HomeMy WebLinkAboutPublic Works Committee Minutes 01.11.2021MINUTES
CITY OF LAUREL
PUBLIC WORKS COMMITTEE
MONDAY, JANUARY 11, 2021
The Public Works Committee meeting was called to order at 6:00pm on Monday, January 11, 2021
Members Present: Heidi Sparks- Chair, Iry Wilke- Vice -Chair, Don Nelson, Richard Herr, Bill
Monsier, K Dan Koch, Mary Carter, Kurt Markegaard- Public Works Director
Public Input: None
General Items
1. Approval of Public Works Committee minutes of October 19, 2020. Motion by Iry Wilke,
Seconded by Dan Nelson, motion carried
New Business
2. Emergency Call -Outs for November and December
• Report attached
3. KLJ Report
• Engineering Report attached
4. Review of upcoming 2021 Public Works Projects
• Items to Note:
o Captial Improvement Plan (CIP) assistance- CDBG Grant applied for
previously and has been declined
o WWTP Archimedes Screw Rehabilitation- Task order will be presented at
Council Workshop on 1/19/21
o Replace water main located under houses on 12th Street- Capital Improvement
Funds will be utilized and a task order will be presented at Council Workshop
on 1/19/21
o Well Water at Water Plant- the pump is worn out and currently utilizing a
loaner pump, new pump is needed
o Street Maintenance Project 2021- MOU is needed for a few streets that a a
combination of city and county street
o Lion's Park Fishing Pier- working on this project design and implementation
o Jaycee's Hall- Park Board is working on Fee Structure
Old Business: None
Other Items
5. Fire Hydrant water pressure issue
• The issue behing this was a structure fire that occurred in the area of 5th and Aldre,
the Fire Department had struggles with water pressure from the Fire Hydrant in that
area, which was a hydrant included in the EDII project
• Public Works Director Markegaard stated 2 pressure valves were installed for the Fire
Hydrants as well as anew water line. At project completion the valves were not
turned on by the construction team. Kurt checked all vales and Fire Hydrants that
were part of the project, 2 of the hydrants had not been turned on and that issue has
been corrected. The hydrant at the Pelican Cafd is leaking and repair has been
scheduled for 1/12/21.
o To prevent this issue in the future, as part of the Special Provisions of projects
KLJ and the City will include checking valves and hydrants on their check list
as well.
Announcements
6. Next Meeting will be Monday, February 8, 2021 at 6:00pm in Council Chambers due to
holiday Monday on normal meeting day
Public Works
meeting
i in
10-19-2020 Emergency Locate
11-4-2020 Elm Lift Station Fail
11-6-2020 Water leak Yard Office and East Maryland
11-8-2020 Sanding Streets
12-12-2020 Sanding Streets
12-16-2020 Water Turn On
City of Laurel Project Status Update <<KLI
December 15, 2020
'' +' •' • / - • • I / /
Reason for Proiect: Reconstruction and rehabilitation of streets, utilities and various other infrastructure
improvements including Washington Ave., Idaho Ave. and Ohio Ave. generally bound between E. Main
Street and E. 1st Street, as well as E. 15t Street generally bound between Washington Ave. and Alder Ave.
Project Scope: Preliminary engineering, design, bidding and construction.
Current Status:
• Project is complete
• Water Model/GIS Mapping updated
Reason for Project: New campground in Riverside Park
Project Scope: Work consists of surveying and designing a new campground within Riverside Park.
Current Status:
• Punchlist Items Complete
• Final Pay Request Submitted
Sanitary Sewer H2S Remediation (KU #1804-00122)
Reason for Project: Buildup of H2S within the WW collection system has led to deterioration of manholes
and other system components.
Proiect Scope: Complete design and construction administration to address H2S build-up in the system.
Current Status:
• Pilot Study is complete.
• KU Memo being prepared
Data and Asset Management (KU # 1804-00461)
Reason for Project: Consolidate infrastructure information
Proiect Scope: Assemble city infrastructure data into a single source, which can be used to track and
manage assets
Current Status:
• Public works reviewing and will comment
Page 1 of 3
ENGINEERING, REIMAGINED
City of Laurel Project
Status Update
December 15, 2020
Reason for Proiect: Update old standards
Project Scope: Develop a set of cohesive and concise design standards for public improvements to help
facilitate reviews of new developments and ensure the public improvements are designed in the City of
Laurel's best interest.
Current Status:
• Drafts of the all sections of the manual are complete
• Final sections of streets, water and sewer are complete
Laurel Planning Services (KU #1804-00554)
Reason for Project: KU has been retained to provide City of Laurel planning services as needed.
Project Scope: Planning services may include; subdivision, zoning, development, floodplain hazard
management, miscellaneous reviews and other related work. KU will prepare staff reports,
recommendations, and attend meetings upon request.
Current Status:
• Floodplain Management —Joint Application for improvements at Riverside Park has been
approved
• Subdivision Review — Goldberg Sporting Estates Oct 21, 2020
• Growth Policy Update —Completed December 15, 2020
On -Call Professional Services (KU #1804-00347)
Proiect Scope: Services may include engineering, surveying, planning or government relations.
Current Status:
• Alder Ave. Utility Extension — Cost estimate and Map outline completed and sent to Public
Works.
Page 2 of 3
ENGINEERING, REIMAGINED
City of Laurel Project Status Update K L I
December 15, 2020
Other potential projects have been identified during recent conversations between City staff and KU.
City Public Works staff and KU task leaders meet bi-weekly to discuss current and future projects. As
these are tentative, the timing and extent of KU's services are TBD, unless noted otherwise.
Anticipated FY21 Projects
1. West Railroad Street Reconstruction- Proposal submitted
2. South Side Drainage Plan and Traffic Study
3. Water Storage Tank Recoat'3O21
4. Water System Planning
o. Master Plan Update (potentially update PER concurrently)
b. Booster station rehabilitation or replacement (task order forthcoming)
c. Water storage tank Preliminary Engineering Report
5. Capital Improvement Plan /C|P\assistance -CDBGGrant Applied.
~-[L'n
6. Water Line/Yellowstone River Crossing- Task Order
7. Sewer Main Repair ofElm Lifts station
B. VVVVTpArchimedes Screw Rehabilitation
~_'(���V`
9 7m��et�con�ru�ionfmm1����to
'
10. Replace Water main located under houses in12Street
~\r
11.Waterline extension out toGolf Course Road
Other Potential Future Projects
1. West Side TIFF
\\
8 � Uyy�\l1 \
�
0 X [/U»` )
\\u�`
r� \
L�\
ol
,�
�0 nV- L»
��f���
\\
y»VJV` zxx[ [l��\\\�� ~'
���- j
��\\X \]�
\ "
Page 9of3
- �J
ENGINEERING, RE|K4AC|NED