply with all federal, state, local laws, ordinances, rules and regulations.
Contractor shall either possess a City business license or shall purchase one, if a City Code requires a
business license.
SECTION SEVEN
NONDISCRIMINATION
Contractor agrees that any hiring of persons as a result of this contract must be on the basis of merit
and qualification and further that Contractor shall not discriminate on the basis of race, color, religion,
creed, political ideas, sex, age, marital status, physical or mental disability or national origin.
SECTION EIGHT
DEFAULT
If either party fails to comply with any term or condition of this Contract at the time or in the manner
provided for, the other party may, at its option, terminate this Contract and be released from all
obligations if the default is not cured within ten (10) days after written notice is provided to the
defaulting party. Said notice shall set forth the items to be cured. Additionally, the non -defaulting
party may bring suit for damages, specific performance, and any other remedy provided by law except
for punitive damages. The Parties hereby waive their respective claims for punitive damages. These
remedies are cumulative and not exclusive. Use of one remedy does not preclude use of the others.
Notices shall be provided in writing and hand -delivered or mailed to the parties at the addresses set
forth in the first paragraph of this Contract.
SECTION NINE
TERMINATION
Either party may terminate the contract for their convenience upon thirty days written notice sent
postage prepaid, to the addresses provided herein.
Page 3 of 5
SECTION TEN
GOVERNING LAW AND DISPUTE RESOLUTION
The Parties agree that the laws of the State of Montana govern this Contract. The Parties agree that
venue is proper within the Courts of Yellowstone County, Montana. If a dispute arises, the Parties,
through a representative(s) with full authority to settle a dispute, shall meet and attempt to negotiate a
resolution of the dispute in good faith no later than ten business days after the dispute arises. If
negotiations fail, the Parties may utilize a third party mediator and equally share the costs of the
mediator or file suit.
SECTION ELEVEN
ATTORNEY FEES
If any action is filed in relation to this agreement, the unsuccessful party in the action shall pay to the
successful party, in addition to all sums that either is ordered to pay, a reasonable sum for the
successful party's attorney's fees and all costs charges and expenses related to the action.
SECTION TWELVE
ENTIRE AGREEMENT
This contract and its referenced attachment and Exhibit A contain the entire agreement and
understanding of the parties and supersede any and all prior negotiations or understandings relating to
this project. This contract shall not be modified, amended, or changed in any respect except through a
written document signed by each party's authorized respective agents.
SECTION THIRTEENTH
ASSIGNMENT OF RIGHTS
The rights of each party under this Contract are personal to that party and may not be assigned or
transferred to any other person, firm, corporation, or other entity without the prior, express, and
written consent of the other party.
SECTION FOURTEEN
SEVERABILITY
Each provision, section, or subsection of this Contract shall stand separate and independent of every
other. In the event that a court of competent jurisdiction shall find any provision, section, or
subsection of this contract to be invalid, the remaining provisions, sections, and subsections of this
contract shall remain in full force and effect.
SECTION FIFTEEN
PARAGRAPH HEADINGS
The titles to the paragraphs of this contract are solely for the convenience of the parties and shall not
be used to explain, simplify, or aid in the interpretation of the provisions of this agreement.
Page 4 of 5
SIGNED AND AGREED BY BOTH PARTIES ON THE 23" DAY OF MARCH, 2021.
CITY OF LAUREL
Thomas C. Nelson, Mayor
ATTEST:
Bethany Langve, Clerk/Treasurer
5 of 5
CONTRACTOR
CIP Construction Technologies, Inc.
Employer Identification Number
CIP Construction Technologies, .Inc.
1341S1 Ave W Kalispell, MT 59941
Phone (406) 291-8417 Fax (406) 752-4630
BillMg Phone: (406) 257-3938
E -titan: JhizSwain@cipnianhole.couz Website: www.cipnzarzhole.conz
PROPOSAL
#LaurelPro2l-3-15
March I5, 2021 Emailed
City of Laurel
Laurel, MT
Phone 406-860-8139
Email: mwheeler@laurel.mt.gov, jbaker@laurel.mt.gov
Pages: I
Attn: Matt Wheeler and Justin Baker
PROJECT: City of Laurel Manhole Rehabilitation
SCOPE: Rehabilitate sewer manholes with cured -in-place fiberglass liner by authorized licensed installer
CIP Construction Technologies, Inc.
ITEM
DESCRIPTION
DIMENSIONS`
PRICE
Ia.
