HomeMy WebLinkAboutCommittee of the Whole Minutes 04.16.2002MINUTES
CITY COUNCII. COMMITTEE OF THE WHOLE
APRIL 16, 2002 6:30 P.M.
COUNCIL CHAMBERS
MEMBERS PRESENT: Chairman Bud Johnson
Lauren Van Roekel (6:37 p.m.) Mark Mace
Gay Easton Daniel Dart
Dan Mears John Oakes
OTHERS PRESENT: Matt Erekson Steve Klotz
Steve Klotz explained the need for Ordinance No. 002-29. The city's building department
certification is governed by the State of Montana. A local building department is required to
meet certain credentials and is audited annually to retain its local jurisdiction. If Laurel were not
a local certified jurisdiction, we would revert back to the state's coverage. Since the state is
exempt from inspecting residential buildings, all plan reviews, zoning, and inspections for fire
prevention, construction, structural, and health and safety would not be completed for residential
buildings. The state would inspect commercial projects, but the turnaround time would be a
month or longer. State inspections would happen infrequently, causing commercial building
projects to be held up.
Certified local building departments are required to adopt the codes that are adopted by the State
of Montana. In the past, an administrative rule change or an updated code change was adopted
by ordinance. The State Building Department recently moved from the Department of
Commerce to the Department of Labor and Industries. With that move, many administrative
rules have been renumbered and there are amendments to building codes. The State is in the
process of adopting the International Building Codes to replace the Uniform Building Codes.
Because of these changes, many ordinances would need to be adopted in order to retain
certification for the city's building department. The state has recently approved an
administrative rule that permits the local jurisdiction to adopt an ordinance that would allow
changes by administrative order. Ordinance No. 002-29 would allow the City of Laurel to adopt
required building codes by administrative order.
Matt Erekson stated that the documentation was handed out at a council workshop. Matt
intended to handle the matter when he addressed chapter 15 of the code book. Because of
certification processes that he did not fully understand, it needed to be presented tonight in order
to stay certified for this process. A motion is necessary to place the item on the agenda under
unscheduled matters, and then another motion is needed to adopt the ordinance on the first
reading. The public hearing and second reading will then be scheduled.
Mayor Johnson explained that this is not the normal process. Due to the situation, he asked that
the ordinance be placed on the agenda under unscheduled matters.
Barron Parks and Michael Sanderson, from Engineering, Inc. attended the meeting. Barron
distributed copies of the Engineer's Estimate of Probable Cost for the Main Street project to
City Council Committee of the Whole minutes of April 16, 2002
provide curb and gutter replacement and to replace existing sidewalk on the north side of Main
Street. An estimate was presented for the project from 1~` Avenue to 4~' Avenue, and another was
presented for the project from 1~` Avenue to 3`d Avenue. The City of Laurel has received a grant
of $189,000 from the Department of Transportation for this project. Copies of the estimates aze
attached to these minutes.
The meeting adjourned at 6:50 p.m.
Respectfully submitted,
~.~k~~
Cindy Allen
Council Secretary
i.
ENGINEERING, -INC.
Consulting Engineers and fond Surveyors
15-Apr-02
constmctidn est
00064
Engineer's Estimate of Probable Cost
For
Main Street- Laurel - 1st to 3rd
To Provide Curb and butter replacement, Replace existing sidewalk on the North
side of Main Sweet in Laurel, Montana from Ist Avenue to 3rd Avenue
ALL ITEMS ARE COMPLETE IN PLACE
ITEM EST.
NO. QTY. UNIT DESCRIPTION - UNiT PRICE TOTAL PRICE
Curb, Gutter, and Sidewalk
101 580 CY Grading -Street Excavation Q $5.00 ! CY = $2,900.00
102 460 CY ~ ,Base Gravel ~ ~ $9.00 1CY = $4,140.00.
103 270 TN _ Asphalt ~ '- $35.00 I TN = $9,450.00
104 .16.2 TN ~ Asphalt OII ~ $175.00 ! TN = $2,835.00 -
105 910 LF ~ Concrete Curb and Gutter (i $15.00 ! LF $13,650.00
108 9,130 SF New 4" Sidewalk ~ $4.00 ! SF = $36,520.00
107- 600 SF - New 8" Sidewalk ~ ,$5.50 ! SF = $4,440.00
106 - 260 SF Wheel Chair Ramps ~ - Q $4.50 !SF = $1170.00
- Subtotal -Curb, Gutter, and Sidewalk Improvements ~ _ $76, 65.00
- Storm Orelnage
201 4 EA New 48" Storm Drain Manhole - ~ $1,800.00 ! EA = - $7,200.00
202. 325 LF New 12" Storm Drain -PVC ~ $20.00 ! LF = - $6,500.00
203 2 EA - Tle 12" Storm Dreln to Ex. Manhole @ $350.00 f EA = $700.00 .
