Loading...
HomeMy WebLinkAboutPublic Works Committee Minutes 03.16.2026 MINUTES a CITY OF LAUREL PUBLIC WORKS COMMITTEE MARCH 16,2026 The Public Works Committee meeting was called to order at 530 pm on Monday, 3116/26, by Chair Jodi Mackay. Members Present: Jodi Mackay—Chair, Iry Wilke—Vice Chair, Jessica Banks, Sam Naylor, Richard Herr and Shawn Mullaney Others Present: Matt Wheeler -Public Works Director, Ryan Welsh—KLJ Engineering Public Input: David Carlson from AE2S brought his company's 2025 Annual Utility Rate Survey for Matt. He also gave a copy to Jodi. General Items: 1. Approval of Minutes of 2/9/26. Motion made by Iry Wilke. Seconded by Shawn. Passed 6—0 2. Emergency Call Out Report- Report attached Minimal calls for the reporting period— 3 water shut off/turn on typically due to line breakage / leakage and 1 sanding call New Business: Old Business: 3. Engineering Services—The City's temporary contract with KLJ ends in April. City is accepting bids for a contracted engineering firm and will begin interviewing in April. Forrest Sanderson will facilitate the process as a non voting participant. Committee will consist of 4 employees, Matt and a representative from the P W committee. 4. West Railroad Storm Water Discussion—Ryan Welsh from KLI shared that he has submitted a contract and scope of services to address storm water on Woodland with an estimate of$2.5 million. This project would also include curb, gutter and sidewalk on Woodland. The storm water would tie into the new line on S 0. This would allow the project on West Railroad to move forward. Matt and Ryan are eying 2027 for this project and West Railroad in 2029. They would like to see the West Railroad project cc-occur with the CHS stormwater project to introduce economy of scale. Matt and Ryan would like to see KLJ on both these projects regardless of the engineering company picked in April's bid process due to Ryan's history and knowledge with these issues. i. The committee agreed a motion should be made to have Jodi email the Mayor to ask that this project/issue be added to a Workshop agenda in April. Iry made the motion Seconded by Jessica. Passed 6 —0. 5. Fire Hydrant by Middle School Update—no progress. We have a contract. Asphalt work tends to start in April. We will keep this on the agenda to ensure it stays on PW's radar as we move into Spring. Other Items: 6. Openings on Public Works Committee—We have 2 vacant seats. Interested parties should submit a letter of interest to the Mayor. Cherry Hills 4i° filing should be starting construction in 2 weeks. Casa Linda development working on getting things rolling. Love's Truck Stop has final construction walk through with the final city walk through happening soon. Neighborhood north of Iron Horse moving ahead with home construction. Jodi asked about how funds from recent water and sewer rate increases have affected the bottom line and how they are being saved to address the infrastructure needs of the community. Matt confirmed that rate increases were meant to cover future projects. Noted that increases have also leveled out income to expenses. Jodi will also ask this question at City Council Workshop on 3/17/26. Richard Hen asked about what the City will do if the Yellowstone River water level gets below the intakes. Matt reported that the City has a pump that can push water into the plant. Announcements Next Meeting will be Monday, 4/20/26 at 6pm in Council Chambers. Meeting adjourned at 6:05 pm Maintenance Shop 406-6284773 City dispatch 406-626-8737 Response Code %In CaWmn Not accepting Overtime/NA•Not Avaltable/Y=Res ponding/B=Phone Busy Employee Name Telephone 1248 Kevin Budge [nal Dylan Ceaser Jay nation kenh guy wade spalin er Brandon Gonzales aaron fox lost barnhardt Britl er Fourier krista gapslow 406 anthomywoudard shane nauman 11 Nick Lenchner Distribution 1-21 1-22 1d4 2.11 2-27 3-3 Justin Baker y3 2 1 na1 y7 2 I(emn Holtman 1 3 3 2 Y7 Darnel Nauman 2 1 2 na2 1 NA7 Elm UB Station 628-7773 Villa Station 628-5918 Dial 9 attar tone to acknowledge alarm Wastewater Treatment PI 284474 1 Autodailer- 6284866 Response Code NO-In worn Nolaccepting Overtime/NA=Not Available/ Y-Responding Employee Tele Thomas Henry Corey Caswell Corey Nicholson Norman Stamper a r reatrnent m Response Code NO=1n - Wmn Not accepting Overtime/NA-Nat Available/ Y=Respoodln Empl ee Telep HP Nuember r Irish Sa r am aggoner Joe waggoner TI Worbel dame)wallipprief r0n y0st Feel Matt Wheeler CNM 208-1885 1 One Call Locate- 1-800424-5555(Cby Jab 625663) Kurt Markelpid CelM 860-5785 Hm 200.2359 SCHESSLER6284221 HESTON281.0811 Mayor 406 633 3809 Dwight Ace Electric 406 697 2037 Travis Ace Electric 406 8500612 MDU 1.800-838-32781 MDT 2524138 pace Construction 252 5559(sewer backups) 3Wsn1Ua SyatemOmrno"we call DIED wiNing 24 hours 8%1115 pear Can Due-Date and Incldem Isea0on 1-21 h2o turn on 9th ave 14211n station Issues 1-24 water break action 2-11 h205hutall 401 cottonwood 2-18 aarldi 2-27 h2Dsnuta0 3-3 H20TURN0N