Loading...
HomeMy WebLinkAboutResolution No. R20-11RESOLUTION NO. R20-11 RESOLUTION AWARDING KNIFE RIVER THE CONTRACT FOR THE CITY OF LAUREL'S EAST DOWNTOWN INFRASTRUCTURE IMPROVEMENTS PROJECT AND TO AUTHORIZE THE MAYOR TO SIGN ALL REQUIRED CONTRACT AND RELATED DOCUMENTS ON THE CITY'S BEHALF. WHEREAS, the City of Laurel planned and publicly advertised the project known as the East Downtown Infrastructure Improvements Project, and the City received responsive bids from qualified contractors; and WHEREAS, the City's Engineers, KLJ, and City Staff considered the bids received and recommends the City Council award the project and that the award and contract is in the City's best interest; and WHEREAS, Knife River submitted a bid of $2,487,572.50 and both KLJ and the City Staff have determined that accepting the bid is in the best interest of the City. NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Laurel, Montana, finds that the City has followed its procurement policies and state law requiring competitive bidding; and BE IT FUTHER RESOLVED the City Council hereby awards the project to Knife River for its submitted bid price of $2,487,572.50. The Mayor and City Clerk are authorized to sign all necessary documents, agreements or contracts on the City's behalf consistent with this resolution. Introduced at a regular meeting of the City Council on March 10, 2020, by Council Member Eaton. PASSED and APPROVED by the City Council of the City of Laurel this 10'x' day of March 2020 APPROVED by the Mayor this 10`x' day of March 2020. CITY OF LAUREL T omas elson, Mayor ATTEST Bethany Lane, 6 -Treasurer, Clerk -Treasurer Approved as t form Sam Painter, Civil City Attorney R20-11 Award East Downtown Infrastructure Improvements Project — Knife River 2611 Gabel Road Billings, MT 59102-7329 406 245 5499 KUENG.COM February 17, 2020 Kurt Markegard City of Laurel 115 W. 1st Street Laurel, MT 59044 Re: East Downtown Infrastructure Improvements — Recommendation of Award Dear Kurt: Bids for the East Downtown Infrastructure Improvements were received on February 13th, 2020. Five bids were opened and read aloud. The bids were checked for mathematical accuracy and no discrepancies were found. The low bidder was Knife River, with a total bid amount of $2,487,572.50 for Base Bid Schedules 2-5 combined. We recommend the contract be awarded to Knife River, accordingly, for all bid schedules. Enclosed is the Notice of Award (NOA) for the City's approval and a Certified Bid Tabulation. Please sign, date and return four (4) original NOA forms; upon receipt, we will work with Knife River to route final Contracts for the City's approval. If you have any questions or concerns, please contact me at (406) 245-5499. Sincerely, KU Travis Copper, PE Project Engineer Enclosure(s): Notice of Award Tabulation of Bids Project #: 1804-01309 cc: Matt Smith, file Notice of Award Date: February 17, 2020 Project: East Downtown Infrastructure Improvements Owner: City of Laurel Owner's Contract No.: Contract: Total Combined Bid of Schedules 1-3 Engineer's Project No.: 1804-01309 Bidder: Knife River- Billings Bidder's Address: P.O. Box 80066 Billings, MT 59108 You are notified that your Bid dated February 13, 2020 for the above Contract has been considered. You are the Successful Bidder and are awarded a Contract for East Downtown Infrastructure Improvements. The Contract Price of your Contract is Two Million, Four Hundred Eighty -Seven Thousand, Five Hundred Seventy - Two Dollars and Fifty Cents ($2,487,572.50). 