204 6 EA _ New Type II Drop Inletg ~ $1,700.00 / EA _ $13,600.00
205 85 EA Remove Ex. l7rop Inlets C~ $200.00 / FA = ~ $17 000.00
Subtotal-Storm Drainage .. _ $45.000.00
Water Line improvements
301 3 F3, Adjust F,r. Water Valve Boxes to Grade - ~ $150.00 / EA = $450.00
302 9 EA ~ Adjust Ex. Wafer Shut-off Valves to Grade (ri! ' $150.00 / EA = $1,350.00
303 2 EA - New Fre Hydrant ~ $1,600.00 / EA = $3,200.00
304. 20 LF B" Hydrant Pipe Cog $30.00 / LF = $600.00
305 ~ 2 Fr\ New Valve far Fire Hytlront ~ $600.00 / EA = $1 200.00
- Subtotal -Water Llne Imorovemenfs - - = Sa.ann nn
Misc. Coss
401 8 EA ~ Relocate F~c. Ught Poles (~ $500.00 ! E4 = .$3.000.00
'402 7 LS Provide Conduit and Widng for Light Poles ~ .$500.00 ! LS = $500.00
403 5 EA ~ Relocate Ex. Power Poles ~ (at $500.00 / EA = $2,500.00
404 4 EA Relocate Ex. Signs - ~ $250.00 lEA = $1,OOD.00~
'405 4 EA New Stamped Bdcks and Tree Mulch Border ~ $650.00 / EA =- $2,600.00
406
- 1 LS Provide Inigation Sleeves for future use. @ $500.00. / LS = ~ $500.00
407 1 LS Traffic Control ~ ~ $5,000.00 ! LS = $5,000.00
- 406 2,500 UN ~ Miscellaneous Work ~ ~ $1.00 / UN ~ -$2 500.00
Subtotal-MISC. Cost = : $11,600.00
Total Construction Costs ~ - $138,455.00
. Mobillzatlon and Insurance (5%) - - - _ $6,923,25
~- ~ Construction Contingeney (70%) - ~ $13,846.50
Total Cost oT Bade Projeet Construction - - _ $159,234.75
Suite 200 Creekside 1001 S. 24th StreeYWest P.O. Bax 81345 Billings, MT 59108-1345 PHONE (406) 656-5255 FAX (406) 656-0961
Alternate Improvements
New Water Line
501 600 LF New 12-inch Water Maln ~ $30.00-I LF = $24,000.00
502 3 EA New 12-inch Gate Valves - (o] $1,200.00 I EA = $3,600.00
- 503 160 LF _ New 1-inch Service Pipe ~ $15.00 / LF = - $2,400.00
504 9 EA ConneG to Existing Service Pipe _ ~ $150.00 f EA = $1,350.00
505 ' 9 FJi 1-Inch Water Service (incl. Saddle and Cory) ~ ..$250.00 f EA = $2,250.00
506 4 EA ~ ConneG to Existing Water Main ~ $1,800.00 1 EA = ~ $7,200.00 --
507 ~ 2 EA 12x12x6-Inch Tee - ~ $1,200.00 / EA = $2,400.00
507 7 EA 12x12x8-Inch Tee ~ $1,200.00 ! EA $2,400.00 '
508 ~. 9 EA 1-Inch Curb Stop with Box ~ $180.00 ~! EA = $1,620.OD
509 1 EA New 12-inch to 8-inch Reducer ~ ~ - $500 DO / FA = - $500 DO
Subtotal • New Water Line - _ $47,720.00
-
- Cost Savings -Water
601 1 LS Cost Savings to Curb entl Gutter ProJeG ~ $1,800.00 f LS = $1,800.00 -
New Trees' "
701 1 LS Remove4 Existing, Trees @ $1,500.00- / LS = $1,500.00
702 1 LS ew InigaOon Sleeve, Pipe, Sprinklers and Water HOOku~ $2,000.00 / LS = $2,000.00
703 8 EA .New Locust Trees ' ~ $225.00 / EA $1,800.00
704 8 EA Stamped Bricks ahtl Mulch Border for Trees ~ $650.00 1 EA - _ $5 200 00 -
' .~ - Subtotal -New Trees ~ _ $10,500.00
`Cost Savings -Trees -
801 1 LS
j Cost Savmgs to-Curb and Gutter Project (~ $3,100.00 / tS - _ $3,100.00
Deeoratfve LlgfiBng -Comers Only
901-•~ 1 LS.' Conduit, Conductors, and Service Connect (a~ $2,OOD:00 f LS = $2,000.00 -
902 14 EA New Fixtures and Lamp Assemblies @ $400.00 ! F3, _ $5,800.00
903 7 EA - New Decorative Light Poles
~ (off $1,400.00 / FA = $9,800.00
904 5,. EA -Concrete Fountlations (a1 $800 00 1 F11 = $4 500 00
Subtotal - Deeorstlve Lighting = , ~ $21,900.00
Cost Savings • Lighting
_ 1001 1 L5 Cast Savings t0 Curb and Gutter ProJeG ~ $500.OQ! LS = $500.OD
- Sub-Total New Water Llne _ $47,720.00
Sub-Total New Trees _ $10,600.00
_ Sub-Total Deeomttve Lighting - $21 900 00
Total Construetign of Altemate Improvements $80,120.00
Contingency (10%) ~ ~ - $8 012 00
Total Construction & Contingency $88;732.00
Englneerlgg Services - -
Engineedng and Design of Altemate Improvements = $10,135.18
_ Total Alternate Improvements - ~ _ $98,267.18,
- Two Block Summary
' Constmdion Costs - " $159,234.75
New Trees - ~ - ,_ $10,500.00
Cost Savings -Trees - - 3100.00
- ~ Decomttve LtghWg ~ 21900.00
.