Line mh in alley 505 W 611 St
4.0 x 7.0
5250.00
lb.
Reshape benches
750.00 '
2a.
Line mh 315 E Maryland Ln
4.0 x 6.58 _
4935.00
2b.
Build new invert channel
950.00
3.
Water Plant mh — seal with grout — risers, barrel joint & barrel joint
1000.00
4.
Line mh at S 5'h St & S I" Ave
4.0 x 5.75
4600.00
5. Mobilization* NC
TOTAL $17,485.00
* The normal mobilization fee of $2500 will be waived performed in conjunction with other upcoming CIP
projects with MT Rail Link in Laurel.
It is agreed that the City of Laurel in all instances and at its expense, including but not limited to
installation, repair, or warranty service, will provide CIP with the following: adequate access to
structure(s), a source of water supply, traffic control if needed, assistance as needed to coordinate and
control sewage flow (normally sewage flow does not need to be controlled as our process allows the flow
to continue during installation) , a location for garbage disposal (e.g., access to dumpster).
CIP will provide the normal preparatory work and equipment necessary to install the liner system. We
expect that our process will eliminate further deterioration and greatly increase the life of the structure(s).
Best regards,
JimSwa4w
Jim Swain
President
RESOLUTION NO. R21 -
A RESOLUTION OF THE CITY COUNCIL AUTHORIZING THE MAYOR TO
SIGN A CONTRACT WITH ROCKY MOUNTAIN DOORS FOR THE PUCHASE
AND INSTALLATION OF A DOOR FOR THE CITY'S WATER PLANT.
BE IT RESOLVED by the City Council of the City of Laurel, Montana,
Section 1: Approval. The Independent Contractor Service Contract ("Contract")
recommended by the Mayor, City Attorney and Staff, is attached hereto and incorporated
herein and is hereby approved.
Section 2: Adoption. The Mayor and City Clerk are hereby authorized to execute the
Contract on the City's behalf.
Introduced at a regular meeting of the City Council on , 2021, by Council
Member
PASSED and APPROVED by the City Council of the City of Laurel, Montana, this
_ day of 2021.
APPROVED by the Mayor this _ day of
CITY OF LAUREL
Thomas C. Nelson, Mayor
ATTEST:
Bethany Langve, City Clerk/Treasurer
Approved as to form:
Sam S. Painter, Civil City Attorney
R21- Approve Contract Rocky Mountain Doors
2021.
INDEPENDENT CONTRACTOR SERVICE CONTRACT
This Contract is made and entered into this 23`d day of March, 2021, between the City of
Laurel, a municipal corporation organized and existing under the laws of the State of Montana whose
address is P.O. Box 10, Laurel, Montana 59044, hereinafter referred to as "City" and Rocky Mountain
Doors, a contractor licensed to conduct business in the State of Montana, whose address is 131 Moore
Lane Billings, MT 5 910 1, hereinafter referred to as "Contractor".
SECTION ONE
DESCRIPTION OF SERVICES
A. Purpose. City shall hire Contractor as an independent contractor to perform for City the services
described in the Bid dated January 29, 2021, attached hereto as Exhibit "A" and by this reference
made part of this contract.
B. Effective Date. This contract is effective upon the date of its execution by both Parties.
Contractor shall complete the services within 60 days of commencing work. The parties may extend
the term of this contract in writing prior to its termination for good cause.
C. Scope of Work. Contractor shall perform his/her work and provide services in accordance with
the specifications and requirements of this contract, any applicable Montana Public Work Standard(s)
and Exhibit "A".
SECTION TWO
CONTRACT PRICE
Payment. City shall pay Contractor eighteen thousand seven hundred ninety one dollars and sixty six
cents ($18,791.66) for the work described in Exhibit A. Any alteration or deviation form the described
work that involves extra costs must be executed only upon written request by the City to Contractor
and will become an extra charge over and above the contract amount. The parties must agree to extra
payments or charges in writing. Prior to final payment, Contractor shall provide City with an invoice
for all charges.
SECTION THREE
CITY'S RESPONSIBILITIES
Upon completion of the contract and acceptance of the work, City shall pay Contractor the contract
price, plus or minus any additions or deductions agreed upon between the parties in accordance with
Sections one and two, if any.
