Loading...
HomeMy WebLinkAboutSwimming Pool Committee Minutes 12.09.2004 CITY OF LAUREL SWIMMING POOL COMMITTEE MINUTES OF DECEMBER 9, 2004 MEETING Present: Kate Stevenson, Donna Hirt, Marvin Carter, Steve Klotz, Robin Herman, and Cal Cumin. Also present: Craig Canfield. No public comment. Marvin moved to approve the minutes of the last meeting; carried. Donna said her swimming pool records were misplaced, and she could not give us a report of numbers, etc. as requested at the last meeting. Steve discussed the current parks budget and the planned park maintenance district (PMD). He said the parks and the pool are under one budget with about $150,000 for the current fiscal year for parks and $55,000 for the pool for a total of about $200,000. Swimming Pool: Salaries and Wages: $6,000 Health Insurance $1,700 Taxes $500 Lifeguards and Manager $32,000 Supplies and Chemicals $9,000 Utilities $5,000 $54,200 Salaries end Wages $73,000 Com $4,000 Health Insurance $20,000 Federal Taxes $6,000 Operating Supplies $7,000 Machinery and Equipment $5,000 Utilities $11,000 Tree Trimming $5,000 Miscellaneous $14,000 Contracted Services $5,000 $150,000 A City Council ad hoc committee is doing a mini-capitol improvements program to determine how much is needed to construct new equipment in the parks. The approximately $200,000 saved per year by using a PMD would go toward allaying employee layoffs. Craig Canfield of Interstate Engineering presented three footprint layouts of the possible swimming pool plans along with costs and possible funding procedures for each. These are here attached. Laurel Aquatics Complex Review December 2004 I.E. #Y04-4-143 The City of Laurel is considering replacing their existing swimming pool. The committee requested several options to evaluate for construction costs, operation and maintenance costs and potential revenue generation. The information provided on the existing swimming pool budget shows annual income of $6,612.00 and an operating budget of $55,342.00 for a net loss of $48,730.00. The purpose of constructing a new aquatics complex is to replace an old and outdated facility with a new complex that would offer more entertainment and a greater potential for revenue generation. The three complexes outlined in this report all will have higher operating costs due to increased staffing requirements but the revenue will also increase. The past several complexes we have been involved with showed a large increase in the average daily attendance and a large increase in revenue. This report will outline a conservative approach to expected revenue and expenses to give the committee a basis of comparison. Once a final complex is selected, a more detailed estimate of income and expenses will be generated. The following is a brief description of the three compIex layouts. Each option has the same bathhouse and concession building layout that was used for the purpose of estimating. Option I - This complex has one body of water that has an activity pool area with a zero- depth entry, a recreation pool area with depths from 18" to 4', a 3'6" deep swim channel with a bubble bench and spray attractions, and a plunge pool for the tower waterslide that is 3'0" to 3'6" deep. Option II - This complex has one body of water that includes an activity pool area with zero-depth, a recreation/lap pool area with depths from 3'6" to 6' and a plunge pool area for the tower waterslide that is 3'0" to 3'6" deep. Option