HomeMy WebLinkAboutOrdinance No. O24-01ORDINANCE NO. 024-01
AN ORDINANCE AMENDING 'TITLE 12 OF THE LAUREL MUNICIPAL CODE
RELATED TO THE STANDARDS FOR PUBLIC WORKS.
WHEREAS, the City Council desires to keep the Laurel Municipal Code current by
modifying and updating Chapters, Sections, and Subsections to address situations and problems
within the City and to remain in accordance with Montana law;
WHEREAS, City Staff prepared, reviewed, and approved the following amendments to
the existing LMC Title 12 — Streets, Sidewalks, and Public Places, as noted herein and hereby
recommends the same to the City Council for its full approval; and
WHEREAS, the proposed changes to the existing LMC Title 12 — Streets, Sidewalks,
and Public Places are noted herein and hereby fully incorporated herein, as follows:
Chapter 12.48 — Standards for Public Works
12.48.010 — Adoption of Standards for Public Works
The City of Laurel hereby adopts by reference the Standards for Public Works
as the Standards for Public Works which shall govern public works matters
within the City of Laurel. The Standards for Public Works is on file in the Office
of the Clerk -Treasurer and is hereby referred to, adopted, and made a part
hereof, as if fully set out, with the additions, insertions, deletion and changes, if
any, set by Ordinance.
This Ordinance shall become effective thirty (30) days after final passage by the City
Council and approved by the Mayor.
Introduced and passed on first reading at a regular meeting of the City Council on the
23rd day of April 2024, upon Motion by Council Member Mize.
PASSED and ADOPTED by the Laurel City Council on second reading on the 14°i day
of May 2024, upon Motion by Council Member Mackay.
APPROVED BY THE MAYOR on the 14`x' day of May 2024.
CITY OF LAUREL
Dave Waggoner, Mayor
Ordinance No. 024-01 Amend LMC Title 12 (Standards for Public Works)
ATTEST:
jejfAb;,�tr r, erk-Treasurer
APPROVED AS TO FORM:
Michele L. Braukmann, Civil City Attorney
Ordinance No. 024-01 Amend LMC Title 12 (Standards for Public Works)
Part 1- General Provisions
1.1 ESTABLISHMENT OF MINIMUM STANDARDS
This RubIie Werk Standards Manual, based gy-saute-ffaet+eaI, and wellestablished
prineipals of civil engineeF4%-, isThese Standards for Public Works Improvements are
prepared for the purpose of adopting minimum standards for the design of
improvements, kind and use of materials, methods of construction, and the
preparation of plans for construction, repair, or altematienaIteration of streets,
roadways, alleys, drainage, sewer, or water facilities which lie within FRURieipal Fight the
City of way OF ____meats Laurel.
1.2 UNIFORMITY OF ENGINEERING AND CONSTRUCTION PRACTICES
This —Publie—WerkThese Standards isfor Public Works Improvements are
established to promote the maximum uniformity of engineering and construction
practices within the community and thereby reduce design, supply, construction, and
maintenance costs.
1.3 General Specifications
Use Latest Edition of Montana Public Works Standard Specifications Including
Addendums Thereto and as Supplemented Herein.
1.4 General Design Standards
Use Latest Edition of State of Montana Department of Environmental Quality Water
Quality Division Circulars and as Supplemented Herein.
1.5 Adherence to Standards
It will be the policy of the Department of Public Works to require adherence to the
Standards set forth herein; however, where unique circumstances of design
consideration make it impractical to follow the Standards and where such adherence
would actually create problems detrimental to the public interest, the Department of
Public Works will consider alternate solutions and may approve departures from
Standards when substantiated by design analysis.
2. GentFaEt CGRStFUCtiOn Definitions
2.1 For the purposes of these specifications, the words and phrases set out in the following
articles shall have the meanings as follows:
a "Alley" means a narrow public thoroughfare, providing access to the rear of the
abutting properties. It also serves primarily as a service access to individual lots.
• "Appurtenances" refers to machinery, appliances, or auxiliary structures attached
to the sewer or water system to enable it to function, but not considered an
integral part of it.
• "Bicycle Path" and/or "Walkway" is an access way for non -motored use, primarily
for recreation use.
• "Boulevard" within the City is that area within any street, avenue, or highway right-
of-way not occupied by street paving, curb and gutter, and sidewalks. An "inside
boulevard" is the boulevard area on the property line side of the sidewalk. An
"outside boulevard" is the boulevard areas on the street side of the sidewalk.
• "Building Sewer" means the privately -owned extension of the building drain to the
public sanitary sewer or other place of disposal.
• "City" or "City of Laurel" means the City of Laurel in the County of Yellowstone and
State of Montana.
• "Collector Street" is a street used for major traffic flow. Access to residential lots
should be discouraged, and access to business lots should require turning lanes.
• "Combined Sewer" shall mean a sewer receiving both surface runoff and sewage.
• "Cross -slope" is the gradient determined by dividing the difference in elevation
from crown to pavement edge by the horizontal distance from crown to pavement
edge, expressed as a percentage.
• "Crown" is the highest part of the street shape between paving edges.
• "Curb Cut" means the total street curbing that is removed to place a driveway and
slopes.
• "Curb Return" means the curved portion of a street curb at driveapproaches
• "Custorner" rneans any person receiving municipal utility service either directly or
indirectly from the municipal water supply system/municipal wastewater system.
• "Discharge" is the direct or indirect introduction of treated or untreated
wastewater into the waters of the State of Montana, either through the municipal
wastewater system and municipal wastewater treatment plant or through a point
source into State waters.
• "Domestic Wastes" means liquid wastes
■ from the non-commercial preparation, cooking, and handling of food,
M
■ containing human excrement and similar matter from the sanitary
conveniences of dwellings, commercial buildings, industrial facilities, and
institutions.
• "Driveway" means that area on private property where vehicles are operated,
parked, or allowed to stand.
• "Driveway Apron" means the area, construction or improvement between the curb
cut or proposed curb line and the back edge of walk or proposed walk line, to
provide ingress and egress for vehicles from the alley, street or roadway to a
definite area of the private property.
• "Driveway Width" means that portion of the street curbing that is removed
excluding curb returns or transitions to provide ingress to and egress from abutting
property.
• "Environmental Protection Agency" or "EPA", means the U.S. Environmental
Protection Agency, or, where appropriate, the terms may also be used as a
designation for the administrator or other duly authorized official of EPA.
• "Excavation" shall mean and include any ditch, trench, cut, hole or change of grade,
including changes made by road grading by means of a blade or other device that
removes, alters or adds dirt, gravel, or alters the crown of a street or alley or affects
drainage.
• "Extension" means the act or process of extending, adding to, or enlarging the
municipal water supply system/municipal wastewater system on the City's side of
the point of delivery/point of connection to provide municipal utility services to a
prospective customer or group of prospective customers.
• "Fire Hydrant Meter" means the meter which is owned by the municipal utility and
which is used to measure the amount of water delivered to a customer through a
fire hydrant.
• "Fireline" means all service pipes, curb stops and/or valves, curb boxes and/or
valve boxes, backflow prevention devices, check valves, inside piping, fittings,
fixtures, and any other apparatus on customer's side of the point of delivery that
is used for, and limited to, the providing of water to customers for fire
suppression activities.
• "Grade" is the slope of the longitudinal road profile generally measured along
the centerline, expressed as a percentage.
• "Holding Tank Waste" means any waste from holding tanks such as vessels,
chemical toilets, campers, trailers, recreational vehicles, or septage haulers.
