RE: Grant Awards for the Federal Fiscal Year (FFY)2004 Community Development
Block Grant (CDBG) Public Facilities Competition
Dear Mayor Johnson:
It is my pleasure to inform you that the application submitted by the City of Laurel has
been selected for contingent funding for the Federal Fiscal Year (FFY) 2004 CDBG
Public Facilities grant competition.
Attached to this letter are the ranking results for the final ten applicants, including brief
summaries of the seven contingent approved projects for funding. Under our new "fast
forward" system (defined upon request), these tentative grant funds including your
proiect funds, will not be quaranteed and available until approximately April, 2004 since
they are contingent on Congress' passage of the FFY 2004 HUD bud,qet.
The applications were evaluated according to the adopted guidelines for the 2004
CDBG Program by MDOC staff. In addition, two engineering firms (Morrison-Maierle,
Inc. and Robert Peccia & Associates, Inc.) provided detailed technical reviews of the
water and wastewater-related applications. On August 7th, the CDBG staff met with the
review engineers to discuss their recommendations in detail and to assure that the
scores assigned were consistent with the ranking criteria.
We have tentatively allocated a maximum of $500,000 for your project. The allocation
of this amount does not imply approval of all the activities or the specific budget
proposed in your application. We cannot commit a specific level of funds to your project
until you complete budget and contract negotiations with the CDBG staff and comply
with any conditions established as a prerequisite to receipt of CDBG funds. In addition,
as explained above, since these funds are contingent on Congress' passage of the FFY
2004 HUD budget, we ask that local governments not obligate this tentative award or
incur costs related to the CDBG grant awards until notified by CDBG staff.
CDBG staff plan to conduct a grant administration workshop this fall to provide training
for all the seven new grantees. More infon-nation will be forthcoming shortly.
I have enclosed copies of the ranking results and project summaries. Each applicant
will receive a written evaluation of their application in the near future which describes
the rationale for the ranking scores assigned to the application. The evaluation will
include the Department's and consulting engineers' comments, as applicable.
The tentative award of these CDBG funds places a special responsibility on the City of
Laurel and this Department to assure that your project is well managed and achieves
the objectives set out in your grant application. Again, my congratulations to you on your
successful competition in Montana's Community Development Block Grant Program.
Sincerely,
Mar~A~. S~o~
Director
CC: Patrick Murtagh, Administrator- Montana Engineering & Administration, P.C.
Jason Mercer- Morrison-Maierle, Inc.
Community Development Block Grant (CDBG)
Pubfic Facilities Grant Competition - for FFY 2004 Funds
Montana Department of Commerce
August, 2003
500,000 ~:;~ 0 , ,~ 1 700
379,200 ~ I 2 63s
302,000 ¢~ 3 633
252,085~ ~ 4 602
248,000
~ 6 581
500,000 ;~ , :~:~;~ ~ ~; 7 533
soo,ooo ~ ~ ~33
500,000 ;~f~:~~ ~ 9 278
225,000
~:~ff 10 **(547)
(Awarded Amount) $ 2,701,285
**Did not meet LMI benefit requirements.
8/27/2003
1:55 PM L:\CDBG\RANKINGS\FFY 2004\Public Facilities\Genera0Ranking Results -- Aug. '03 PF Projects
May, 2003 CDBG Public Facilities Competition
Unfunded Application Summaries
For FFY 2004 Funds
APPLICANT: Blaine County
TYPE OF PROJECT: Fire Hall
CDBG AMOUNT: $ 225,000
OTHER: $ 75,000 County- Local
$ 50,000 County-Agreement
$ 5,000 County- In-Kind
$ 50,000 City- Local
PROJECT TOTAL: $ 405,000
COMMUNITY INFORMATION
Population Served: 7,009
Number of Households: 2,501
Benefit to Low and Moderate Income
Households
County: 53.7%
Project Area: Less than 51%
Number of Hookups: NA
SUMMARY: Blaine County does not have rural fire districts but is served by six fire departments. The
Chinook Fire Department, established in 1904, serves 84 miles north and south of Chinook and 23 miles
east and west of Chinook. This department covers approximately one-half of the land area of the county.
The city also has a volunteer department that serves within the city limits. The two separate facilities
have resulted in delay in response time. This project would construct a new vehicle storage building
adjacent to the county's existing fire department, which would allow the city and county fire departments
to be housed in one fire complex. In addition, modifications would be made to utilize the space more
effectively and efficiently.
APPLICANT: City of Bozeman, on behalf of Reach, Inc.
TYPE OF PROJECT: New Work Center for the Disabled
CDBG AMOUNT: $ 500,000
OTHER: $ 445,831 First Security Bank
$ 200,000 Capital Campaign
$ 500,000 Sale of current building
$ 37,350 Reach, Inc. Reserves
PROJECT TOTAL: $ 1,683,181
COMMUNITY INFORMATION
Population Served: 94
Number of Households: 94
Benefit to Low and Moderate
Income Households: 73%
Number of Hookups: NA
SUMMARY: Reach, Inc., a private non-profit organization established in April, 1974, has been providing
residential and vocational services to approximately 100 adults with disabilities in Bozeman and the
surrounding area. The current work center has become overcrowded and makes it impossible for Reach
to serve an ever-growing number of people with disabilities. The proposed project would build a new
12,000 sq. ft. work center designed specifically for the purpose of improving conditions and increasing
the capacity to serve more disabled persons in need of these services.