4 copies of the proposed Contract Documents (except Drawings) and one additional agreement accompany this Notice of Award. tbd sets of Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen [15] days of the date you receive this Notice of Award. 1. Deliver to the Engineer four 4 fully executed counterparts of the Contract Documents and one additional signed agreement. 2. Deliver with the executed Contract Documents the Contract Security [Bonds] as specified in the Instructions to Bidders (Article 20) and General Conditions (Paragraph 5.01). 3. Other conditions precedent: (none) Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within ten days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Contract Documents. City of Laurel llwnar Title Copy to Engineer East Downtown Infrastructure Improvements Notice of Award Form 00510 KU Project 1804-01309 Page 1 of 1 KLI 2611 Gabel Road Billings, MT 59102-7329 406 245 5499 KUENG.COM Letter of Transmittal Date: February 17, 2020 To: Bethany Langve City of Laurel 115 W. 1st Street Laurel, MT 59044 Copy To: file From: Travis Copper Re: East Downtown Infrastructure Improvements Bid Opening Project #: 1804-01309 We Are Sending You: ❑X Attached ❑ Under Separate Cover ❑ As Requested ❑ Prints/Plans ❑ For Your Information ❑ For Your Review ❑ Specifications For Signature ❑ Samples ❑ Other Shipped via: UPS Copies (#) Description 1 Award Recommendation Letter 4 Notice of Award 1 Certified Bid Tabulation Bethany, Enclosed are the Award Recommendation Letter, Notice of Award, and Certified Bid Tabulation for the East Downtown Infrastructure Improvements project. Can you please coordinate with Kurt and the City to get these approved, and to have the Notice of Award (four copies) signed and returned to KU? Please let us know if you have any questions. TABULATION OF BIDS EAST DOWNTOWN INFRASTRUCTURE IMPROVEMENTS - KU #1804-01309 CITY OF LAUREL, MONTANA February 13, 2020 Engineer's Opinion of Cost COP Construction, LLC FirstMark Construction, LLC KLE Construction, LLC Knife River - Billings Wilson Bros. Constuction of Montana, Inc. Item Description Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price BASE BID SCHEDULE 2 - STREET IMPROVEMENTS 201 Mobilization 1 LS $ 89,700.00 $ 89,700.00 $ 70,000.00 $ 70,000.00 $ 50,000.00 $ 50,000.00 $ 105,000.00 $ 105,000.00 $ 134,500.00 $ 134,500.00 $ 195,000.00 $ 195,000.00 202 Taxes, Insurance and Bonds 1 LS $ 44,900.00 $ 44,900.00 $ 9,200.00 $ 9,200.00 $ 38,000.00 $ 38,000.00 $ 35,000.00 $ 35,000.00 $ 19,000.00 $ 19,000.00 $ 60,000.00 $ 60,000.00 203 Traffic Control 1 LS $ 20,000.00 $ 20,000.00 $ 11,000.00 $ 11,000.00 $ 25,000.00 $ 25,000.00 $ 15,000.00 $ 15,000.00 $ 21,550.00 $ 21,550.00 $ 25,000.00 $ 25,000.00 204 Stormwater Management and Erosion Control 1 LS $ 20,000.00 $ 20,000.00 $ 21,000.00 $ 21,000.00 $ 3,500.00 $ 3,500.00 $ 7,500.00 $ 7,500.00 $ 12,650.00 $ 12,650.00 $ 6,500.00 $ 6,500.00 205 Concrete Flat Work Removal 2,310 SY $ 14.00 $ 32,340.00 $ 23.00 $ 53,130.00 $ 9.60 $ 22,176.00 $ 12.00 $ 27,720.00 $ 13.20 $ 30,492.00 $ 13.50 $ 31,185.00 206 Concrete Curb and Gutter Removal 5,020 LF $ 3.00 $ 15,060.00 $ 9.50 $ 47,690.00 $ 7.00 $ 35,140.00 $ 5.00 $ 25,100.00 $ 3.00 $ 15,060.00 $ 6.00 $ 30,120.00 207 Remove Existing Tree (6" to 18") 2 EA $ 1,200.00 $ 2,400.00 $ 490.00 $ 980.00 $ 1,075.00 $ 2,150.00 $ 1,200.00 $ 2,400.00 $ 1,050.00 $ 2,100.00 $ 1,800.00 $ 3,600.00 208 Remove Existing Tree (larger than 18") 3 EA $ 2,000.00 $ 6,000.00 $ 1,800.00 $ 5,400.00 $ 1,265.00 $ 3,795.00 $ 1,400.00 $ 4,200.00 $ 1,250.00 $ 3,750.00 $ 2,200.00 $ 6,600.00 209 Unclassified Excavation 9,880 Cy $ 21.00 $ 207,480.00 $ 22.00 $ 217,360.00 $ 31.00 $ 306,280.00 $ 19.00 $ 187,720.00 $ 14.80 $ 146,224.00 $ 16.00 $ 158,080.00 210 Non -Woven Geotextile Fabric 17,470 SY $ 2.50 $ 43,675.00 $ 1.00 $ 17,470.00 $ 1.50 $ 26,205.00 $ 2.00 $ 34,940.00 $ 1.20 $ 20,964.00 $ 4.50 $ 78,615.00 211 Geogrid 17,470 SY $ 3.50 $ 61,145.00 $ 1.50 $ 26,205.00 $ 2.10 $ 36,687.00 $ 2.50 $ 43,675.00 $ 1.80 $ 31,446.00 $ 7.00 $ 122,290.00 212 3" Minus Sub -base Course 4,700 CY I $ 54.00 $ 253,800.00 $ 39.50 $ 185,650.00 $ 42.00 $ 197,400.00 $ 31.00 $ 145,700.00 $ 38.30 $ 180,010.00 $ 44.50 $ 209,150.00 213 1-1/2" Crushed Base Course 5,875 Cy $ 36.00 $ 211,500.00 $ 41.50 $ 243,812.50 $ 27.50 $ 161,562.50 $ 28.00 $ 164,500.00 $ 24.60 $ 144,525.00 $ 32.00 $ 188,000.00 214 Asphalt Concrete Pavement (4"Thick) 15,400 SY $ 23.00 $ 354,200.00 $ 20.00 $ 308,000.00 $ 20.30 $ 312,620.00 $ 21.00 $ 323,400.00 $ 19.70 $ 303,380.00 $ 24.00 $ 369,600.00 215 Asphalt Concrete Pavement (6" Thick) 410 SY $ 34.50 $ 14,145.00 $ 36.00 $ 14,760.00 $ 31.90 $ 13,079.00 $ 39.00 $ 15,990.00 $ 31.60 $ 12,956.00 $ 43.00 $ 17,630.00 216 Combined Curb & Gutter 4,376 LF $ 23.00 $ 100,648.00 $ 21.00 $ 91,896.00 $ 17.50 $ 76,580.00 $ 25.00 $ 109,400.00 $ 15.70 $ 68,703.20 $ 28.00 $ 122,528.00 217 Concrete Valley Gutter 2,312 SF $ 25.00 $ 57,800.00 $ 13.50 $ 31,212.00 $ 8.50 $ 19,652.00 $ 16.00 $ 36,992.00 $ 6.60 $ 15,259.20 $ 15.00 $ 34,680.00 218 Curb Turn Fillet 26 EA $ 2,200.00 $ 57,200.00 $ 740.00 $ 19,240.00 $ 465.00 $ 12,090.00 $ 2,000.00 $ 52,000.00 $ 440.00 $ 11,440.00 $ 1,800.00 $ 46,800.00 219 Concrete Driveway Approach 6,189 SF $ 12.00 $ 74,268.00 $ 12.50 $ 77,362.50 $ 9.50 $ 58,795.50 $ 16.00 $ 99,024.00 $ 6.00 $ 37,134.00 $ 11.00 $ 68,079.00 220 Concrete Sidewalk (4 -Inch Thick) 13,754 SF $ 11.00 $ 151,294.00 $ 7.00 $ 96,278.00 $ 6.75 $ 92,839.50 $ 13.00 $ 178,802.00 $ 6.10 $ 83,899.40 $ 9.00 $ 123,786.00 221 Concrete Sidewalk (6 -Inch Thick) 2,531 SF $ 14.00 $ 35,434.00 $ 10.50 $ 26,575.50 $ 8.50 $ 21,513.50 $ 14.00 $ 35,434.00 $ 7.20 $ 18,223.20 $ 11.00 $ 27,841.00 222 Concrete Pedestrian Ramps 3,240 SF $ 16.00 $ 51,840.00 $ 14.00 $ 45,360.00 $ 10.80 $ 34,992.00 $ 18.00 $ 58,320.00 $ 7.60 $ 24,624.00 $ 11.00 $ 35,640.00 223 Detectable Warning Panels 310 SF $ 35.00 $ 10,850.00 $ 60.00 $ 18,600.00 $ 23.00 $ 7,130.00 $ 40.00 $ 12,400.00 $ 24.00 $ 7,440.00 $ 48.00 $ 14,880.00 224 Remove Existing Street Sign & Post 11 EA $ 140.00 $ 1,540.00 $ 68.00 $ 748.00 $ 100.00 $ 1,100.00 $ 100.00 $ 1,100.00 $ 97.00 $ 1,067.00 $ 150.00 $ 1,650.00 225 New Signpost 16 EA $ 280.00 $ 4,480.00 $ 250.00 $ 4,000.00 $ 250.00 $ 4,000.00 $ 250.00 $ 4,000.00 $ 239.00 $ 3,824.00 $ 260.00 $ 4,160.00 226 New Signs 122 SF $ 20.00 $ 