Loading...
HomeMy WebLinkAboutTCSP Oversight Committee Minutes (18) OVERSIGHT COMMITTEE MINUTES OF SEPTEMBER 13, 2001 MEETING Members present: John Smith, Ken Olson, Stan Jonutis, Kate Stevenson, Cal Cumin, and Larry McCaun. The minutes of the August 23, 2001 meeting were approved (Kate so moved and John seconded). Cai reviewed the progress on the South First Avenue Streetscape in lieu of a presentation by Fischer and Associates. Before the latter completed this streetscape, Cai wanted the OC to be sure and understand the basic design being proposed, because all the rest of the recommendations will depend on that design. At present there is little street-way definition in the area--no controlled access, the sidewalks varies, there are pin-down parking stops, and the right-of-way is uncertain is some areas. For the purpose of this plan, a 70-foot right-of-way is assumed along the length of the study area. The basic lane design is two 12' travel lanes, a 13' turn lane in the center, and bike lanes on each side 5' wide. Stan noted that the use of rolled curb would give the bike lane the needed width without narrowing the tum lane more than MDT would support. Beyond the curb on each side is a 4.5' boulevard, a 5' walkway, and 5' of landscaping. The OC felt it important that the bikeway be stripped. Cal presented the updated budget and the breakdown of the planning process so far; handouts of each were given. Invoices for Fischer and Associates ($13,405.10) and Cumin Associates ($660) were presented. John motioned for approval with Kate seconding; motion carried. With no other business, the meeting adjourned. n CUMIN ASSOCIATES 907 AVE. B BILLINGS, MT 59102 Attn: CAL CUMIN Re: LAUREL MAIN STREET September 21, 2001 Invoice No: 4162 Project No: 01040 For professional services rendered for the period August 25, 2001 to August 31, 2001 for the referenced project. Contract % Work Amount Previous This Inv Description Amount To Date Billed Billed Billed BASE MAPS 1,950.00 100.00% 1,950.00 1,950.00 0.00 MTG/PUBLIC INV 260.00 100.00% 260.00 260.00 0.00 PREL SKETCH 3,120.00 100.00% 3,120.00 1,560.00 1,560.00 COST EST 1,950.00 100.00% 1,950.00 0.00 1,950.00 RVW MTG 520.00 100.00% 520.00 520.00 0.00 FINAL PLAN 3,900.00 100.00% 3,900.00 3,900.00 0.00 SUMMARY RPT 1,040.00 100.00% 1,040.00 936.00 104.00 PERSPECT SKETCH 2,080.00 100.00% 2,080.00 2,080.00 0.00 RENDERING 2,080.00 100.00% 2,080.00 2,080.00 0.00 INTERNET 3,000.00 100.00% 3,000.00 3,000.00 0.00 EXPENSES 1,100.00 100.00% 1,100.00 0.00 1,100.00 XTR-BULLETIN BD 1,000.00 100.00% 1,000.00 1,000.00 0.00 22,000.00 22,000.00 17,286.00 4,714.00 Total Fixed Fee $4,714.00 Invoice Total $4,714.00 '-' a I Job Description TCSP CUMIN ASSOCIATES Date 10/1112001 INVOICE _ r- Client City of Laurel POB 10 Laurel, MT 59044 _ J n Attn: Oversight Committee Qty Description Unit Price TOTAL F 1 I Motorized Transportation: 10 hours @ $55.00/hour $550.00 1 Non-motorized Trannsportion: 9 hours @ $55 $495.00 , 1 Sustainability in CBD: 8 hours @ $55 $440.00 1 I i Action Plan: 12 hours @ $55 i $660.00 I i $2,145.00 TOTAL $2,145.00 Thank you.