• "Individual Extension" means an extension of the utility system to provide utility
service to an individual customer.
• "Industrial" means of or pertaining to industry, manufacturing, agriculture,
commerce, trade, or business.
• "Industrial User" means (a) any person or source that introduces or discharges
wastewater from industrial processes into the municipal wastewater system or (b)
any non-domestic user or source regulated under Sections 307(b), (c), or (d) of the
Clean Water Act.
• "Industrial Wastes" or "Industrial Wastewater" means all liquid or water -carried
wastes other than domestic wastes. The terms includes, by way of example and
not by limitation, the trade wastes produced by food processing and bottling
plants, food manufacturing plants, slaughtering plants, tallow works, plating
works, disposal services, industrial cleaning plants, fertilizer plants, car and truck
washing operations, vehicle repair facilities, commercial laundries and cleaning
establishments, cooling plants, industrial plants, factories, feedlots, and chemical
treatment installations.
• "Interceptor Sewer" means a public sanitary sewer having a size greater than 24
inches that was installed by the City for the principal purpose of collecting and
conveying wastewater from several district trunk sewers to the municipal
wastewater treatment plant for treatment and disposal.
• "Intersection" means that area embraced within the prolongation or connection of
the lateral curb lines, or if none, then the lateral boundary lines of the roadways
which join each other at, or approximately at, right angles, or the area within which
vehicles traveling upon different roadways joining at any other angle may come in
conflict.
• "Local Street" is a street which provides access to individual lots or areas. Cul-de-
sacs are within this category. Traffic flow of 400 vehicles per day or less.
• "Main" means a pipe or conduit carrying water for domestic, industrial, fire
suppression, and other similar uses.
• "Meter" means the instrument, including any auxiliary equipment, which is used
to measure the amount of water delivered to a customer from the
municipal water supply system or the amount of wastewater contributed to the
municipal wastewater system by a user.
• "Municipal Wastewater Treatment Plant" means the wastewater treatment plant
owned and controlled by the City of Laurel.
• "Municipal Water Meter" means the meter, including the meter horn and remote
read equipment, which is owned by the utility and which is used to measure the
amount of water delivered to a customer through the customer's water service
line.
• "Municipal Utility" or "Utility" means the Public Works Department of the City of
Laurel.
• "Natural Outlet" means any outlet into a water course, pond, ditch, lake, or other
body of surface or ground water.
• "Person" means any firm, company, partnership, public or private corporation,
association, group or society, governmental agency, or other entity as well as a
natural person.
• "pH" refers to the negative logarithm of the hydrogen ion concentration in moles
per liter of solution. pH is an indicator of the acid or base content of the solution.
• "Point of Connection" means the point at which the municipal wastewater system
connects physically to a user's building sewer. The point of connection shall be
located at and include the user's service tee or wye fitting, which, in turn, is
normally attached to the public sanitary sewer located in the public right-of-way
that abuts and fronts the property to be served.
• "Point of Delivery" means the point at which the municipal water supply system
connects physically to a customer's corporation stop, which, in turn, is normally
attached to the public water main located in the public right -of way that abuts and
fronts the property to be served.
• "Pollutant" means any dredged soil, solid waste, incinerator residue, sewage,
garbage, septic waste, sewage sludge, munitions, chemical wastes, biological
materials, radioactive materials, heat, wrecked or discharged equipment, rock,
sand, cellar dirt, and industrial, municipal, and agricultural waste discharges into
water.
• "Pollution" means the alteration of the chemical, physical, biological, or
radiological integrity of water by human activity.
• "Polluted Waters" means water that contains objectionable wastes or suspended
solids as a result of human activity.
• "Pretreatment" or "Treatment" means the reduction of the amount of pollutants,
the elimination of pollutants, the alteration of the rate of their introduction into
the municipal wastewater system, or the alteration of the nature of pollutant
properties in wastewater to a less harmful state, prior to or in lieu of discharging
or otherwise introducing such pollutants into a municipal wastewater system. The
reduction or alternation can be achieved by physical, chemical, or biological
processes, process changes, or by other means, except as prohibited by 40 CFR
Section 403.6(d).
• "Pretreatment Requirement" means any substantive or procedural requirement
related to pretreatment, including National Categorical Pretreatment Standards,
imposed on an industrial user.
• "Private Water Service" rneans the water line owned by the property owner to
include curb stop, curb box, service line, meter loop and all internal building piping
excluding the water meter.
• "Public Building" means any building held, used, or controlled exclusively for public
purposes by any department or branch of government, federal, state, county, or -
municipal, without reference to the ownership of the building or of the realty upon
which it is situated.
• "Public Sanitary Sewer" means the sewer directly controlled by the City and laid
in the street or other right-of-way for the collection of wastewaters frorn users'
building sewers.
• "Public Service Commission" refers to the elected body of Public Service
Commissioners and their staff of the State of Montana.
• "Public Water Main" means the main directly controlled by the City and laid in the
street or other right-of-way for the distribution of water to customers' water
service lines.
• "Rate Schedule" means a resolution approved by the City Council which sets forth
the charges and conditions for a particular class or type of utilityservice.
• "Readily Accessible" means safely and easily reached and not being under "lock
and key", "fenced in", "covered up", or otherwise obstructed.
• "Residential street" is a street which provides main ingress and egress to a
subdivision or neighborhood. Traffic flows of 400 vehicles per day to 4500 vehicles
per day.
• " Right -of -Way" means public property dedicated for streets, alleys, or other public
uses.
• "Roadway" means that portion of the street improved, designed, and customarily
used for vehicular travel, exclusive of the berm or shoulder.
• "Sanitary Sewer" means a sewer that carries wastewater or sewage.
• "Sanitary Sewer Service Line" or 'Wastewater Service Line" means that portion of
the privately -owned building sewer extending from the property served to the
public sanitary sewer.
• "Secondary Wastewater Meter" or "Secondary Meter" means a meter which is
furnished, installed, and maintained by a user, and which is used to determine the
amount of wastewater contributed by such user to the municipal wastewater
system.
• "Septage" means the mixed liquid and solid contents pumped from septic tanks
used for receiving primarily segregated domestic wastes or wastes from sanitary
conveniences
• "Septage Disposal Permit" means a written receiving ticket issued by the City of
Laurel permitting the discharge of septage into the City of Laurel's approved
location in accordance with the provisions of these rules and regulations.
• "Septage Hauler" means a person having a valid City of Laurel business license,
when appropriate, and, in addition, licensed by state and local government
agencies to operate a business for the purpose of cleaning septic tanl<s and
transporting septage to an approved septage disposal facility.
• "Sewer" means a pipe or conduit for carrying wastewater or drainage.
• "Shall" is mandatory; "May" is permissive.
• "Sidewalk" means that portion of a street between curb lines or the outer lateral
lines of a roadway, and the adjacent property lines, intended for use of pedestrians.
• "Source" means any building, structure, facility, or installation from which there
may be a discharge of pollutants.
• "Sprinkling Meter" means a municipal water meter that is installed on a water
service line for the purpose of measuring the water delivered by the utility to a
customer exclusively for lawn and garden irrigation.
• "State" means the State of Montana.
• "Storm Sewer" or "Storm Drain" means a sewer which carries storm and surface
waters and drainage but excludes wastewater and polluted industrial wastes.
• "Street" means the entire width between the boundary lines of the right-of-way
publicly maintained when any part thereof is open to the use of the public for
purposes of vehicular travel.