2,440.00 $ 18.00 $ 2,196.00 $ 18.00 $ 2,196.00 $ 19.00 $ 2,318.00 $ 17.00 $ 2,074.00 $ 20.00 $ 2,440.00 227 4" Wide Pavement Stripe (Epoxy) 902 LF 1 $ 2.60 $ 2,345.20 $ 2.00 $ 1,804.00 $ 1.75 $ 1,578.50 $ 2.20 $ 1,984.40 $ 1.70 $ 1,533.40 $ 2.00 $ 1,804.00 228 8" Wide Pavement Stripe (Epoxy) 382 LF $ 5.50 $ 2,101.00 $ 3.50 $ 1,337.00 $ 3.50 $ 1,337.00 $ 4.50 $ 1,719.00 $ 3.40 $ 1,298.80 $ 4.00 $ 1,528.00 229 24" Wide Pavement Stripe (Epoxy) 225 LF $ 20.00 $ 4,500.00 $ 11.00 $ 2,475.00 $ 11.00 $ 2,475.00 $ 13.00 $ 2,925.00 $ 10.50 $ 2,362.50 $ 12.00 $ 2,700.00 230 Handicap Symbol 3 EA $ 200.00 $ 600.00 $ 110.00 $ 330.00 $ 110.00 $ 330.00 $ 125.00 $ 375.00 $ 102.00 $ 306.00 $ 800.00 $ 2,400.00 231 Curb Paint (Epoxy) 1,457 LF $ 4.75 $ 6,920.75 $ 4.00 $ 5,828.00 $ 4.50 $ 6,556.50 $ 5.00 $ 7,285.00 $ 4.00 $ 5,828.00 $ 3.00 $ 4,371.00 232 Landscape Restoration (Seeding) 1,490 SY $ 5.25 $ 7,822.50 $ 4.50 $ 6,705.00 $ 13.00 $ 19,370.00 $ 5.00 $ 7,450.00 $ 10.00 $ 14,900.00 $ 6.00 $ 8,940.00 SCHEDULE 2 SUBTOTAL: $ 1,948,428.45 $ 1,663,604.50 $ 1,596,130.00 $ 1,749,373.40 $ 1,378,523.70 $ 2,005,597.00 BASE BID SCHEDULE 3 - STORM DRAIN IMPROVEMENTS 301 Mobilization 1 LS $ 12,100.00 $ 12,100.00 $ 44,000.00 $ 44,000.00 $ 10,875.00 $ 10,875.00 $ 30,000.00 $ 30,000.00 $ 13,470.00 $ 13,470.00 $ 20,000.00 $ 20,000.00 302 Taxes, Insurance and Bonds 1 LS $ 6,100.00 $ 6,100.00 $ 2,500.00 $ 2,500.00 $ 8,400.00 $ 8,400.00 $ 6,000.00 $ 6,000.00 $ 7,857.00 $ 7,857.00 $ 7,500.00 $ 7,500.00 303 Traffic Control 1 LS $ 1,000.00 $ 1,000.00 $ 3,600.00 $ 3,600.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 13,670.00 $ 13,670.00 $ 2,500.00 $ 2,500.00 304 Stormwater Management and Erosion Control 1 LS $ 1,000.00 $ 1,000.00 $ 1.00 $ 1.00 $ 1,750.00 $ 1,750.00 $ 3,500.00 $ 3,500.00 $ 6,570.00 $ 6,570.00 $ 2,500.00 1 $ 2,500.00 TABULATION OF BIDS EAST DOWNTOWN INFRASTRUCTURE IMPROVEMENTS - KU #1804-01309 CITY OF LAUREL, MONTANA February 13, 2020 Engineer's Opinion of Cost COP Construction, LLC FirstMark Construction, LLC KLE Construction, LLC Knife River- Billings Wilson Bros. Constuction of Montana, Inc. Item Description Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 305 Remove Existing Storm Drain Inlet 9 EA $ 450.00 $ 4,050.00 $ 580.00 $ 5,220.00 $ 187.00 $ 1,683.00 $ 250.00 $ 2,250.00 $ 173.00 $ 1,557.00 $ 800.00 $ 7,200.00 306 Remove Existing Storm Drain Pipe 289 LF $ 8.00 $ 2,312.00 $ 6.00 $ 1,734.00 $ 9.00 $ 2,601.00 $ 14.00 $ 4,046.00 $ 9.20 $ 2,658.80 $ 10.00 $ 2,890.00 307 48 diam. Storm Drain Manhole 7 EA $ 5,200.00 $ 36,400.00 $ 4,300.00 $ 30,100.00 $ 4,080.00 $ 28,560.00 $ 2,500.00 $ 17,500.00 $ 3,775.00 $ 26,425.00 $ 4,200.00 $ 29,400.00 308 60" diam. Storm Drain Manhole 2 EA $ 6,000.00 $ 12,000.00 $ 5,600.00 $ 11,200.00 $ 5,733.00 $ 11,466.00 $ 3,500.00 $ 7,000.00 $ 5,306.00 $ 10,612.00 $ 5,500.00 $ 11,000.00 309 60" diam. Storm Drain Manhole over Existing Storm Drain Pipe 2 EA $ 6,500.00 $ 13,000.00 $ 6,500.00 $ 13,000.00 $ 8,380.00 $ 16,760.00 $ 3,600.00 $ 7,200.00 $ 7,755.00 $ 15,510.00 $ 5,800.00 $ 11,600.00 310 Concrete Collar Diamonds on Manholes 8 EA $ 750.00 $ 6,000.00 $ 840.00 $ 6,720.00 $ 875.00 $ 7,000.00 $ 1,200.00 $ 9,600.00 $ 568.00 $ 4,544.00 $ 500.00 $ 4,000.00 311 2' x 3' Storm Drain Inlet 15 EA $ 3,100.00 $ 46,500.00 $ 3,300.00 $ 49,500.00 $ 3,197.00 $ 47,955.00 $ 2,250.00 $ 33,750.00 $ 3,061.00 $ 45,915.00 $ 3,500.00 $ 52,500.00 312 30" diam. Storm Drian Inlet 1 EA $ 2,800.00 $ 2,800.00 $ 3,300.00 $ 3,300.00 $ 2,095.00 $ 2,095.00 $ 1,500.00 $ 1,500.00 $ 1,938.00 $ 1,938.00 $ 2,750.00 $ 2,750.00 313 28x18 RCP Irrigation Pipe 6 LF $ 120.00 $ 720.00 $ 120.00 $ 720.00 $ 308.00 $ 1,848.00 $ 125.00 $ 750.00 $ 295.00 $ 1,770.00 $ 125.00 $ 750.00 314 Relocated 28x18 RCP FES 1 EA $ 1,000.00 $ 1,000.00 $ 570.00 $ 570.00 $ 507.00 $ 507.00 $ 500.00 $ 500.00 $ 480.00 $ 480.00 $ 750.00 $ 750.00 315 24" diam. Storm Drain Pipe 594 LF $ 87.00 $ 51,678.00 $ 76.00 $ 45,144.00 $ 102.00 $ 60,588.00 $ 90.00 $ 53,460.00 $ 99.00 $ 58,806.00 $ 50.00 $ 29,700.00 316 18" diam. Storm Drain Pipe 456 LF $ 78.00 $ 35,568.00 $ 65.00 $ 29,640.00 $ 61.00 $ 27,816.00 $ 78.00 $ 35,568.00 $ 60.00 $ 27,360.00 $ 28.00 $ 12,768.00 317 15" diam. Storm Drain Pipe 75 LF $ 71.00 $ 5,325.00 $ 63.00 $ 4,725.00 $ 54.00 $ 4,050.00 $ 65.00 $ 4,875.00 $ 52.00 $ 3,900.00 $ 24.00 $ 1,800.00 318 12" diam. Storm Drain Pipe 562 LF $ 65.00 $ 36,530.00 $ 60.00 $ 33,720.00 $ 46.00 $ 25,852.00 $ 50.00 $ 28,100.00 $ 45.00 $ 25,290.00 $ 20.00 $ 11,240.00 319 Street Trench Repair 570 Sy $ 125.00 $ 71,250.00 $ 130.00 $ 74,100.00 $ 155.00 $ 88,350.00 $ 95.00 $ 54,150.00 $ 142.00 $ 80,940.00 $ 50.00 $ 28,500.00 SCHEDULE 3 SUBTOTAL: $ 345,333.00 $ 359,494.00 $ 358,156.00 $ 304,749.00 $ 349,272.80 $ 239,348.00 BASE BID SCHEDULE 4 - WATER IMPROVEMENTS 401 Mobilization 1 LS $ 9,000.00 $ 9,000.00 $ 225,000.00 $ 225,000.00 $ 37,670.00 $ 37,670.00 $ 30,000.00 $ 30,000.00 $ 29,600.00 $ 29,600.00 $ 45,000.00 $ 45,000.00 402 Taxes, Insurance and Bonds 1 LS $ 5,500.00 $ 5,500.00 $ 8,000.00 $ 8,000.00 $ 14,800.00 $ 14,800.00 $ 12,000.00 $ 12,000.00 $ 13,775.00 $ 13,775.00 $ 15,000.00 $ 15,000.00 403 Traffic Control 1 LS $ 5,500.00 $ 5,500.00 $ 13,000.00 $ 13,000.00 $ 10,000.00 $ 10,000.00 $ 15,000.00 $ 15,000.00 $ 16,020.00 $ 16,020.00 $ 2,500.00 $ 2,500.00 404 Stormwater Management and Erosion Control 1 LS $ 3,500.00 $ 3,500.00 $ 1.00 $ 1.00 $ 1,750.00 $ 1,750.00 $ 3,500.00 $ 3,500.00 $ 4,576.00 $ 4,576.00 $ 2,500.00 $ 2,500.00 405 Temporary Water System 1 LS $ 60,000.00 $ 60,000.00 $ 44,000.00 $ 44,000.00 $ 16,540.00 $ 16,540.00 $ 35,000.00 $ 35,000.00 $ 15,300.00 $ 15,300.00 $ 30,000.00 $ 30,000.00 406 Asbestos Inspection 1 LS $ 7,500.00 $ 7,500.00 $ 1,200.00 $ 1,200.00 $ 1,320.00 $ 1,320.00 $ 2,000.00 $ 2,000.00 $ 1,225.00 $ 1,225.00 $ 2,500.00 $ 2,500.00 407 Remove Existing Water Main 1,592 LF $ 30.00 $ 47,760.00 $ 6.00 $ 9,552.00 $ 11.00 $ 17,512.00 $ 12.00 $ 19,104.00 $ 10.50 $ 16,716.00 $ 5.00 $ 7,960.00 408 Remove Existing Fire Hydrant Assembly 4 EA $ 2,000.00 $ 8,000.00 $ 290.00 $ 1,160.00 $ 230.00 $ 920.00 $ 500.00 $ 2,000.00 $ 214.00 $ 856.00 $ 500.00 $ 2,000.00 409 Remove Existing Valve 10 EA $ 550.00 $ 5,500.00 $ 110.00 $ 1,100.00 $ 143.00 $ 1,430.00 $ 80.00 $ 800.00 $ 133.00 $ 1,330.00 $ 200.00 $ 2,000.00 410 Fill & Abandon Existing Water Main 3 Cy $ 1,000.00 $ 3,000.00 $ 860.00 $ 2,580.00 $ 308.00 $ 924.00 $ 250.00 $ 750.00 $ 285.00 $ 855.00 $ 1,000.00 $ 3,000.00 411 Connect to Existing Water Main 14 EA $ 4,000.00 $ 56,000.00 $ 2,000.00 $ 28,000.00 $ 3,528.00 $ 49,392.00 $ 2,800.00 $ 39,200.00 $ 