SECTION FOUR
CONTRACTOR'S WARRANTIES AND RESPONSIBILITIES
A. Independent Contractor Status. The parties agree that Contractor is an independent contractor for
purposes of this contract and is not to be considered an employee of the City for any purpose
hereunder. Contractor is not subject to the terms and provisions of the City's personnel policies or
handbook and shall not be considered a City employee for workers' compensation or any other
purpose. Contractor is not authorized to represent the City or otherwise bind the City in any dealings,
Page 1 of 5
agreements or sub -contracts in any dealings between Contractor and any third parties. The City is
interested solely in the results of this contract. Contractor is solely responsible for all work and work
product under this contract, including techniques, sequences, procedures, and means. Contractor shall
supervise and direct the work to the best of his/her ability.
B. Wages and Employment. Contractor shall abide by all applicable State of Montana Rules,
Regulations and/or Statutes in regards to prevailing wages and employment requirements. Contractor
shall comply with the applicable requirements of the Workers' Compensation Act. Contractor shall
maintain workers' compensation coverage for all members and employees of his/her business, except
for those members who are exempted as independent contractors under the provisions of §39-71-401,
MCA. Contractor understands that all contractors or subcontractors working on publicly funded
projects are required to have withheld from earnings a license fee of one percent (1%) of the gross
contract price if the gross contract price is Five Thousand Dollars ($5,000) or more. This license fee
is paid to the Montana Department of Revenue pursuant to Montana law.
C. Unless otherwise specified by the terms of this Agreement, all materials and equipment used by
Contractor on the Construction Project shall be new and where not otherwise specified, of the most
suitable grade for their intended uses.
D. All workmanship and materials shall be of a kind and nature acceptable to the City.
E. All equipment, materials, and labor provided to, on, or for the Contract must be free of defects and
nonconformities in design, materials, and workmanship for a minimum period beginning with the
commencement of the work and ending one (1) year from completion and final acceptance by the
City. Upon receipt of City's written notice of a defective or nonconforming condition during the
warranty period, Contractor shall take all actions, including redesign and replacement, to correct the
defective or nonconforming condition within a time frame acceptable to the City and at no additional
cost to the City. Contractor shall also, at its sole cost, perform any tests required by City to verify that
such defective or nonconforming condition has been corrected. Contractor warrants the corrective
action taken against defective and nonconforming conditions for a period of an additional one (1) year
from the date of City's acceptance of the corrective action.
F. Contractor and its sureties are liable for the satisfaction and full performance of all warranties.
G. Contractor has examined the facilities and/or has made field examinations. Contractor has
knowledge of the services or project sought under this Contract and he/she further understands the site
conditions to be encountered during the performance of this Contract. Contractor has knowledge of
the types and character of equipment necessary for the work, the types of materials needed and the
sources of such materials, and the condition of the local labor market.
H. Contractor is responsible for the safety of the work and shall maintain all Iights, guards, signs,
temporary passages, or other protections necessary for that purpose at all times.
I. All work is performed at Contractor's risk, and Contractor shall promptly repair or replace all
damage and loss at its sole cost and expense regardless of the reason or cause of the damage or loss;
provided, however, should the damage or loss be caused by an intentional or negligent act of the City,
the risk of such loss shall be placed on the City.
Page 2 of 5
J. Contractor is responsible for any loss or damage to materials, tools, work product or other articles
used or held for use in the completion or performance of the Contract.
K. Title to all work, work product, materials and equipment covered by any payment of Contractor's
compensation by City, whether directly incorporated into the Contract or not, passes to City at the
time of payment, free and clear of all liens and encumbrances.
SECTION FIVE
INDEMNITY AND INSURANCE
Contractor shall indemnify, defend and save City, its officers, agents and employees harmless from
any and all losses, damage and liability occasioned by, growing out of, or in any way arising or
resulting from any intentional or negligent act on the part of Contractor or its agents or employees.
SECTION SIX
COMPLIANCE WITH LAWS
Contractor shall comply with all federal, state, local laws, ordinances, rules and regulations.
Contractor shall either possess a City business license or shall purchase one, if a City Code requires a
business license.
SECTION SEVEN
NONDISCRIMINATION
Contractor agrees that any hiring of persons as a result of this contract must be on the basis of merit
and qualification and further that Contractor shall not discriminate on the basis of race, color, religion,
creed, political ideas, sex, age, marital status, physical or mental disability or national origin.
SECTION EIGHT
DEFAULT
If either party fails to comply with any term or condition of this Contract at the time or in the manner
provided for, the other party may, at its option, terminate this Contract and be released from all
obligations if the default is not cured within ten (10) days after written notice is provided to the
defaulting party. Said notice shall set forth the items to be cured. Additionally, the non -defaulting
party may bring suit for damages, specific performance, and any other remedy provided by law except
for punitive damages. The Parties hereby waive their respective claims for punitive damages. These
remedies are cumulative and not exclusive. Use of one remedy does not preclude use of the others.