• "Subdivision Extension" means an extension of the wastewater system or provide
water or wastewater service to serve a subdivision, Certificate of Survey,
commercial or industrial development, or any other similar type annexed parcel of
land wherein the extended water or wastewater system facilities within the
development are to be owned by the City, not including any privately -owned
facilities.
• "Sub Meter" means a meter or meters which are furnished, installed, and
maintained by a customer, and which are installed downstream of the municipal
water meter by the customer for the purpose of proportioning municipal utility
charges between various tenants.
• "Suspended Solids" means solids that either float on the surface or are in
suspension in water, wastewater, or other liquids, and which are removable by
laboratory filtering.
• "System Development Fees" means one-time charge paid by new development as
a proportionate share of the "general benefit" to finance the construction of public
facilities needed to serve the development.
• "Tampering" means damaging, altering, adjusting, or in any manner interfering
with or obstructing the operation or function of any metering device that is used
for measuring or registering municipal utility service.
• "User" or "Customer" rneans any person receiving municipal water wastewater
service either directly or indirectly from the municipal water supply system or
municipal wastewater system.
• 'Waste Disposal Site" means the City of Laurel's designated waste disposal station
for the purposes of disposing of septage.
• 'Wastewater" or "Sewage" means the liquid and water carrying industrial or
domestic wastes from dwellings, commercial buildings, industrial facilities, and
institutions, together with any ground water, surface water, and storm water that
may be present, whether treated or untreated, which is discharged into
or permitted to enter the municipal wastewater system.
• 'Wastewater Meter" means a meter which is furnished, installed, and maintained
by a user, and which is used to measure the amount of wastewater contributed by
such user to the municipal wastewater system.
• 'Wastewater Service" or "Municipal Wastewater Service" means the act of either
directly or indirectly discharging wastewater into the municipal wastewater system
from users' building sewers for the purpose of collecting, transporting, treating,
and disposing of users' wastewater.
• 'Wastewater Service Area" means that particular territory which has been officially
adopted by the City Council as the area it intends to provide with municipal
wastewater service.
• 'Wastewater System" or "Municipal Wastewater System" means any wastewater
facilities, including interceptor sewers, outfall sewers, wastewater collection
systems, and wastewater treatment facilities, controlled by the City of Laurel.
• 'Water Service" or "Municipal Water Service" means the supply of water directly
or indirectly from the municipal water supply system, or the availability of water
supplied either directly or indirectly from the municipal water supply system, at
the point of delivery and also the water so delivered or used.
• 'Water Service Area" means that particular territory which has been officially
adopted by the City Council as the area it intends to serve with municipal water
service.
• 'Water Service Line" means all privately owned facilities, including service saddle,
service pipe, corporation stop, curb stop, curb. box, municipal water meter box or
vault, backflow prevention device, expansion tanks, pressure reducing valve, inside
piping, appliances, and other apparatus on the customer's side of the point of
delivery, except the municipal water meter and any other equipment owned by the
City of Laurel.
• 'Water Supply System" or "Municipal Water Supply System" means any devices,
facilities, structures, equipment, land or works controlled by the City for the
purpose of the processing, treatment, transmission, storage, distribution,
pumping, and measurement of water supplied to customers.
MEETING REGIONAL NEEDS
The following abbreviations shall have the designated meanings:
0 "APWA" means the American Public Works Association.
• "ASTM" means the American Society for Testing and Materials.
• "AWWA" means the American Water Works Association.
• "DEQ" means Montana Department of Environmental Quality.
• "EPA" means the Environmental Protection Agency.
• "MCA" means Montana Code Annotated.
• "MPWSS" means Montana Public Works Standard Specifications
• "PUD" is the Laurel Public Utilities Department.
• "PWD" is the Laurel Public Works Director
-
ME
- -
e
Part 2 - General Engineering Submittal Requirements
The following items, if they apply, will be required before the checking of plans can be completed.
As many items as possible should be submitted with the initial submittal. Items not included in
the initial submittal may add additional rechecks to the checking procedure. A complete list of
requirements will be returned with the first check.
1. COMPLETE CCT nNSSUBMITTAL PACKAGE
1.1 Plans
A complete set of plans shall be drawn to include the following:
1.1.1 Title Sheets
The title sheet shall be sheet 1 of each set of plans and will include the
following items:
A. Suitable title that is descriptive of the project.
B. Legal description or address of the area to be worked.
C. Name and Contact information (address & phone #) of the persons
responsible for the work.
D. Name and Contact information (address & phone #) of the persons
designing the work.
E. Location and/or Vicinity Map w/north arrow at a scale that encompasses
the entire project area and shows physical location.
F. Involved Entities and their contact information
G. Engineer's signature, seal, & date
H. Index of Included Sheets with sheet number and title
1.1.2 Notes & Detail Sheets
A. General notes and details that provide enough information for the
complete construction of improvements
B. Basis of bearing and Elevation Datum
C. Legend
D. Abbreviations (if used)
1.1.3 Utility Improvement Sheets
A. Adjacent streets, property lines, utility easements, and references thereto.
B. Location, material, and size of Water, Sanitary Sewer, Storm Sewer and
associated appurtenances.
C. Location of water courses, wells, streams and railroad crossings, water
mains, gas mains, culverts and underground power, CATV or other utility
wherever possible.
D. Limits of hard surface improvements w-4koek with dimension references.
E. Location and size of property to be used for the fellewing
4ems development with respect to known references such as roads,
streams, sections lines, or streets.
F. Topography of existing and proposed contours at intervals not greater than
two (2) feet.
G. Profile views to show highest and lowest elevations of existing and
proposed grades and installed below ground utilities.
H. Size, length, and materials of proposed construction.
I. Suitable title plate with scale, north arrow, date, drawings number, and
name, address and telephone of engineer.
1.1.4 Site Improvements Sheets
A. Street Section Typical
B. Show type of pavement, curb, and sidewalk for each street (by name)
in the project. Partial street improvements (using asphalt concrete
paving) that do not terminate with a curb shall have an extra 1 foot of
asphalt concrete paving width at the edge of right-of-way.
C. Dimensions Shown. Right-of-way, centerline to curb, curb to property
line sidewalk, and sidewalk to property line.
D. Stationing
E. Scale. One (1) inch equals 50 feet (1"=50') horizontal and 1 inch equals
5 feet vertical (1"=5') is the recommended scale to be used for the plan
and profile.
F. Original Drawings. All sheets must be drawn in black India ink on 2411 -
inch by -36617 -inch (24436"` size FnY1aF5.11"x17").
G. Existing and New Improvements and Easements. Existing and new
improvements and easements shall show width. Existing easements
should also show the document number and the receipt date.
1.1.S Landscape and Irrigation Sheets (optional)
1.1.6 Additional Items
A. Street Names
B. Subdivision Boundary
C. Lot Lines and Numbers
D. Pavement Shaded
E. Concrete Symbol on Sidewalk, etc.
F. Size, Material and Length of Each Run of Pipe
G. Centerline, Curb, Storm Drain, Sewer, and Water Data
H. All roads and improvements that are not public are to be labeled
"Private"
2. RIGHT-OF-WAY AND EASEMENT PLATS AND LEGAL DESCRIPTIONS, IF NEEDED
3. SOILS AND GEOTECHNICAL REPORT
See Part 8, Appendix C for Geotechnical Report requirements.
4. STORMWATER ANALYSIS AND DESIGN REPORT
See Part 8 for stormwater report guidelines and requirements.