Cost Savings -Decorative Lighting - _
500.00
Two Block Construction Total $ 188,034.75
.,
ENGINEERING, INC.
Consulting Fngineers and Lond Surveyors
i
^
12-Apr-02
consqucddn est ,
00064
Engineer's,Estimate of Probable Cost..
' For '
Main Street -Laurel - 1st to 4th
' ~ To Provide GLrb and Gutter replacement, Replace existing sidewallr on the Nor[h
side of Main Street in Laurel; Montaha from t st Avenue to 4th Avenue ~ `
ALL ITEMS A12E COMPLETE IN PLACE •
- -
ITEM EST. ~1.. ~
NO. QTY. UNI'4' DE3CRIPT(ON ~ - UNIT PRICE TOTAL PRICE
Curb, Gutter" and 8tdewatk
101 ~ 727 CY Grading -Street F~rcave8on - (q~ ~ $5.00 / CY = ~ $3,635.00 -
702 580 CY - Base Grovel ~ ~ ~ $9.00 !FY _ $5,040.00
103 352 TN ~ Asphalt - ~ (~ $35.00 ! TN _ $13,370.00
104 22.9 TN Asphalt OII ~ $175.00 ! TN = $4,007.50
.105 1,135 LF Canasta Curb and Gutter ~ $15.00 / LF = $17,025.00
106 12,263 , SF ~. New 4" Sidewalk ` ~ $4.00 / SF = $49,052.00
107 588 SF - NewB"Sidewalk
- ~ $5:50 ! SF ~ $4,873.00
.108 325 SF ~ Wheel Chfllr Ram ~' ~ - $4.50 f SF $1,482.50
, Sabtdtal - Curb. GU6er. and 3 dewatk Imnrnvwmonfe , - _ e..a .~~ ,.,.
1 401
402
403
404
405
406
407
~.
MJsc. Costs
7
- EA Reloarle Ex. Light Poles (i~ $500.00 ! FJ1 = $3,500.00
1 LS Provide Conduit and Wldng for Light Poles . ~ $500.00 I L5: _ $500.00 - ~ - -
' 5 FJ1 Reocate Fx. power Poles ~ (i$ $500.00 f FJa = $2;500.00
6
EA
Relocate Ex. Signs
~
$250.00 J FA = ,
$1,500.00
4 EA ~ New Stamped Bricks and Tree Mulch Boller @ . $850,00 1-FA = $2,000.00 ' -
1 LS Provide Irtlgatlon Sleeves for future use ~ @ $500.00 / LS = ~ - $500.00 -
1 -LS - Traffic Control ~ $5,000.00. ! LS = $5,000.00 .
00 UN Miscellaneous Work @j $1 00 JUN - $2 500 00 .
Sobtofal • Misc. Cost _ $12,100.00 - '
_ Total Constructon 4osts - $165,107.00
' Moblllzatlon end Insurance (5%) ~ - _ $8,258.35
Constrocton Con4ingency p0%) . ~ ~ - $16,510.70
' Total Cost of Base Protect Construction ~ $189,875.05 -
Suite 200 freekside ' 1001 S. 24th Street West P.O. Box 61345 Billings. Mi 59108-1345 PHONF (4061656-5955 FdX 14061 6 5 6-0 9 6 7
_ Storm Drainage ~ ~ -
201 5 - - F.A New 48" Stonn Drain Manhole ~ $1,800.00 / FA ~_ ~ $9,000.00
202 14 LF New 8" Stonn Dreln -PVC - ~ $18A0 ! LF ~ $252.011'
203 325 - LF - ~ : New.12" Storm Oreln-PVC
~ Q ~ $20.00 ! LF $8
500.00
204 1 Flt' , NewB".x8"Reducer ~ $15.00 /FA = ~ ,
$15.00~~
205 ~ 2 FA, Tle 12" Storm Drafty to Ex. Manhole - ~ ~ $350.00 / FA = .
