Loading...
HomeMy WebLinkAboutInterstate Engineering (2)l~H ~5~ATE ENG. PAGE 02!02 INTERSTATI~ ENGINEEI{ING November 19, 2007 Mr. NOrm Stamper City of Laurel 116 West First Street P.O. Box 10 Laurel, MT ,59044 Re: Laurel Cemetery Master Plan Q:~ROJEC'I~'~Y06-O0~?I - laurel Oemet~y E~nslon~OC'tLtr, to Norm St~mpe~.do= Dear Norm: I have been in touch with Jolene Rieck of Peaks to Plains Design .concerning the development of a master plan for the Laurel Cemetery. Interstate Engineering, in association with Peaks to Plains Design, will prepare the Laurel Master Plan for a lump sum fee of $8,400.00. ,Service to be provided under this master plan would be similar to those that we are providing for Yellowstone County for the Yellowstone County Veteran's Cemetery. The proposal would include preparation of maps anti displays for a public meeting along with a written master plan document that would contain long range plans for irrigation and development of the cemetery. If you and the Council find this proposal satisfactory, please send us a letter and we will prepare an amendment to our original agreement with the City of Laurel and proceed with the work as soon as possible. Sincerely, INTERSTATE ENGINEERJNG, INC. William O. En~ght, P.E.~' Senior Project Engineer/Office Managsr cc: Jolene Rieck. Peaks to Plains Design Professionals you need, people yotz ~'ust