Part 3 — Construction Changes Revisions
Part 4 — As -Built Plans (Reserved)
Part 5 - Street Design Technical Standards
1. GENERAL CONDITIONS
1.1 All maintenance and repairs of public streets, alleys, sidewalks and other public ways
shall be under the supervision of the PWD.
1.2 It is unlawful to construct or lay any pavement on any public street, sidewalk, alley or
other public way, or to repair the same, without having first secured a permit therefor.
Applications for such permits shall be made to the City Clerk -Treasurer, and approved
by the PWD, and shall state the location of the intended pavement or repairs, the
extent thereof, and the person or firm who is to complete the construction.
1.3 The arrangement, type, extent, width, grade, and location of all new streets must be
considered in their relation to existing and planned streets, to topographical
conditions and to public convenience and safety, and in their relation to the proposed
uses of the land to be served by them.
1.4 All roads must meet the appropriate regulations within Title 12.04.030 "Streets" of
the City of Laurel Municipal Code. meet the design specificatiens in Table''. 'r -Man
1.5 Proposed roads which will intersect State and/or County roads ,hall be permitted by
entities having jurisdiction of said roads. shall be kept to a minimum. State and
,-,- uRt permits and /.,. auth.-,Fizatien must be ebtained TuFn lanes may ham,
required and must be built to the Appiceach Standai:ds f8F Montana Highways.
1.6 Residential dFiveways must net have diFeet access to primaFy highways. wheFe
ne 'n-a-aTe eptien is available,
may issue a l appFE)aeh n Fnit. P,11�),jed to Section q
131.6 All roadway improvements including pavement, curbs, gutters, sidewalks, and
drainage must be constructed in accordance with the specifications and standards
prescribed in the latest edition of the Standards for Public Works Improvements for
the City of Laurel.
,
131.6 All roadway improvements including pavement, curbs, gutters, sidewalks, and
drainage must be constructed in accordance with the specifications and standards
prescribed in the latest edition of the Standards for Public Works Improvements for
the City of Laurel.
1.81.7 Plans, specifications, and special provisions for street fir} construction projects
must be wed sealed by a Registered Professional Engineer licensed in the State
of Montana and submitted with the permit application.
1.3 All street improvements shall be inspected during the course of construction by an
inspector appointed by the PWD.
4.43 Where aceess fFern a public read to the subdivisien will GFeSS PFOperties ne't
owned by the subdivider, the subdivideF must ebtain prepeF easements, at least
60 feet wide, feeeae—preperty ewiT"c-r--v"T the Opriate crttltiinistrrcat"foi= e
public lands. Eaeh easement must allew cenStRActien and perpewal Maintenanee
f a ad a s the .•, eFt., and allowyehire laF t.-- vel en the FE)ael.
Repeat of Tab!? 16.15.0.1 of the Subdivision Code
Local Street
v"YTt
eFganiE matter, soft
.-I-,,,eF etheF substandard
rtht distaRee NO 4
h. Minim -lm v-64t,4G.
rnateFials
M@)HFAYFR .A-
by the geveFning beclLy-.
a. desiff speed 25,.,ph
b. 2-3
;. FAiRiRII-IMI c441 249 4
Si37-5
U7 ft
net teSl,aee-GFE)W
R, c-ulverts,—eUFbs
and gutters,
ainas T
4.43 Where aceess fFern a public read to the subdivisien will GFeSS PFOperties ne't
owned by the subdivider, the subdivideF must ebtain prepeF easements, at least
60 feet wide, feeeae—preperty ewiT"c-r--v"T the Opriate crttltiinistrrcat"foi= e
public lands. Eaeh easement must allew cenStRActien and perpewal Maintenanee
f a ad a s the .•, eFt., and allowyehire laF t.-- vel en the FE)ael.
Repeat of Tab!? 16.15.0.1 of the Subdivision Code
Local Street
a. In gr Ido Sae
li.
PAI de saci Fninimum outside Fight ..f way Fadi CAH
FII. 1 de side Feed . Fad n�F+
v"YTt
GFadeS
rtht distaRee NO 4
h. Minim -lm v-64t,4G.
M@)HFAYFR .A-
d1 MiAIFRUM FAdP F... 20 feet 1104
�. Gupyar'tuFf e
a. desiff speed 25,.,ph
b. 2-3
;. FAiRiRII-IMI c441 249 4
Si37-5
U7 ft
a. In gr Ido Sae
li.
PAI de saci Fninimum outside Fight ..f way Fadi CAH
FII. 1 de side Feed . Fad n�F+
Adequate + granted
The leeatie.. f read plat or en
The ivcaZ�o�i vi a��y-i Baa edSem2rlt must be Sil Bb'Vn @li�i�e plat
supplemeRtal Fnap. The existence ef easements must be noted on the false 9
final plat and any deeds E)F otheF instFurnents cenveying lets withiR the subdi isi.
Where parking will be permitted, add eight feet on each side. If guardrail installation is required or a shoulder is desired, add two feet to each side of
roadway.
, Grades over 10% must not exceed 100 feet in length.
° Curvature is based on a superelevation of 0.08/ft.
2. DESIGN CRITERIA FOR STREETS
2.1-1 Minimum centerline radius of horizontal curvature shall be based on the latest edition
of the AASHTO Geometric Design of Highways and Street for the following design
speeds. The road classification will be as determined by the City Public Works
Director.
able 5.1- "Roadway design speeds (mph)
Arterial Colle Loc-'
50 L 4C =,
"or as approved by the PWD
2.2 Intersections
2.1.1 Intersection design should follow the latest edition of "A Policy on Geometric
Design of Highways and Streets" as modified by the following.
2.1.2 2.2.5 Maximum grade of approach to an intersection must not exceed 5% rcr
from the edge of traveled way.
2.3 Where a sight -distance problem may be anticipated, additional easements or Right of
Way may be required by the PWD.
2.3 Where the angle ef inteFseetieR is aeute, erwheFe a sight distance PFE)blem may
be anticipated, an inEFeased n er+„ line Fa di s „ her red by the PWD
2.4 The angle between centedines ef inteFseeting streets shall be as neady right angles
a5�r63s+bfe,- but case -rless than 90 degrees OF gFetITEETcrrarrroo degrees, cicccpr
as e.d by the PVJ4)
C All streets entering upen any given street shall have +her center lines
.d'reEtly o site each other e r-,+e.d by preferably 300 feet, 200 feet
T
3 Grading
3.1 All grading or excavating in public right-of-way and encroachments shall be first
authorized by a valid encroachment permit.
3.2 Additional grading beyond the right-of-way may be required to provide for safe sight -
distance and to control drainage.
3.3 Easements shall be provided for all property where grading will be required outside
of the right-of-way.
4. PAVEMENT, STRUCTURAL SECTIONS
All streets shall be surfaced in accordance with the following specifications:
4.1 All design shall conform to the latest edition and revisions of the MPWSS.
4.2 Road surfacing shall be Type B asphaltic concrete with a PG 64-28 binder.
4.3 Structural section shall be determined using a Geotechnical analysis and design report
prepared by a Professional Engineer licensed in the State of Montana.
4.4 Existing street patches or restoration shall include asphalt and a crushed base course
per table 5.2
Table 5.2 — Asohalt Thickness for Road Restoration
gad Classification
Asphalt Thickness
Crushed Base Course
-,rterials
Min 4" or Match Existing
Min 14" or Match Existing
:ollectors
Min 4" or Match Existin-
Min 10" or Match Existing
-1 Commercial
10"
:r: l Residential
10"
4.5 Street cross slopes to be designed with a minimum of 2%, maximum of 5% and a
preferred cross slope of 3%.
