Loading...
HomeMy WebLinkAboutResolution No. R17-27RESOLUTION NO. R17-27 A RESOLUTION OF THE CITY COUNCIL AUTHORIZING THE RELEASE OF FUNDS FROM THE TAX INCREMENT FINANCING DISTRICT FUND FROM THE LURA FACADE IMPROVEMENT GRANT PROGRAM FOR FACADE IMPROVEMENTS FOR THE EAGLES BAR LOCATED AT 313 WEST MAIN STREET. WHEREAS, the City of Laurel approved a Facade Improvement Grant Program proposed by the Laurel Urban Renewal Agency (LURA) through Resolution No. R10-116; and WHEREAS, the Eagles Bar submitted the attached LURA Facade Improvement Grant Program application for a total cost of approximately $22,500.00 for the facade improvements included with the application; and WHEREAS, the LURA Board reviewed the application and recommended approval for up to $13,450.00 in grant funding to help pay for the facade project; and WHEREAS, the application appears complete, the project is eligible for grant assistance and LURA recommends funding of the same. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Laurel, Montana, that the Eagles Bar is awarded up to $13,450.00 in grant funding on a one-to-one match basis for its fagade improvement project through the Fagade Improvement Grant Program for the eligible improvements described as attached hereto from the City's Tax Increment Financing District Fund. Introduced at a regular meeting of the City Council on June 20, 2017, by Council Member Mountsier PASSED and APPROVED by the City Council of the City of Laurel this 201h day of June, 2017. APPROVED by the Mayor this 20th day of June, 2017. CITY OF LAUREL Mark A. A. Mace, Mayor A 7*Q__�,_� Bethany Ke le Clerk/Treasurer Ap ved Sam S. inter, evil City Att ey R17-27 LURA Grant Funding — Eagle's Fapade To: Laurel City Council From: Noel Eaton, City Planner Re: LURA Fa;ade Grant for Eagles Date: June 13`", 2017 LAUREL/CITY COUNTY PLANNING DEPARTMENT Marvin Carter and the Eagles Bar applied for a Fagade Grant through the Laurel Urban Renewal Agency. The location is at 313 West Main Street. The Eagles have received two bids for $22,500 from Rudy Groshelie and $25,900 from J&J Construction. The Laurel Urban Renewal Agency has recommended an award up to 13,450 for a facade remodel at the Eagles Bar. The board unanimously (4-0) voted to approve the 1:1 match for fagade improvements. Any amount over $5,000 must be approved by City Council with a recommendation from the LURA Board. The application is attached. LAUREL URBAN RENEWAL AGENCY (LURA) Fagade Improvement Project Application (For ice Use Only Project Location Address of Property to be improved: Assessor Parcel Number(s): Can be found at h:/www.co.yellowstone.mt.us/gis/ Name of Business(es) in Project: Building Frontage Measurement of Project, Applicant Information Name: `/ i 1.1 Mailing Address: tel. State: Zip: Phone: Email: Do you own, rent or lease the subject property? Businesses or Services Offered on Site: Description of Please identify ways in which this project supports the Laurel Urban Renewal Plantfax Increment District mission (information available at City Hai): Submittals Application must include the following materials, if applicable, for consideration by the Fagade Incentive Grant Committee. Applications Backing snaftlelest materials to describe the project will not be reviewed. a) current Photo(s) of the proposed project site b) rendering or sketch of proposed improvements e) architectural plans, fimeluding dimensions/Measurements d) color and material samples for paint, awning, signs, etc. e) sign plans i) awing design g) historical signifleaance designation Estimated Costs and Timing: Please provide copies of vendor bids/estimates or other documentation of cost estimates for all proposed work fagade work. Applications Backing sufficient cost estimates will not be reviewed. a) Mater clean exterior $ b) Exterior prep and paint $ c) Window replacement/repair $ d) Door replacement/Entry Foyer Repairs $ e) Exterior Lighting $ fl Fagade restorationtrehabilitation $ g) Architectural/Design Fees $ ' f h) Landscapethardscape Improvements $ i) Building Permit $ j) Other Proposed Improvements (specify) $ $ Subtotal $ k) Signage $ 1) Awnings $ 6 Subtotal TOTAL ESTIMATED COST Estimated Days/I1IConths for Completion SIGNATURES: Signed: Signed S OC r;IclYD Z>--/. Property Owners) Signatuie(s) Applicant(s) Signature(s) Checklist: Please review the checklist below to ensure all information/nmtems have been prepared for submission with this application. Applicants are advised to submit a complete application and all supporting materials per the instructions in this packet; the committee will not review incomplete applications. jject location (page 5) Zsessor parcel number (page 5) p Building frontage measurement (page 5) Flicant information (page 5) ng of businesses or services offered on site (page 5) )9escription of proposed improvements (page 5) 44entification of project's support of the Urban Renewal Plan and/or Tau Increment 'District mission (page 5) Q Current photo of project site (page 6) Rendering or sketch of proposed improvements (page 6) Architectural plans — elevation drawing, dimensions, measurements, etc. (page 6) Color and material samples — as applies (page 6) S4WAwning design drawings and/or plans — as applies (page 6) Historical significance designation — as applies (page 6) QDocumentation of cost estimates — copies of vendor bids, estimates, eta (page 6) Signature of Property Owner (page 7) Signature of Applicant (page 7) APPROVAL (for office use only) Amount Approved: Hate Approved: 08/20/2010 j - - - - - - -- - - e�Xz; lie ZIz wa- - ---- ----- rl — ! 15� 0— ha n -."d= n?, Pago 1 of 1 J &3 CONSTRUCTION Jme !;4.ic1,e, i406t 69~•1,q.9e� 15U) Ave F Billings i;qf v mpiete faCe HE to Front of FOE i„ Laurer. 12 & A Lantos,,, / install now; fiber grass fra;rre windo4'd RemC-%ie old stuccq Mvm to Imming / re -frame entire Rant of (Oginai hpii{iing ana r -level ead squirt: u,, wii;jre wall/ ir?s;aEt new :sheathing l)S$ / latish bvi;h r.;.:;.5 i"xtertor insuli)HOlr finishing Sy. cvom). Pie.=,se look up this ,ysti�rri on the vget, if ynu are not ar;idki; i'ra:ne Out t',ntire * all to ino t_ut with 'rhe+ other �Lo!* '.rent i dt,- ill / install new sheathing/ firdsh a:ith EIFS VL',v1scO; store (rant t+tits? Bri ftor smw corrug-3tFd tsa:tic 3 ruwr1 ?.,,d rt,.,pnt-r penny piss) inskail emrcv. Steel in entire e;Itrfw;,V. If you agree- on our yunte w iF can ge: a detailed contract reacly. $25,3(]0.00 material avid labor ali inclMed, ei5o incl.-idos intra, for trim of►I'.