III - This complex consists of three separate bodies of water. A separate activity pool with zero-depth entry, a 5-lane 25-yard lap pool with depths from 3'6" to 6'6" and a 6 deep Lazy R~ver w~th an attached plunge pool for the tower waterslide Construction Cost Estimates The estimated construction cost, staffing requirements and recommended bather loads are summarized below, the detailed estimates are found at the end of this report. Option Construction Cost Staff/Shift Bather Load I $2,484,000.00 12 690 II $2,080,000.00 9 470 III $2,865,000.00 14 740 Operating Cost Estimates Salaries Fringe Benefits Chemicals Utilities Telephone Maintenance Advertising Miscellaneous Total Cost to Operate 80 Days Option I Option II Option III $86,400.00 $64,800.00 $100,800.00 $12,960.00 $9,720.00 $15,120.00 $18,800.00 $10,500.00 $19,500.00 $20,000.00 $14,000.00 $22,000.00 $800.00 $800.00 $800.00 $2,000.00 $1,500.00 $2,500.00 $500.00 $500.00 $500.00 $2,000.00 $2,000.00 $2,000.00 $143,460.00 $103,820.00 $163,220.00 Revenue based on 75% design loading for 80 days. 100% pay entrance fee $2.00* *no slide or tube, but use of activity and recreation or lap pools 60% pay activity fee $3.00' *for everything Total fee for complete access $5.00 Entrance Option I Option II Option HI Daily Use 520 350 555 Entry Fee $83,200.00 $56,000.00 $88,800.00 Activity Fee $74,880.00 $50,400.00 $79,920.00 Total $158,080.00 $106,400.00 $168,720.00 The cost comparison and the loan payback rate is shown below: General Obligation Bond Annual Payment Option I Option II Option III 20 years @ 51/2% $205,000.00 $171,000.00 $236,000.00 Value of a mil in Laurel $5,697.00 $5,697.00 $5,697.00 Number of mils to raise annual payment S35.98 $30.02 $41.43 Actualvaluation of Laurel $184,580,011 $184,580,011 $184,580,011 Cu,~,t G.O. General Obligation bond $0.00 $0.00 $0.00 indebtedness Maximum allowed by statute (MCA 7-16- $1,661,220.00 $1,661,220.00 $1,661,220.00 4104) (0.9% of assessed valuation)** Residential Property Value $50,000.00 $75,000.00 $100,000.00 Taxable Estima~dAnnual Tax Option I Option II Option III $951.00 $34.22 $28.55 $39.40 $1,785.00 $64.22 $53.59 $73.95 $2,060.00 $74.12 $61.84 $85.35 To find an individuals property tax, they should take their taxable value found on their tax statement and multiply by 0.03598 for Option I; 0.03002 for Option II; or 0.04143 for Option III. The information above also shows that the maximum G.O. bond Laurel could pass by statue is $1,661,000.00. All the options are estimated higher than that limit. ** Montana Code Annotated 2003 Previous Section. MCA Contents . Part Contents · Search - Help - Next Section 7-16-4104. Authorization for municipal indebtedness for various cultural, social, and recreational purposes. (1) A city or town council or commission may contract an indebtedness on behalf of the city or town, upon the credit of the city or town, by borrowing money or issuing bonds: (a) for the purpose of purchasing and improving lands for public parks and grounds; (b) for procuring by purchase, construction, or otherwise a swimming pool facility, athletic field, skating fink, playground, museum, golf course, site and building for a civic . center, youth center, or any combination of these facilities; and (c) for furnishing, equipping, repairing, or rehabilitating a swimming pool facility, athletic field, skating fink, playground, museum, golf course, civic center, or youth center. (2) (a) The total amount of