4.6 Alley surfacing shall be of 4 inches of %-inch minus crushed base course, and 4
inches of 3 -inch minus crushed sub -base course.
5. UTILITY PLACEMENT WITHIN STREETS
Water and sewer utilities to be constructed in streets shall be installed according to Part 6
and Part 7.
6. SITE TRIANGLE
6.1 At Alley intersections a clear vision triangle shall measure ten (10) feet parallel to the
alley and twenty (20) feet parallel to the street as measured from the property line
corner.
6.2 At uncontrolled intersections, a clear vision triangle shall measure seventy-six (76)
feet in both directions as measured from the intersection of the centerlines in the
adjoining street intersection.
6.3 At controlled intersections (stop sign or traffic signal) a clear vision triangle shall
measure twenty (20) feet in both directions as measured from the property line
corner. Exceptions include the existing downtown business district. See zoning code
for Central Business District (CBD).
6.4 Any fence, wall, signs, plant material or other material shall provide an unobstructed
cross -visibility at a level between 3 feet and 8 feet above the street surface elevation.
Trees having over eight (8) feet of clear trunk as measured from the surface elevation
with limbs and foliage trimmed in such a manner as not to extend into the cross -
visibility area and complying with section 7.2.3 of Division 2 of the Rules and
Regulations Governing Utility Services and Streets of the City of Laurel, Montana, are
permitted in the clear vision triangle.
6.5 Vehicles shall not be parked in the public right-of-way to obstruct the line of site
created by the clear vision triangle. In the Central Business District where line of site
is restricted by zero building setback, vehicles shall not be parked in the public right-
of-way that obstruct site distance or as per Montana Department of Transportation
standards where applicable.
7. ALLEYS
7.1 Alleys
Alleys shall be designed and improved by the developer.
7.1.1 Right of way shall be a minimum of 20 feet in width.
7.1.2 There shall be no intersecting alleys.
7.1.3 Road surface shall be 15 feet wide, except at intersections with streets
where standard returns shall be constructed.
8. CURB AND GUTTER, SIDEWALKS
8.1 Sidewalks shall be constructed of 4" Portland Cement Concrete over 3" of 3/"
crushed base course.
8.2 Sidewalks shall typically be constructed parallel to the curb line. Other sidewalks
shall be constructed only if authorized by the PWD.
8.3 Curb, gutter and sidewalks shall be constructed at the total cost of developers or
property owners.
8.4 Sidewalks shall be ADA compliant.
8.5 Warning Plates are to be Cast Iron Truncated Domes.
9. DRIVEWAYS
9.1 Residential Driveway
9.1.1 Driveways serving property used solely as a single family, two-family, or three-
family residence shall be residential type driveways with approaches
conforming to the latest edition of the MPWSS Standard Drawings.
9.1.2 Driveways widths shall be 12 -foot minimum/04 faet;T 30 -foot
n measured at the base of the driveway.
9.2 Commercial Driveway
9.2.1 All driveways other than residential driveways shall be commercial driveways
with approaches conforming to the latest edition of the MPWSS Standard
Drawings.
9.2.2 Commercial driveway widths shall be 12 -foot minimum/25 f^^+ m.-axiFA Fn 50 -
foot maximum, measured at the base of the driveway.
9.3 Driveway Separation/Distance from the Property Line
9.3.1 For residential driveways, except for approved joint -use driveways and
driveways of lots having 25 -feet of frontage or less, shall be located at least 5
feet from the side property line. Exceptions are allowed for cul-de-sacs.
Multiple driveways for a single lot may be approved on a case-by-case basis.
9.3.2 All commercial driveways shall be approved by the PWD.
9.4 Location
9.4.1 Driveways shall be so located to minimize interference with the free
movement of normal traffic or the proper functioning of highway signs,
signals, lighting, fire hydrants or other devices that affect traffic operation.
9.4.2 All commercial driveways shall be designed such that vehicles entering, or
egressing shall not be required to back frorn or into a street right-of-way.
9.4.3 Any necessary adjustments to utility facilities, light standards, fire hydrants,
catch basins, street signs, signals, underground conduits for street lighting or
fire alarm systems, or other public improvements or installations shall be
accomplished without cost to the City.
9.5 Frontages
Frontages of -59 sixty (60) feet or less shall be limited to one (1) driveway. Not more
than two (2) driveways shall be provided to any single property tract or business
establishment, except where the property frontage exceeds six hundred (600) feet,
there may be one (1) additional driveway for each additional three hundred (300) feet
of frontage. In cases where lots have more than one street frontage, each frontage
shall be treated separately when determining the allowed number of driveways.
9.6 Right -of -Way Distances
Gasoline pump islands or other installations with parking parallel to the right-of-way
line shall be at least 10 feet outside of the right-of-way line. Buildings or other
installations with an angle of ninety degrees parking between it and the right-of-way
line shall be at least 30 feet outside the right-of-way line.
9.7 Culverts
Driveway culverts shall only be allowed by approval of the PWD. If permitted,
culverts shall be maintained by the property owner.
Culverts used for the crossing of irrigation ditches shall be approved by the
associated ditch company.
10. STREET NAME SIGNS
10.1 Street name signs shall be installed in accordance with the Manual of Uniform Traffic
Control Devices and at all new intersections.
11. SURVEY MONUMENTS
Boundary, lot corner and street survey monuments shall be installed or preserved as with
all street improvements as follows:
• During construction or development of any street other than in a new subdivision,
Contractor shall reset or preserve all existing monuments affected by the street
improvements.
12. REPAIRING UTILITY CUTS
12.1 When requested by the PWD, construction equipment and procedures to be used
shall be described in the permit application.
12.2 Pipe installation shall be done according to the requirements of the appropriate
agency specifications in use. Any required granular backfill material shall meet the
material requirements for Select Granular Fill in the MPWSS, latest edition.
12.3 Pavement shall be saw cut in a neat line at termination points of pavement
replacement.
12.4 Pavement and shoulder removal shall be done in a manner that provides for proper
restoration of the replacement section.
12.5 Straight vertical cuts of the pavement are required. Pavement surfaces that become
undermined shall be cut back and removed.
12.6 Excavations shall be filled at the end of each workday unless approved otherwise by
the PWD. Any excavations that are allowed to remain open must be properly signed
and barricaded. The longest length of trench to remain open overnight shall not
exceed 50 lineal feet.
12.7 Construction which adversely affects the subsurface drainage of the pavement
structure shall be corrected by the addition of surface or subsurface drain.
12.8 Pavement replacement limits shall extend a minimum of 24 -inches, in all directions,
beyond the limits of disturbed soil and far enough such that all existing pavement to
remain, is supported firmly by the existing underlying base material. The new
pavement patch shall be restored to the proper grade, cross -slope, and smoothness.
All joints shall be tacked.
12.9 The City PWD requires inspection and testing of utility repairs and surface restoration.
12.10 All street cuts shall be parallel and perpendicular to the street centerline. No diagonal
cuts shall be accepted.
12.11 If remaining asphalt width between asphalt cui and asphalt edge is less than or equal
two (2) feet, it shall be removed and replaced.
12.12 Asphalt removed shall be replaced at the thicknesses designated in Table 5.2 or match
existing, whichever is the greater.
12.13 Non -shrink backfill may be required by the PWD.
13. STREET LIGHTING
Streetlights shall be installed and shall comply with Montana Department of Transportation
standards.