3,265.00 $ 45,710.00 $ 1,200.00 $ 16,800.00 412 12" C900 PVC Water Main 5 LF $ 200.00 $ 1,000.00 $ 200.00 $ 1,000.00 $ 176.00 $ 880.00 $ 150.00 $ 750.00 $ 163.00 $ 815.00 $ 80.00 $ 400.00 413 10" C900 PVC Water Main 100 LF $ 100.00 $ 10,000.00 $ 46.00 $ 4,600.00 $ 63.95 $ 6,395.00 $ 90.00 $ 9,000.00 $ 62.00 $ 6,200.00 $ 70.00 $ 7,000.00 414 8" C900 PVC Water Main 2,600 LF $ 80.00 $ 208,000.00 $ 40.00 $ 104,000.00 $ 50.70 $ 131,820.00 $ 60.00 $ 156,000.00 $ 47.00 $ 122,200.00 $ 40.00 $ 104,000.00 415 6" C900 PVC Water Main 390 LF $ 90.00 $ 35,100.00 $ 55.00 $ 21,450.00 $ 46.30 $ 18,057.00 $ 58.00 $ 22,620.00 $ 43.00 $ 16,770.00 $ 35.00 $ 13,650.00 416 10" Gate Valve & Box 6 EA $ 3,000.00 $ 18,000.00 $ 2,600.00 $ 15,600.00 $ 2,865.00 $ 17,190.00 $ 3,200.00 $ 19,200.00 $ 2,653.00 $ 15,918.00 $ 2,800.00 $ 16,800.00 417 8" Gate Valve & Box 23 EA $ 2,500.00 $ 57,500.00 $ 2,100.00 $ 48,300.00 $ 1,984.00 $ 45,632.00 $ 2,500.00 $ 57,500.00 $ 1,836.00 $ 42,228.00 $ 2,400.00 $ 55,200.00 418 6" Gate Valve & Box 12 EA $ 2,300.00 $ 27,600.00 $ 1,800.00 $ 21,600.00 $ 1,653.00 $ 19,836.00 $ 1,850.00 $ 22,200.00 $ 1,530.00 $ 18,360.00 $ 2,000.00 $ 24,000.00 419 Concrete Collar Diamonds on Valve Boxes 6 EA $ 600.00 $ 3,600.00 $ 190.00 $ 1,140.00 $ 485.00 $ 2,910.00 $ 1,100.00 $ 6,600.00 $ 495.00 $ 2,970.00 $ 800.00 $ 4,800.00 420 8" Cross 1 EA $ 2,000.00 $ 2,000.00 $ 960.00 $ 960.00 $ 1,650.00 $ 1,650.00 $ 1,900.00 $ 1,900.00 $ 1,530.00 $ 1,530.00 $ 1,100.00 $ 1,100.00 421 10" X 8" Tee 2 EA $ 2,000.00 $ 4,000.00 $ 1,000.00 $ 2,000.00 $ 1,430.00 $ 2,860.00 $ 1,250.00 1 $ 2,500.00 $ 1,230.00 1 $ 2,460.00 $ 1,100.00 1 $ 2,200.00 TABULATION OF BIDS EAST DOWNTOWN INFRASTRUCTURE IMPROVEMENTS - KU #1804-01309 CITY OF LAUREL, MONTANA February 13, 2020 Engineer's Opinion of Cost COP Construction, LLC FirstMark Construction, LLC KLE Construction, LLC Knife River- Billings Wilson Bros. Constuction of Montana, Inc. Item Description Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 422 10" X 6" Tee 1 EA $ 1,800.00 $ 1,800.00 $ 970.00 $ 970.00 $ 1,430.00 $ 1,430.00 $ 1,250.00 $ 1,250.00 $ 1,230.00 $ 1,230.00 $ 1,000.00 $ 1,000.00 423 8" X 8" Tee 4 EA $ 1,500.00 $ 6,000.00 $ 870.00 $ 3,480.00 $ 1,320.00 $ 5,280.00 $ 950.00 $ 3,800.00 $ 1,225.00 $ 4,900.00 $ 800.00 $ 3,200.00 424 8" X 6" Tee 9 EA $ 1,300.00 $ 11,700.00 $ 820.00 $ 7,380.00 $ 1,035.00 $ 9,315.00 $ 900.00 $ 8,100.00 $ 969.00 $ 8,721.00 $ 725.00 $ 6,525.00 425 6" X 6" Tee 2 EA $ 1,200.00 $ 2,400.00 $ 750.00 $ 1,500.00 $ 990.00 $ 1,980.00 $ 850.00 $ 1,700.00 $ 930.00 $ 1,860.00 $ 600.00 $ 1,200.00 426 8" - 45° Bend 5 EA $ 900.00 $ 4,500.00 $ 690.00 $ 3,450.00 $ 750.00 $ 3,750.00 $ 950.00 $ 4,750.00 $ 700.00 $ 3,500.00 $ 500.00 $ 2,500.00 427 8" - 22.5° Bend 5 EA $ 800.00 $ 4,000.00 $ 690.00 $ 3,450.00 $ 725.00 $ 3,625.00 $ 750.00 $ 3,750.00 $ 685.00 $ 3,425.00 $ 500.00 $ 2,500.00 428 6" - 45° Bend 6 EA $ 700.00 $ 4,200.00 $ 620.00 $ 3,720.00 $ 650.00 $ 3,900.00 $ 700.00 $ 4,200.00 $ 600.00 $ 3,600.00 $ 450.00 $ 2,700.00 429 12" X 8" Reducer 1 EA $ 1,000.00 $ 1,000.00 $ 770.00 $ 770.00 $ 948.00 $ 948.00 $ 950.00 $ 950.00 $ 888.00 $ 888.00 $ 650.00 $ 650.00 430 8" X 6" Reducer 2 EA $ 800.00 $ 1,600.00 $ 640.00 $ 1,280.00 $ 617.00 $ 1,234.00 $ 800.00 $ 1,600.00 $ 580.00 $ 1,160.00 $ 400.00 $ 800.00 431 