indebtedness authorized to be contracted in any form, including the existing indebtedness, may not at any time exceed 0.9% of the total assessed value of taxable property, determined as provided in 15-8-111, within the city or town, as ascertained by the last assessment for state and county taxes prior to the incurring of the indebtedness. (b) Money may not be borrowed for any purpose on bonds issued for the purchase of lands and improving the land until the proposition has been submitted to the vote of the qualified electors of the city or town and a majority vote is cast in favor of the proposition. History: En. Sec. i, Ch. 55, L. 1909; re-en. Sec. 5159, R.C.M. 1921; amd. Sec. 1, Ch. 114, L. 1923; re- eh. Sec. 5159, R.C.M. 1935; amd. Sec. 1, Ch. 71, L. 1945; amd. Sec. 1, Ch. 64, L. 1947; R.C.M. 1947, 62- 201; amd. Sec. 28, Ch. 253, L. 1979; amd. Sec. 55, Ch. 614, L. 1981; amd. Sec. 14, Ch. 459, L. 1997; amd. Sec. 1, Ch. i36, L. 1999; amd. Sec. 30, Ch. 426, L. 1999; amd. Sec. 25, Ch. 556, L. 1999; amd. Sec. 21, Ch. 29, L. 2001. <> The following table shows how the project components are grouped. Bathhouse/Site Work/Parking Lot Pools/Deck/Fence Attractions Concessions Miscellaneous Total Construction Option I $630,000.00 $876,50O.00 $265,500.0O $103,000.00 $104,500.00 $1,979,500.00 Option II $625,OOO.OO $595,500.00 $265,000.00 $103,000.00 $90,000.00 $1,678,500.00 Option III $655,000.O0 $1,093,500.00 $265,0O0.O0 $103,000.00 $150,500.00 $2,267,000.00 The optionsare overthe statutory lirnimtion as follows: Option I $823,000.00 Option H $419,000.00 Option l II $~,204,000.00 The concession building could be built at a later date in each option which would save $103,000.00 on the original project cost of each, but that would still be over the limit. The other course of action is to select the option that most appeals to the majority of the committee and determine the final scope and try for additional means to finance the construction - donations, sponsorships, in-kind work, etc. The grant possibilities for swimming pools are fairly limited. We are at the stage that the committee needs to develop a project that will fit the needs of the public. The final financial package will be based on the project the community wants. Estimate of Probable Cost Aquatic Complex Options Laurel, Montana I.E. #Y04-4-143 Option I - Activity Pool / Tower Waterslide (double flume) / Plunge Pool / Swim Channel / Teaching Area Mobilization 1 Demolition 1 Bathhouse - General 1 Bathhouse - Electrical Bathhouse - Mechanical 1 Concession / Pump Room - General 1 Concession / Pump Room - Electrical 1 Concession / Pump Room - Mechanical 1 Concrete Pool Construction 1 Recirculation System / Chemical Feed 1 Concrete Deck 15,500 Fencing 550 Electrical / Utility Service 1 Pool Finish 1 Water Slide - Double Flume 1 Activity Piping 1 Site Work 1 Swim Channel Pump System 1 Pool Heater 1 Activity Feature Allowance 1 Deck Equipment 1 Parking Lot / Site Access 1 LS @ $50,000.00 LS @ $8,000.00 LS @ $300,000.00 LS @ $75,000.00 LS @ $55,000.00 LS @ $80,000.00 LS @ $17,500.00 LS @ $5,500.00 LS @ $400,000.00 LS @ $196,000.00 SF @ $7.00 LF @ $30.00 LS @ $37,000.00 LS @ $75,000.00 LS @ $225,000.00 LS @ $15,000.00 LS @ $70,000.00 LS @ $30,500.00 LS @ $15,000.00 LS @ $40,000.00 LS @ $35,000.00 LS @ $130,000.00 Total Estimated Bid - Option I Contingency Total Estimated Construction Engineering Administrative / Legal Total $50,000.00 $8,000.00 $300,000.00 $75,OOO.OO $55,000.00 $80,000.00 $17,500.00 $5,500.00 $400,000.00 $196,000.00 $108,500.00 $16,500.00 $37 000.00 $75 000.00 $225 000.00 $15 000.00 $70 000.00 $30 500.00 $15 000.00 $40 000.00 $35 000.00 $130,000.00 = $1,984,500.00 = $195,500.00 = $2,180,000.00 = $239,000.00 = $65,000.00 = $2,484,000.00 C:\Documents and Setlings\CraigCSLocal Setfings~,Temporary lnternet ~'iles~,Content IE5XV y 70 S Q23~_.s fi mate of Probable Cost.doc Option II - Activity Pool / Tower Waterslide (double flume) / Plunge Pool / Lap/Recreation Area / Teaching Area Mobilization 1 Demolition 1 Bathhouse - General 1 Bathhouse - Electrical 1 Bathhouse - Mechanical 1 Concession / Pump Room - General 1 Concession / Pump Room - Electrical 1 Concession / Pump Room - Mechanical 1 Concrete Pool Construction 1 Recimulation System / Chemical Feed 1 Concrete Deck 10,050 Fencing 400 Electrical / Utility Service 1 Pool Finish 1 Water Slide - Double Flume 1 Activity Piping 1 Site Work 1 Pool Heater 1 Activity Feature Allowance 1 Deck Equipment 1 Parking Lot / Site Access 1 LS @ $45,000.00 LS @ $8,000.00 LS @ $300,000.00 LS @ $75,000.00 LS @ $55,000.00 LS @ $80,000.00 LS @ $17,500.00 LS @ $5,500.00 LS @ $269,000.00 LS @ $131,000.00 SF @ $7.00 LF @ $30.00 LS @ $37,000.00 LS @ $50,000.00 LS @ $225,000.00 LS @ $15,000.00 LS @ $65,000.00 LS @ $10,000.00 LS @ $40,000.00 LS @ $35,000.00 LS @ $130,000.00 Total Estimated Bid - Option I1 Contingency Total Estimated Construction Engineering Administrative / Legal Total $45,000.00 $8,000.00 $300,000.00 $75,O0O.O0 $55,000.00 $80,000.00 $17,500.00 $5,500.00 $269,000.00 $131,000.00 $73,500.00 $12,000.00 $37,000.00 $50,000.00 $225,000.00 $~5,000.00 $65,000.00 $10,000.00 $40,000.00 $35,000.00 $130,000.00 = $1,678,500.00 = $161,500.00 = $1,840,000.00 = $195,000.00 = $45,000.O0 = $2,080,000.00 C:XDocuments and Seffin gs\CtaigC'M..oeal Settings\Temporary Intemet Files\Content, lE5gVY7OSQ23',Estimate of Probable Cos/doc Option III - Activity Pool / Tower Waterslide (double flume) / Plunge Pool/Lazy River / Lap Pool Mobilization 1 Demolition 1 Bathhouse - General 1 Bathhouse - Electrical 1 Bathhouse - Mechanical 1 Concession / Pump Room - General 1 Concession ! Pump Room - Electrical 1 Concession / Pump Room - Mechanical 1 Concrete Pool Construction 1 Recimulation System / Chemical Feed 1 Concrete Deck 16,500 Fencing 600 Electrical / Utility Service 1 Pool Finish 1 Water Slide - Double Flume 1 Activity Piping 1 Site Work 1 Lazy River Pump System 1 Pool Heater 1 Activity Feature Allowance 1 Deck Equipment 1 Parking Lot / Site Access 1 LS @ $60,000.00 LS @ $8,000.00 LS @ $300,000.00 LS @ $75,000.00 LS @ $55,000.00 LS @ $80,000.00 LS @ $17,500.00 LS @ $5,500.00 LS @ $485,000.00 LS @ $245,000.00 SF @ $7.00 LF @ $30.00 LS @ $37,000.00 LS @ $95,000.00 L$ @ $225,000.00 LS @ $45,000.00 LS @ $95,000.00 LS @ $70,000.00 LS @ $20,000.00 LS @ $40,000.00 LS @ $45,000.00 LS @ $130,000.00 Total Estimated Bid - Option I/I Contingency Total Estimated Construction Engineering Administrative / Legal Total $6O,OOO.OO $8,000.00 $300,000.00 $75,000.00 $55,000.00 $80,000.00 $17,500.00 $5,500.0O $485000.00 $245 000.00 $115 500.00 $18 000.00 $37 000.00 $95 000.00 $225 000.00 $45 000.00 $95 000.00 $70 000.00 $20 000.00 $40,000.00 $45,00O.0O $130,000.00 = $2,266,500.00 = $263,500.00 = $2,530,000.00 = $260,000.00 = $75,000.00 = $2,865,000.00 CADoeuments and Setfings\CraigC~ocal SettingsWemporary lntemet Files\Con~ent. lES~VY7OSQ23~Estimate of Probable Cost.doc