PART 6 - SEWER DESIGN TECHNICAL STANDARDS
;�9 0
The purpose of this design criteria is to provide engineers, designers, engineering technicians,
and others, in handy reference form, the City's minimum standards for sanitary sewer design.
These criteria are intended to cover the design of main line sanitary sewers and apply to any
sewer systems, public or private, 6 inches in diameter or greater. Private on-site sewer
systems serving mobile home parks, condominiums or apartments may be designed in
accordance with the uniform plumbing code and approved by the appropriate building
inspector.
The design criteria set forth below are intended to result in sewers which will:
1.1 Be
pp consistent with the Sewer Master Plan, , i.� if ax jci rh,,,_ Re, -Hon
1.2 Be consistent with Montana Department of Environmental Quality (DEQ) D:�Q
1.3 Be consistent with the latest edition of the �,d a
1.4 Be of adequate size to carry the expected flow, within their design life, and at sufficient
depth to serve adjacent properties.
1.5 Have sufficient grade to maintain a minimum velocity of 2 feet per second when
flowing half full.
1.6 Be strong enough to resist all external loads which may be imposed.
1.7 Be of materials resistant to both corrosion and erosion.
1.8 Be economical and safe to build and to maintain.
1.9 Prevent infiltration or inflow of ground and surface waters.
1.10 Be designed for municipal wastewater only, not , °.r roofs, streets, or ground
waters.
Alternate materials and methods will be considered for approval on the basis of these
objectives.
2. REFERENCES
2.1 "We enrverk-r Standards." Circular WGA B 2 M DEQ -2, Design Standards for Public Sewage
Systems, Montana Department of Environmental Quality, Design Standards feF
WastewateF Faeilities, latest edition.
2.2 Montana Public Works Standards Specifications, latest edition and revisions.
3. APPROVAL OF ALTERNATE MATERIALS OR METHODS
Approval of any major deviation from these standards will be in written form.
4. MONTANA WATER DEPARTMENT OF ENVIRONMENTAL QUALITY BUREAU -STANDARDS
W-QE3 2, published State of Montana; Department of Environmental Quality (DEQ),
isCirculars are hereby incorporated into this document. WQR's to-ia will be used as a
ideline to determine _-, dcc_::nenL %i,ii[ii she more stringent standards needed feriterns not
speeifieally eeveFed in this deEarnen* shall govern.
5. SPECIAL PROBLEMS
The design of the following are considered special problems and are not covered in detail in
these standards: WQB 2 pFeVides geneFal guidelines feF ^9^ + f these items.These items will
be reviewed and approved on an individual basis. The following is a brief list of items but
shall not be considered all encompassing.
5.1 Pump efof Lift Stations
5.2 Force Main
5.3 Inverted Syphons
5.4 Relining of Existing Sewers
5.5 Internal Sealing of Existing Sewers
5.6 Treatment Plants
5.7 Outfall Sewers
5.8 Energy Dissipaters
5.9 Regulating Devices
5.10 Flow Measurement Devices
6. DESIGN PLANS AND PROFILES
Plans will be required for all new or extended sanitary sewers and shall include both a vicinity
map and a general layout map of the area showing the location of existing facilities and of
the proposed improvements. Plans should be accurate, legible and properly detailed.
Dimensions should be either from right-of-way centerline or property lines.
The City of Laurel utilizes the NAD _1983_StatePlane_ Montana_FIPS_2500 coordinate system
and the Lambert Conformal Conic Projection for all mapping purposes.
6.1 Engineering Drawings (Plans)
Plans for sewer lines should contain at least the following information:
6.1.1 Adjacent streets, property lines, utility easements, and references thereto.
6.1.2 Location of sewer lire`s and appurtenances. Each manhole shall be numbered
and stationed to facilitate checking the plans with the profiles.
6.1.3 Location of water courses, wells, stream and railroad crossings, water mains,
gas mains, culverts and underground power, CATV, or other utilities wherever
possible.
6.1.4 Limits of hard surface paving with dimension references.
6.1.5 Adequate details, specifications, and other information for Contractor to be
able to install the proposed improvements.
6.1.6 Suitable title plate with .mail, and addFess of ewnef, scale, north point, date,
drawing number, and name, address and telephone of engineer, and the
Registered Professional Engineer's (RPE) signature.
6.1.7 Profiles
6.2 Profiles for the individual sewer lines should contain at least the following
information:
6.2.1 Location of manholes and other appurtenances with each manhole numbered
and stationed.
6.2.2 Profile of existing and proposed ground surface and sewer invert.
6.2.3 Size, material, pipe class, slope, and length of sewer, and pipe bedding Glass
between consecutive manholes.
6.2.4 Depth of bury and surface restoration.
6.2.5 Elevation of original ground and finished grade shall be shown graphically, and
sewer inverts specified at each manhole.
6.2.6 Depth and location of major utilities and pipelines that cross the plan view of
the sewer line. Utility service lines shall be shown if requested by the PWD.
6.2.7 Suitable title plate with the name and addFess of ,.wn . scale, date, drawing
number, and the tee, Registered Professional Engineer's (RPE Rumber Rd
expiFatien date efthe . tFatien) signature.
6.2.8 Limits of street improvements will be shown including a typical section of the
subject street.
6.2 Separate DFawings
6.2.9 Separate plans shall be submitted for public sewers installed in combination
with private sewers or site plumbing. "Site plumbing" drawings are not
acceptable. Public sanitary sewer plans may be combined with other public
improvement plans, provided that the plans must be legible and properly
detailed.
6.2.10 Appropriate labeling of the services as "Public" or "Private" will be done on
both the plan view and profile view.
7. SPECIFICATIONS
7.1 Engineering consultants are encouraged to develop specifications and special
provisions for each project. Specifications and special provisions shall incorporate the
latest edition of the MPWSS. Special specifications pertaining to materials and
workmanship, if developed, shall be submitted to the City for review and approval,
together with check prints of the project.
7.2 In general, the sewer specifications should cover pipe material, excavation, laying of
sewer pipe, jointing, backfilling, testing, etc. Strict supervision will be required by the
City during construction to assure compliance with the specifications,Developer small
provide lull time engineering inspection services during Construction activities. The
City reserves the right to review or audit the inspection services being provided.
8. ADDITIONAL ITEMS OF CONCERN
8.1 Testing
8.1.1 Sanitary sewers will be required to pass tests specified in MPWSS, Section
02:722 02730, Sanitary Sewer Mains Collection Systems.
8.1.2 The internal (T.V.) inspection shall be performed prior to issuance of the final
acceptance. The a,,.,,,l,,.,,,F will .,.,i4erm a T.V. of e.... pleted . eets A Fn*RffiFnuFn of
five (5) , ,,.I(iRg a.,.,S netiee iFequ;Fed to sehed le the i eetien. T.V. inspection
will not be performed until the Qty! -5f y's inspector has completed a:_final
inspection and is satisfied that all construction is complete. The T.V. inspection
tapes video shall be become the property of the City.
8.1.3 Results of all testing shall be reported to the City on a bi-weekly basis.
9. GENERAL DESIGN CONSIDERATIONS
9.1 Sanitary sewers should be designed to remove the domestic sewage from houses,
business buildings and other public and private establishments, but not the street,
roof, or subsurface drainage. Each main building on a parcel or residence shall be
served by a separate sewer lateral.
9.2 Storm water, including street, roof, or footing drainage, shall be removed by a system
of storm sewers or by some other method separate from the sanitary sewer system.