APPLICANT: City of Shelby
TYPE OF PROJECT: Head Start, Pre-Head Start and Adult Education Facility
CDBG AMOUNT: $ 500,000
OTHER: $ 328,052 City of Shelby
PROJECT TOTAL: $ 828,052
COMMUNITY INFORMATION
Population Served: 3,216
Number of Households: '1,196
Benefit to Low and Moderate
Income Households: 34%
Number of Hookups: N^
SUMMARY: The proposed CDBG project would consist of saving and remodeling the unused Shelby
Middle School (Meadowlark Schooll so that it Could house the Head Start Program, the Pre-Head Start
Program, and Adult Education facilities. The Shelby Head Start program is currently housed in a local
church that has several problems: it lacks handicapped accessibility; the Head Starc children do not have
a playground and must cross the street to the idle Meadowlark School; it has no off-street parking to
accommodate the users of the Head Start facility, parents or Head Start bus; and the area becomes very
congested during pick-up and drop-off times. The remodeling of the school for the Shelby Head Start
Program would be one of the first phases of a larger project, the Shelby Main Street Revitalization
Project.
2
May, 2003 CDBG Public Facilities Competition
Funded Application Summaries
For FFY 2004 Funds
APPLICANT: Butte-Silver Bow
TYPE OF PROJECT: Infrastructure Improvements (Curbs, Sidewalk, Gutter and Sewer
and Water) for the Central Butte Neighborhood
CDBG AMOUNT: $ 248,000
OTHER: $ 82,500
PROJECT TOTAL: $ 330,500
COMMUNITY INFORMA T/ON
(Targeted Central Butte Neighborhood
Population Served: 110
Number of Households: 63
Benefit to Low and Moderate Income
(LMI) Households:
2003 Neighborhood Survey 97%
SUMMARY: The Main Street neighborhood in Butte is over 100 years old - with homes that were built
between 1896 and 1917. Currently, 81% of the sidewalks in the proposed three-block area are
considered highly substandard, resulting in dangerous conditions for the residents and the general
public. There is considerable foot traffic on these sidewalks as Main Street is a major thoroughfare to the
Central Business Distdct and to the only public high school in Butte. Improvements to this three-block
area would consist of removal and replacement of sidewalks, curbs and gutters, construction of
handicapped accessible ramps, replacement of hydrants, and installation of new sewer and water hook-
ups at eleven newly, constructed homes.
APPLICANT: Cascade County
TYPE OF PROJECT: Water DistributionNVastewater Collection
CDBG AMOUNT: $ 500,000
OTHER: $ 900,000 SmalITown Assistance Grants (STAG)
$ 500,000 Treasure State Endowment Program (TSEP)
$ 100,000 DNRC-~ Renewable Resource Grant & Loan (RRGL)
$ 480,000 State Revolving Loan Fund (SRF)
$ 20,000 TSEP/DNRC- Planning Grants
PROJECT TOTAL: $ 5,840,000
COMMUNITY INFORMATION
Population Served: 1,109
Number of Households: 442
Benefit to Low and Moderate
Income Households: 58%
Number of Hookups: 442
SUMMARY: The Upper/Lower River Road Water and Sewer District began developing in 1917 with the
first subdivision plat. There are now eight different subdivisions and five mobile home parks with on-site
water and wastewater systems. After doing a groundwater study in 1997-1998, the Montana Department
of Environmental Quality (MDEQ) and the City/County Health Department found high levels of nitrate and
ammonia in drinking water wells. This project proposes to install 25,700 feet of 8" PVC sewer lines,
23,200 feet of 8" PVC water mains, water meters for all users, and connect to the existing City of Great
Falls water transmission and sewer trunk lines that transect the District.
APPLICANT: Dawson County
TYPE OF PROJECT: Senior Citizens Center
CDBG AMOUNT: $ 500,000
OTHER: $ '~00,000 Local-Cash-County
$ 61,800 Local- Fundraising
$ 85,000 In-Kind- SiteWork
$ 5,000 Local- Preliminary Architectural/Grantwriting
PROJECT TOTAL: ++ $ 751,800
COMMUNITY INFORMATION
Population Served: 9,059
Number of Households: 3,625
Benefit to Low and Moderate
income Households: 51%
Number of Hookups: NA ;
SUMMARY: The Dawson County Senior Center building was constructed in the early 1920% and is
about 40' x 50' in size with a basement. Later a 40' x 50' addition was constructed to the north and
another 10' × 80' addition to the west around 1947. More recently, another 11' x 14' addition was
constructed to the nor[h. The building has reached its useful life span and must either be replaced or
extensively remodeled. Dawson County proposes to construct a new facility at an alternate location. This
facility would address all health and safety issues and provide a long-term solution to the problems it
faces with the current facility.