Fire Hydrant Assembly 10 EA $ 6,000.00 $ 60,000.00 $ 3,600.00 $ 36,000.00 $ 4,520.00 $ 45,200.00 $ 4,500.00 $ 45,000.00 $ 4,185.00 $ 41,850.00 $ 4,500.00 $ 45,000.00 Water Service Reconnection at Main Incl. new saddle and corp. stop 432 5 1" Diameter 25 EA $ 500.00 $ 12,500.00 $ 200.00 $ 5,000.00 $ 220.00 $ 5,500.00 $ 350.00 $ 8,750.00 $ 205.00 $ 5,125.00 $ 400.00 $ 10,000.00 433 Water Service Line Replacement (_51" Diameter) 875 LF $ 45.00 $ 39,375.00 $ 40.00 $ 35,000.00 $ 22.00 $ 19,250.00 $ 30.00 $ 26,250.00 $ 20.40 $ 17,850.00 $ 20.00 $ 17,500.00 434 Curb Stop & Box (< 1" Diameter) 25 EA $ 500.00 $ 12,500.00 $ 500.00 $ 12,500.00 $ 220.00 $ 5,500.00 $ 350.00 $ 8,750.00 $ 204.00 $ 5,100.00 $ 500.00 $ 12,500.00 Water Service Reconnection at Main Incl. new saddle and corp. stop 435 I> 1" Diameter 2 EA $ 700.00 $ 1,400.00 $ 250.00 $ 500.00 $ 727.00 $ 1,454.00 $ 550.00 $ 1,100.00 $ 683.00 $ 1,366.00 $ 750.00 $ 1,500.00 436 Water Service Line Replacement (> i" Diameter) 70 LF $ 50.00 $ 3,500.00 $ 50.00 $ 3,500.00 $ 41.90 $ 2,933.00 $ 35.00 $ 2,450.00 $ 40.90 $ 2,863.00 $ 25.00 $ 1,750.00 437 Curb Stop & Box (> 1" Diameter) 2 EA $ 750.00 $ 1,500.00 $ 1,000.00 $ 2,000.00 $ 800.00 $ 1,600.00 $ 650.00 $ 1,300.00 $ 745.00 $ 1,490.00 $ 850.00 $ 1,700.00 438 Type 2 Pipe Bedding 150 CY $ 25.00 $ 3,750.00 $ 41.00 $ 6,150.00 $ 29.70 $ 4,455.00 $ 45.00 $ 6,750.00 $ 32.00 $ 4,800.00 $ 30.00 $ 4,500.00 439 Imported Trench Backfill 500 CY $ 25.00 $ 12,500.00 $ 30.00 $ 15,000.00 $ 29.70 $ 14,850.00 $ 35.00 $ 17,500.00 $ 33.70 $ 16,850.00 $ 20.00 $ 10,000.00 440 Trench Plugs 10 EA $ 1,000.00 $ 10,000.00 $ 830.00 $ 8,300.00 $ 780.00 $ 7,800.00 $ 500.00 $ 5,000.00 $ 745.00 $ 7,450.00 $ 1,200.00 $ 12,000.00 441 Insulation Board 1,712 SF $ 5.00 $ 8,560.00 $ 3.50 $ 5,992.00 $ 5.50 $ 9,416.00 $ 8.00 $ 13,696.00 $ 5.00 $ 8,560.00 $ 4.50 $ 7,704.00 442 Exploratory Excavation 16 HR $ 500.00 $ 8,000.00 $ 260.00 $ 4,160.00 $ 485.00 $ 7,760.00 $ 250.00 $ 4,000.00 $ 460.00 $ 7,360.00 $ 185.00 $ 2,960.00 443 Street Trench Repair 315 SY $ 125.00 $ 39,375.00 $ 252.00 $ 79,380.00 $ 180.00 $ 56,700.00 $ 120.00 $ 37,800.00 $ 174.00 $ 54,810.00 $ 50.00 $ 15,750.00 SCHEDULE 4 SUBTOTAL: $ 828,220.00 $ 793,725.00 $ 613,368.00 $ 666,070.00 $ 580,172.00 $ 522,349.00 BASE BID SCHEDULE 5 - SANITARY SEWER IMPROVEMENTS 501 Mobilization 1 LS $ 3,500.00 $ 3,500.00 $ 67,000.00 $ 67,000.00 $ 10,875.00 $ 10,875.00 $ 15,000.00 $ 15,000.00 $ 13,470.00 $ 13,470.00 $ 12,000.00 $ 12,000.00 502 Taxes, Insurance and Bonds 1 LS $ 2,000.00 $ 2,000.00 $ 3,200.00 $ 3,200.00 $ 4,500.00 $ 4,500.00 $ 4,000.00 $ 4,000.00 $ 4,185.00 $ 4,185.00 $ 4,250.00 $ 4,250.00 503 Traffic Control 1 LS $ 2,000.00 $ 2,000.00 $ 4,900.00 $ 4,900.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 9,950.00 $ 9,950.00 $ 2,500.00 $ 2,500.00 504 Stormwater Management and Erosion Control 1 LS $ 2,500.00 $ 2,500.00 $ 1.00 $ 1.00 $ 1,750.00 $ 1,750.00 $ 2,500.00 $ 2,500.00 $ 3,050.00 $ 3,050.00 $ 2,500.00 $ 2,500.00 505 By -Pass Pumping 1 LS $ 25,000.00 $ 25,000.00 $ 16,000.00 $ 16,000.00 $ 10,360.00 $ 10,360.00 $ 15,000.00 $ 15,000.00 $ 9,800.00 $ 9,800.00 $ 20,000.00 $ 20,000.00 506 Remove Existing Sanitary Sewer Main 788 LF $ 30.00 $ 23,640.00 $ 1.00 $ 788.00 $ 11.00 $ 8,668.00 $ 15.00 $ 11,820.00 $ 10.00 $ 7,880.00 $ 5.00 $ 3,940.00 507 Remove Existing Sanitary Sewer Manhole 2 EA $ 1,500.00 $ 3,000.00 $ 580.00 $ 1,160.00 $ 286.00 $ 572.00 $ 500.00 $ 1,000.00 $ 270.00 $ 540.00 $ 2,200.00 $ 4,400.00 508 Fill & Abandon Existing Sanitary Sewer Main 2.5 CY $ 1,000.00 $ 2,500.00 $ 860.00 $ 2,150.00 $ 350.00 $ 875.00 $ 500.00 $ 1,250.00 $ 340.00 $ 850.00 $ 1,000.00 $ 2,500.00 509 Abandon Existing Manhole in Place 1 EA $ 2,000.00 $ 2,000.00 $ 670.00 $ 670.00 $ 880.00 $ 880.00 $ 500.00 $ 500.00 $ 530.00 $ 830.00 $ 2,000.00 $ 2,000.00 510 Connect to Existing Sanitary Sewer Main 2 EA $ 2,200.00 $ 4,400.00 $ 1,200.00 $ 2,400.00 $ 2,200.00 $ 4,400.00 $ 800.00 $ 1,600.00 $ 2,142.00 $ 4,284.00 $ 400.00 $ 800.00 511 Connect to Existing Sanitary Sewer Manhole 4 EA $ 2,500.00 $ 10,000.00 $ 1,400.00 $ 5,600.00 $ 2,865.00 $ 11,460.00 $ 1,200.00 $ 4,800.00 $ 2,650.00 $ 10,600.00 $ 1,500.00 $ 6,000.00 512 10" PVC Sanitary Sewer Main 390 LF $ 120.00 $ 46,800.00 $ 55.00 $ 21,450.00 $ 73.30 $ 28,587.00 $ 75.00 $ 29,250.00 $ 68.30 $ 26,637.00 $ 55.00 $ 21,450.00 513 8" PVC Sanitary Sewer Main 535 LF $ 110.00 $ 58,850.00 $ 52.00 $ 27,820.00 $ 68.80 $ 36,808.00 $ 68.00 $ 36,380.00 $ 64.30 $ 34,400.50 $ 48.00 $ 25,680.00 514 48" Sanitary Sewer Manhole 3 EA $ 4,000.00 $ 12,000.00 $ 3,200.00 $ 9,600.00 $ 4,189.00 $ 12,567.00 $ 3,000.00 $ 9,000.00 $ 3,980.00 $ 11,940.00 $ 5,500.00 $ 16,500.00 515 Additional Manhole Depth 13.75 VF $ 350.00 1 $ 4,812.50 $ 90.00 $ 1,237.50 $ 196.00 $ 2,695.00 $ 95.00 $ 1,306.25 $ 194.00 $ 2,667.50 $ 185.00 $ 2,543.75 TABULATION OF BIDS EAST DOWNTOWN INFRASTRUCTURE IMPROVEMENTS - KU #1804-01309 CITY OF LAUREL, MONTANA February 13, 2020 This represents a true tabulation of bids opened and read on February 13, 2020. Travis Copper, PE Project Engineer Date: February 14, 2020 Engineer's Opinion of Cost COP Construction, LLC FirstMark Construction, LLC KLE Construction, LLC Knife River - Billings Wilson Bros. Constuction of Montana, Inc. Item Description Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 516 Sanitary Sewer Service Replacement 350 LF $ 200.00 $ 70,000.00 $ 10.00 $ 3,500.00 $ 21.00 $ 7,350.00 $ 20.00 $ 7,000.00 $ 20.40 $ 7,140.00 $ 30.00 $ 10,500.00 517 Type 2 Pipe Bedding 100 Cy $ 25.00 $ 2,500.00 $ 41.00 $ 4,100.00 $ 50.50 $ 5,050.00 $ 60.00 $ 6,000.00 $ 51.00 $ 5,100.00 $ 30.00 $ 3,000.00 518 Imported Trench Backfill 400 CY $ 25.00 $ 10,000.00 $ 30.00 $ 12,000.00 $ 29.70 $ 11,880.00 $ 35.00 $ 14,000.00 $ 33.70 $ 13,480.00 $ 20.00 $ 8,000.00 519 Exploratory Excavation 8 HR $ 500.00 $ 4,000.00 $ 260.00 $ 2,080.00 $ 485.00 $ 3,880.00 $ 250.00 $ 2,000.00 $ 460.00 $ 3,680.00 $ 185.00 $ 1,480.00 520 Gravel Alley Surface Repair 360 SY $ 35.00 $ 12,600.00 $ 17.00 $ 6,120.00 $ 7.00 $ 2,520.00 $ 25.00 $ 9,000.00 $ 12.00 $ 4,320.00 $ 18.00 $ 6,480.00 521 Street Trench Repair 15 SY $ 150.00 $ 2,250.00 $ 380.00 $ 5,700.00 $ 300.00 $ 4,500.00 $ 225.00 $ 3,375.00 $ 320.00 $ 4,800.00 $ 50.00 $ 750.00 SCHEDULE 5 SUBTOTAL: $ 304,352.50 $ 197,476.50 $ 180,177.00 $ 179,781.25 $ 179,604.00 $ 157,273.75 Total of Base Bid $ 3,426,333.95 $ 3,014,300.00 $ 2,747,831.00 $ 2,899,973.65 $ 2,487,572.50 $ 2,924,567.75 This represents a true tabulation of bids opened and read on February 13, 2020. Travis Copper, PE Project Engineer Date: February 14, 2020