5.3 All materials
dFaka+eg-s
5.4 All gravity
and nstallatk)R ef sanit@Fy seweFS shall be in GE)RfGrmanee with the latest
flow sewers, up te 10 iRehes, shall be desigRed te allew fGF peal(flewsat
for ., al(
flews at a/ of the e eaty of the pipe.
9.3 In general, sewer systems should be designed to care for future flows which may
reasonably be expected within a period of a:5 to 20 years, and for ultimate
development of the specific drainage basin concerned.
10. CAPACITY
Public sanitary sewers and appurtenances 10 inches and smaller shall be designed to
accommodate peak hourly flows when flowing one half full. Public sanitary sewers and
appurtenances 12 inches and larger shall be designed to accommodate peak hourly flows,
when flowing three quarters full.
11. Design flows shall be determined by consideration of the following factors:
11.1 Drainage Basin Area to Be Served
11.2 Population Within the Area to Be Served
11.3 Land Use Within the Area to Be Served
11.4 Per Capita Sewage Flow
11.5 Commercial, Industrial, or Institutional Users to Be Served
11.6 Infiltration Allowance
11.7 Peaking Factors
In the absence of flow data or other reliable information, the design faeteF- fre.... T- "lo -3 .4ay
be assumed. ppreat- Designer shall use peaking ..,+:,,s hAi:'Fl be plied to determine flews
w#e-Fefactors in conformance with factors outlined in DEQ Circular -2 or others specified by
the City.
it i reee.m.ffle.mded— that design ;i, calculations : ; i include estimates of average
maximum and Fnini um daily flows. The submission of design calculations will net
required -lam; engineers should be prepared to substantiate pipe sizes, layout, population
estimates, land uses or other design assumptions as may be requested.
12. SIZE
Main line sewers shall be a minimum of 8 -inch inside diameter, except that the lateFal sewer
service within private property which will not be extended may be of 4 -inch inside diameter
for residentiai ser,✓ices and 6 -inch for commercial properties.
13. PIPE MATERIALS
13.1 Gravity Sewers
The following pipe materials and fittings are approved.
SPECIFICATIONS
Concrete Pipe, Reinforced ^ G*"e Iran Pope; Glass 92 ASTM C 76, Class 1-14 III, IV, or V
Ductile Iron Pipe: Class 2
Polyvinyl chloride (PVC); 4" to 15"
PVC Sewer Pipe; 18" and larger
13.2 Force Mains
ANSI A21.51 or AWWA C151
ASTM 91 3034, SDR 35; or ASTM F 789
ASTM F 679_ ASTM F 794, Series 46
The following materials are approved for force mains:
MATERIAL
Ductile Iron Pipe; Class 52
Polyvinyl chloride (PVC)
13.3 Other Uses
SPECIFICATIONS
ANSI A21.51 or AWWA C151
AW WAC900
Pipe materials for special uses such as for liner pipe, temporary construction, stream
crossing, bridge crossings, etc., will be considered special design cases and are not
covered further in these standards.
14. EXCAVATION, PIPE BEDDING AND BACKFILL
14.1 Details - Standard 5
14.2 Installation
are the latest edition of the MPWSS.
Installation of pipe shall conform to the following:
14.2.1 MPWSS, latest edition.
14.2.2 Contractor Quality Control and Owner Quality Assurance
Table 6.1 below outlines the minimum frequency of quality assurance testing. This testing may
be reduced at the discretion of the City. This testing does not replace an appropriate Contractor
quality control testing program as described earlier in this section. In the case of a conflict
between QC and QA testing, the QA testing shall govern.
Table 6.1 - Laurel Materials Testing Requirements
EARTHWORKS
Test Specification/Material
Test Method
Minimum Required Frequency
Trench Backfill
Moisture -Density (MPWSS
1 Sub/soil type encountered
02221)
1 Submittal/borrow source
Trench Compaction
In -Place Density (MPWSS
1 test/lift/200 LF
02221/1.4) 97% Minimum
Trench Compaction (laterals
In -Place Density (MPWSS
1 test/for each 2 ft of vertical depth/2 ft from
outside the road template,
02221/1.4) 97% Minimum
edge of structure, valve, hydrant, or manhole
structures, valves, hydrants
and manholes)
Pipe Bedding
Type I Bedding gradation &
1 Submittal
Plasticity Index / Type II Bedding
Gradation (MPWSS 02221)
Subgrade and Embankment
Moisture -Density (MPWSS
1 Submittal per soil type encoun-,
02230)
Submittal per borrow source
Compaction of subgrade
In -Place Density (MPWSS
1 test/lift/200 LF (C &G) or 1 test/lift/1000 Si
under curbs, gutters, and
02230/1.3) 95% Minimum
(flatwork)
sidewalks
Compaction of subgrade and
In -Place Density (MPWSS
1 test/lift/4000 SF
embankment for roadways
02230/1.3) 95% Minimum
Base Course
Gradation - Moisture Density—
1 Submittal
Fractured Faces (Crushed) - LA
Abrasion, LL, PL, and PI (MPWSS
02234)
Compaction of Sub Base
In -Place Density (MPWSS
1 test/lift/4000 SF
Course for roadways
02234/1.3)95% Minimum
Crushed Base Course
Gradation - Moisture Density —
1 Submittal
Fractured Faces (Crushed) - LA
Abrasion, LL, PL, and PI (MPWSS
02235)
Compaction of crushed base
In -Place Density (MPWSS
1 test/lift/200 LF (C &G) or 1 test/lift/1000 SF
course under curbs, gutters,
02235/1.3) 95% Minimum
(flatwork)
and sidewalks
Compaction of crushed base
In -Place Density (MPWSS
1 test/lift/4000 SF
course for roadways
02235/1.3) 95% Minimum
14.3 Water settling of backfill material is prohibited.
15. GRADE
15.1 The Designer shall use minimum grades in conformance with those shown above aFe
des:-able and aFe aFtielady Feeemmended en outlined in DEQ Circular-2 or others
specified by the City uppeF ends of lateFal s.
15.2 Slopes slightly less than those shown abeue described may be considered if substantial
justification can be demonstrated. There must be enough live sewer interceptions to
ensure that the average depth of sewage flow will be 0.3 of the pipe inside diameter.
15.3 Maximum pipe slope shall be governed by terrain and available fall between
manholes. Maximum velocity in the pipes shall not exceed 8 fps, unless specifically
approved by the City.
16. MINIMUM DEPTH
16.1 All sewers shall be laid at a depth sufficient to drain and be protected against damage
from traffic. Sewers laid in areas subject to wheel loads shall have a minimum cover
of 6 feet measured from top of pipe to finished grade or be otherwise protected from
damage by traffic; except that minimum cover may be reduced to 4 feet with specific
approval. Encasement will be required for depths less than 4 feet.
16.2 Under normal conditions, main line sewers in residential areas should be laid at an
average depth of 8 to 9 feet. Services to adjacent properties from such sewers should
normally be laid so that the depth of the service lateral at property line is at least 5
feet. Insulation shall be provided for sewers that eaRRet he plae d at a depth su ffiement
tG ffeveRtfFeeziRg _:re less than 5 -ft deep.
17. LOCATION
17.1 Relation to Water Lines and Wells
No sanitary sewer mains should be less than 10 feet from any well, spring, or other
source of domestic water supply. All sanitary sewers or parts thereof which are
located within 50 feet from any such source of domestic water supply shall be
constructed of cement lined, ductile or PVC with watertight joints. Sanitary sewers
and domestic water lines shall not be laid in the same trench. Parallel water and sewer
lines wherever possible should be located at least 10 feet apart horizontally.