APPLICANT: City of Laurel
TYPE OF PROJECT: Wastewater Collection System
CDBG AMOUNT: $ 500,000
OTHER: $ 15,000 Treasure State Endowment Program (TSEP)
$ 268,000 City of Laurel- Sewer Enterprise Reserve
$ 10,000 Department of Natural Resources (DNRC)
PROJECT TOTAL: $ 793,000
COMMUNITY INFORMA T/ON
Population Served: 6,255
Number of Households: 2,529
Benefit to Low and Moderate
Income Households:
2000 Census: 48%
Laurel 2000 Income Survey: 56%
Number of Hookups: 2,907
SUMMARY: The City of Laurel's wastewater facilities consist of a wastewater collection system
(constructed in 1910), two lift stations, and a wastewater treatment facility. The treatment plant is
currently treating in excess of 1.0 million GPD of ground water during the summer months. During peak
flow events, the plant is not able to treat to permitted effluent limits. Increasing amounts of infiltration and
inflow are impacting the capacity of sewer mains within the collection system. The city proposes to repair
and replace within their wastewater facilities: the Idaho Avenue sewer main, an 8-inch sewer main
connected to the larger 18-inch plant trunk main, and the wastewater treatment plant drain pump station.
APPLICANT: City of Lewistown
TYPE OF PROJECT: Wastewater Facility Improvements
CDBG AMOUNT: $ 379,200
OTHER: $ 136,460 USDA/Rural Development
$ 29,680 Local -Cash
~. 600 Local- Match
PROJECT TOTAL: .$ 545,940
COMMUNITY INFORMATION
'opulation Served: 99
Number of Households: 48
Benefit to Low and Moderate
Income Households: 79%
Number of Hookups: 44
SUMMARY: The Joyland East area of Lewistown Heights was annexed by the City of Lewistown in
December, 2001. Due to growth expectations circa 1910, the Lewistown Heights area was platted to
accommodate substantial anticipated growth. Because of the overall age of the residences and their
septic systems, a number of systems are currently failing, including wastewater drainfields. Phase I of
the proposed project includes extending the city's wastewater service with gravity mains (eliminating
individual septic systems). This would include installation of 3,600 feet of new eight-inch gravity mains,
4,400 feet of four-inch service lines, 16 concrete manholes, 44 gravity service connections (to existing
dwellings), and four grinder pump-equipped service connections.
APPLICANT: Pondera County, on behalf of the Pondera Medical Center
TYPE OF PROJECT: Renovation/Expansion of a County Healthcare Facility
CDBG AMOUNT: $ 302,000
OTHER: $ 44,133 Pdvate Donations - Matching Funds
$ 59,205 Fundraisers - Matching Funds
PROJECT TOTAL: $ 405,338
COMMUNITY INFORMA T/ON
'opulation Served: 59
Number of Households: 59
Benefit to Low and Moderate Income
Households: 81%
Number of Hookups: NA
SUMMARY: Pondera Medical Center Extended Care (PMCEC) is a 59~bed extended care facility in
north central Montana (located in Conrad) which serves over 6,000 people from the communities of
Dutton, Brady, Conrad, Valier, Collins, and Depuyer. The Special Care Unit is a narrow controlled-entry
hallway created for residents suffering from AIzheimer's disease and other dementia-related disorders.
The census for this unit is at 19, which is 100% occupied, resulting in minimal space for the patients to
carry out their everyday activities. The dining area allows for only half of the residents, while the other
half are directed to take their meals in the hallway. The "living room" has the same space inadequacies.
The existing space in the Special Care Unit currently meets only the minimum standards of state
regulations. PMCEC proposes to expand the nursing home by adding a 2,000 square foot addition to the
Special Care Unit in order to increase the quality of life for a growing group of elderly residents who need
specialized, Alzheimer-related, long-term care.
3
APPLICANT: Town of Superior
TYPE OF PROJECT: Wastewater Lift Station Improvements
CDBG AMOUNT: $ 252,085
OTHER: $ 232,586 State Revolving Loan Fund
$ 19,500 Local- cash reserves
PROJECT TOTAL: $ 504,171
COMMUNITY INFORMA T/ON
Population Served: 893
Number of Households: 373
Benefit to Low and Moderate
Income Households: 66%
Number of Hookups: NA
SUMMARY: The existing wastewater treatment and collection system was built in 1969, utilizing an
aerated lagoon system, gravity coJlectJon and three lift stations to pump the collected waste. The
proposed project would include replacement of all three existing lift stations utilizing submersible pumps
located in new concrete wet wells. All pump controls wouJd be located above ground and the
submersible pumps could be removed for operation and maintenance without entering the wet wells.
The stations would have new controls and alarm systems complying with MDEQ design standards and
an ultraviolet disinfection system would be installed to treat the lagoon effluent.