$700.00 ' -
206 - 1 EA
- Tie 8" Storm Drain to Ex. Storm Drain ~ $225.00 / EA $225.00
207 8 ~ FA - New Type 14 Drop Inlets ~ $1,700.00 '/ EA $13,800.00
208 85 EA Remove Ex. Drop Inlets ~ $200 00 ! FA = $17 000 00 '
Subtotal -Storm Drainage _ $47,292.00
Water Line lmarovemenfs ~ " .
301 4 FA
~ - Adjust Ex. Water Valve Boxes to Grade ~ $150.00 / EA $800.00
302 ~ 11 FA AdJusl Fx. Water Shut-o8 Valves to Grade ~ ~ ~ ,$150.00 ! FA ~_ -$1,850:00
303. 2 to _ New Flre Hydrant
~ ~ $1,600.00 ! F3. _ $3200.00
304 20' LF 8"Hydrant Plpe
~ (~ $30.00 f LF = $600.00
305 2 EA ~
New VeNe`for Fie Hydrant - ~ $600 00 ! FA • - $1 200 00
Subtotal • Water Llna Improvements - s72sa.oo
- .~.
Alternate ImptvemeMs
New Water Line
501 1,164
~ LF New.12-inch Water Maln ~ $30.00 ! LF = $35
520.00
502 1 EA New 12-Inch Bend ~ $450.00 / FA ,
$450
00
503 4 Fro New 12-Inch Gate Valves ~ ($ $1,200.00 1 EA = .
$4
800.00
504 200 LF New 1-Inch Servl~ Pipe ~ $15.00 / LF = ,
$3
000.00
505 11 FJt Conned to Exlsdng Service Pipe ~ $150.00 ! EA = ,
$1
650.00
508
- 11 EA 1-Inch Water Service (InG. Saddle and Cory) ~ $250.00 ! FJ~ _ ,
$2
750
00
507
- 4
- Fro Conned to Existtng Water Maln - ~ $1,800.00 ! Fro _ ,
.
$7
200.00
508 2 EA
~ - 12x12x6-inch Tee ~ $1,200.00 / EA = ,
$2,400.j10
$08 2 EA 12x1Dc8-Inch Tee - ~ $1,200.00 !FA = $2
400
00
508 11 FJi ~ 1-Inch Curb Stop wRh Box ~ $180.00 ! FA ,
.
$1
980.00-
51 D 1 EA N_ ew 12•nch to 6-inch Reducer @ $500 00 / FA - ,
$500 00
Subtotal - Now Water Llne =, $62,650.00
Cost SavPn s• Water
601 1 LS Cost Savings to Curb and Gutter rajed ~ $2,250.00 ! LS = $2,260.00
New 7}ees
701 t
~ LS Remove 4 Exlsttng Trees ~ $2,000.00 / LS = $2
000.00 -
702 1
~ ~ LS ew Irtigatton Sleeve, Pipe, Spdnklere rand Water Hookup $3,000.00 ! LS = ,
$3
000.00
703 ~ 12 Fro ~ Now Locust Trees ~. ~ $225.00 I EA = ,
$2
700
00
704 12_ FJ1 Stamped Bricks and Mulch Border for Trees ~ $650 00 / EA - ,
.
$7 800 OD
. Subtoal-New Trees _ _ $15,600.00
801 1
D Cosf Savinga • Trees '
1 . LS Cost Savings to Curb and Gutter ProJed- ,~ $3,100.00 ! LS = - $3,100.00
- Decorefive Lighting • Comers Onty
901 1 LS Contlud, Condudow, and $ervlce Cbnned ~ -$2,000.00 / LS = $2
000
00
902 14 EA New Fsdures end Lamp Assemblies ~ $400.00 ! FJ~ _ ,
.
$5
800
00
903 7 FA New Dewretlve Light Pales ~ $1,400,00 ! EA = ,
.
$9
800
00 -
904 6 FA Conaete Foundations ~ $900 00 ! EA - ,
.
$5 400 00
. Subtotal-Decorative Lighting - _ $22,fi00.00
Cost Savings • Lighting
1001 1 LS - Cost.Savings to Curb and Gutter ProJed - (r~ $500.00 ! LS $600.00
- Sub•Total New Water Line
- = $62,650.00
Sub-Total New Trees ~ _ $15,500.00
Sub-Total Decorative LI htin - - $22 600.00
Total Construction of Alternate lmprovemenb $100,960.00
_ _ Contingency (10%) - $10 085 00
Total Construction & Contingency
~ $111,045.00
_ ~ Engfneerjn Services
Engrneedng and Design of Altamate Improvements
= _
$12,770.16
Total Alternate Improvelnants = $123,815.78