HomeMy WebLinkAboutWater Task Force/Reservoir/Water Plant Minutes 12.19.1994 (2)MINUTES WATER PLANT,.S.TEERING COMMITTEE DECEMBER 19, 1,994 11:00 A.M. COUNCIL CHAMBERS PRESENT: Bob Graham, City Councilman Jim Flisrand, City of Laurel Dave Michael, City of Laurel John Berg, Cenex Refinery John Rutt, Culligan of Laurel Bill Enright, Morrison/Maierle CSSA Double Tree Chuck Rodgers, Mayor Gay Easton, Councilman Steve Barlow, Outlook The intent of this meeting is to make a final decision on what scope of work needs to be done on the water plant and water system so Double Tree can finalize the grant application. After a lengthy discussion every committee member agreed with the following recommendations: Option #1 Filters: - Effluent piping/flow controls Back wash piping - Filter to waste piping Transfer pumping station Chemical System: - Feed, pacing, mixing - Chlorine feed & storage - Taste & order Basins: - Concrete repair and modify Plant Improvements: - Backwash basin addition - Direction filtration Plant Automation/electrical Modify plant inlet piping (new low service pump and piping) Auxiliary power and switch gear Water line bottle neck - from First Ave. South, S. 4th Street to W. Main St. and Fifth Avenue. - 1$" water main Paint 4 mg. Reservoir - Paint interior and exterior - Rehabilitate existing 1.5 mg.tank or construct standpipe to allow repair of 4 mg. reservoir. Option # 2 Includes all of Option #1 (above) plus the following: New Reservoir - New 1.0 mg. bolted steel tank - 7300 if of 12" tank transmission loop - Dead end loop on W. 9th and system isolation Estimated cost of each option will be finalized by consultant and submitted to City. Respectfully submitted, James A. Flisrand