Notices shall be provided in writing and hand -delivered or mailed to the parties at the addresses set
forth in the first paragraph of this Contract.
SECTION NINE
TERMINATION
Either party may terminate the contract for their convenience upon thirty days written notice sent
postage prepaid, to the addresses provided herein.
Page 3 of 5
SECTION TEN
GOVERNING LAW AND DISPUTE RESOLUTION
The Parties agree that the laws of the State of Montana govern this Contract. The Parties agree that
venue is proper within the Courts of Yellowstone County, Montana. If a dispute arises, the Parties,
through a representative(s) with full authority to settle a dispute, shall meet and attempt to negotiate a
resolution of the dispute in good faith no later than ten business days after the dispute arises. If
negotiations fail, the Parties may utilize a third party mediator and equally share the costs of the
mediator or file suit.
SECTION ELEVEN
ATTORNEY FEES
If any action is filed in relation to this agreement, the unsuccessful party in the action shall pay to the
successful party, in addition to all sums that either is ordered to pay, a reasonable sum for the
successful party's attorney's fees and all costs charges and expenses related to the action.
SECTION TWELVE
ENTIRE AGREEMENT
This contract and its referenced attachment and Exhibit A contain the entire agreement and
understanding of the parties and supersede any and all prior negotiations or understandings relating to
this project. This contract shall not be modified, amended, or changed in any respect except through a
written document signed by each party's authorized respective agents.
SECTION THIRTEENTH
ASSIGNMENT OF RIGHTS
The rights of each party under this Contract are personal to that party and may not be assigned or
transferred to any other person, firm, corporation, or other entity without the prior, express, and
written consent of the other party.
SECTION FOURTEEN
SEVERABILITY
Each provision, section, or subsection of this Contract shall stand separate and independent of every
other. In the event that a court of competent jurisdiction shall find any provision, section, or
subsection of this contract to be invalid, the remaining provisions, sections, and subsections of this
contract shall remain in full force and effect:
SECTION FIFTEEN
PARAGRAPH HEADINGS
The titles to the paragraphs of this contract are solely for the convenience of the parties and shall not
be used to explain, simplify, or aid in the interpretation of the provisions of this agreement.
Page 4 of 5
SIGNED AND AGREED BY BOTH PARTIES ON THE 23`d DAY OF MARCH, 2021.
CITY OF LAUREL
Thomas C. Nelson, Mayor
ATTEST:
Bethany Langve, Clerk/Treasurer
5 of 5
CONTRACTOR
Rocky Mountain Doors
Employer Identification Number
Rocky Mountain Doors
131 Moore Lane
Suite A
Billings, MT 59101
(406) 259-4898
I Name /Address I
HP NUERNBERGER
406-6961008
hpnuernberger@ginail.com
gmail.com
L;.:f.i'_ . 7
Date
Estimate #
1/29/2021
45672
I Project l
Description I Qty I Cost I Total
PAIR OF DOORS -SPECIAL -LITE AF -100 SERIES FIBERGLASS
96 X 177
I- LOUVER IN INACTIVE DOOR
I- CHAIN BOLT
I- LEVER LOCK
I -BOTTOM SURFACE BOLT
HINGES
DOOR SWEEPS
ASTRAGALS
WEATHERSTRIP KITS
OVERHEAD STOPS
INSTALL
Total
Customer Signature
18,791.661 18,791.66
$18,791.66
536 Moore Lane — P.O. Box 80385 — Billings, MT 59108-0385
(406) 252-8990 Fax (406) 252-0051 Toll Free 888-837-5107
February 23, 2021
Laurel Water Treatment Plant
Laurel, MT
Re: Door & hardware replacement
Quote:
2- Special -lite AF100 series fiberglass doors approx. 96" x 177"
1- Louver in inactive door
1- Chain bolt
1- Bottom surface bolt
1- Lever lock
1- Set of hinges
1- Set of door sweeps
1- Set of astragals
1- Set of weather-stripping
2- Overhead stops
Supply and Install - $24,950.00
Note: 50% down payment required prior to ordering materials
Should you have any questions concerning the above, please feel free to telephone me at 406-252-8990
or on my cell phone at 406-698-4940.
Jeremy M. Hein - Vice President
Dale & Jax Door & Glass, Inc.