When physical conditions render this spacing impossible or impractical, then ductile
iron water pipe with watertight joints or concrete encasement is required for the
sewer line. Wherever it is necessary for sewer and water lines to cross each other, the
crossing should be at an angle of approximately 90 degrees and the sewer shall either
be located 18 inches or more below the water line or be cement lined, constructed of
ductile or PVC pipe with watertight joints for a distance of 10 feet on both sides of tile
water line.
17.2 Sewers in Streets or Easements
Under normal conditions, sewers should be located in street right-of-way 56 feet
north or east of the street right-of-way centerline. Sewers shall be located in
centerline of alleys and easements, if possible. When it is necessary to locate sewers
in easements, such easement shall be at least 20 feet in width. Sewers 24 inches in
diameter or larger, or over 12 feet in depth, may require wider easements.
18. ALIGNMENT
18.1 Sewer lines shall be laid on straight alignment and uniform grade between
consecutive manholes.
18.2 Horizontal and vertical curves in sewers are not recommended. However, in cases
where justification can be shown, limited use of such designs will be considered.
Where curved alignments are utilized, the City may require the following:
18.2.1 Slope greater than minimum slope for the size of pipe.
18.2.2 Manhole spacing of less than 250 feet.
18.2.3 City may require that the developer or contractor shall provide a licensed
professional land surveyor or engineer to continuously monitor installation of
the curved sewer during construction.
18.2.4 Television inspection of curved sewers is required prior to final acceptance.
19. CHANGE IN PIPE SIZE
19.1 When a smaller sewer joins a large one, the invert of the larger sewer should be
lowered sufficiently to maintain the same energy gradient. An approximate method
for securing these results is to place the 0.8 depth point of both sewers at the same
elevation.
19.2. Sewer extensions should be designed for projected flows even when the
diameter of the receiving sewer is less than the diameter of the proposed
extension. Special consideration should be given to minimizing turbulence when
designing a flow channel within a manhole where there is a change in pipe size.
eweF rr.li,f The appropriate reviewing agency may require a
schedule for construction of future downstream sewer relief.
20. MANHOLES AND CLEANOUTS
20.1 Details - Standard Drawings are found in the MPWSS, latest.edition
20.2 Manhole Construction
20.2.1 Construction shall be watertight. If ground water or surface drainage can be
expected to flood the top of the manhole, watertight frame and covers shall
be used. A 100 -year -recurrence -interval storm shall be used in determining
flooding elevations.
20.2.2 Manholes located in easements outside of public right-of-way shall have
locking frame and covers.
20.2.3 For rigid pipe, there shall be flexible connections provided at the inlets and
outlets of each manhole. For all pipes, the flexible joint shall be within 1-1/2
pipe diameters, not to exceed 12 inches, of the exterior wall of the manhole.
A flexible connection "boot"/or insert may be utilized in lieu of a flexible joint.
20.2.4 Generally, a 04 0.1 foot minimum drop from inlet to outlet is required for
bends between 120 and 240 degrees. A 0.4 0.2 foot minimum drop for all
bends outside those angles. Maximum drop in flow line elevation i
or all inverts shall be 0.= t. However, where grade
considerations are considered critical, the design engineer may request a
waiver from the City if sufficient justification exists.
20.3 Manhole Location
20.3.1 Manholes shall be located as follows:
A. At the end of each public sanitary sewer.
B. Every change in grade or alignment of sewer.
C. Every point of change in size of sewer or pipe material.
D. Each intersection or junction of sewer.
E. Upper end of all lateral sewers.
F. At the beginning and end of all 24 -inch diameter and smaller sewers on
curved alignment.
G. At intervals of 3--1;8 400 feet or less as approved by the City.
H. At each and every street intersection unless approved by City.
Cleanouts shall not be substituted for manholes nor installed at the end of
public sanitary sewers unless approved by the City.
20.4 Cleanout Locations
A. A cleanout shall be installed 5 -ft outside of the building at the connection
point.
B. A cleanout shall be installed on a service line whenever the total degree of
bends is equal to or more than 45° on any single run of sewer pipe.
C. Cleanouts will not be approved as substitutes for manholes.
20.5 Manhole Covers
A. Standard -Cast iron cover as outlined in MPWSS, used in public right-of-
way.
B. Locking, may be required.
C. Inflow Protector Covers are required for all installations within the 100 -
year flood or where directed by the City
Public Works Department.
20.6 Drop Manholes
Drop manholes shall be avoided whenever possible during the design and
construction of wastewater extensions. They shall only be used when it is proven
impractical to steepen the incoming sewer.
A. Outside drop assemblies shall be provided for pipes 12 inches in diameter
and smaller when entering a manhole at a distance of more than 24 inches
above the invert of the manhole. Larger pipe should be introduced into the
manhole at the manhole invert.-'
B. Inside drop assemblies will be considered only in special cases involving
connections to existing manholes. Special approval for all drop assemblies
is required from the City.
20.7 Cleanouts
Cleanouts will not y -be approved as substitutes for manholes, exeept at the
uppeF end of lateral sev.;eFs 4:00 feet eF less in length. T-eFnpeFaFy elean out assemblies
Fnay be installed in rnainliRe-,; IeSS; than 1-50- feet in length, pFevided that the line will be
FeqUiFed eveF el is
20.8 Diameter
The minimum diameter of manholes shall be 48 inches; larger diameters are
preferable for large diameter sewers. A minimum access diameter of 22 24 inches
shall be provided.
20.9 Flow Channel
The flow channel straight through a manhole should be made to conform as closely
as possible in shape and slope to that of the connecting sewers. For pipes greater than
8 inches in diameter, the channel walls should be formed or shaped to the full height
of the crown of the outlet sewer in such a manner to not obstruct maintenance,
inspection or flow in the sewers. For pipes 8 inches or less in diameter, the channel
shall be formed at least to the spring line of the pipe. When curved flow channels are
specified in manholes, including branch inlets, or when entrance or exit losses are
significant, minimum slopes shall be increased to maintain acceptable velocities.'
20.10 Bench
A bench shall be provided on each side of any manhole channel when the pipe
diameter(s) are less than the manhole diameter. The bench should be sloped no less
than % inch per foot (4%). No lateral sewer, service connection, or drop manhole pipe
shall discharge onto the surface of the bench.
20.11 Water Tightness
A. Manholes shall be of the pre -cast concrete or poured -in-place concrete type.
Manholes shall be waterproofed on the exterior. Pre -cast concrete manhole
sections manufactured in accordance with ASTM C 478M-93 are exempt from the
exterior waterproofing requirement.
B. Inlet and outlet pipes shall be joined to the manhole with a gasketed flexible
watertight connection or any watertight connection arrangement that allows
differential settlement of the pipe and manhole wall to take place.
Water -tight manhele
covers are to be used wherever the manhole tops may be
flooded by street runoff or high water. Locked manhole covers may be desirable
in isolated easement locations or where vandalism may be a problem.
20.12 Manhole Adjusting Rings
Adjusting rings installed in manholes on public sanitary sewers shall have a total
height of not less than 2 inches and not more than 6 inches.
20.13 Manhole Frames and Covers
Frames and covers used on manholes for public sewers shall be made of cast iron or
ductile iron, shall have a clear opening no less than 24 inches, shall have a total weight
of not less than 410 pounds, and shall have machined surfaces to ensure a tight fit
between cover and frame.
20.14 Manhole Steps
All manholes used for public sanitary sewers shall be equipped with steps of the
polypropylene -coated steel type meeting applicable OSHA requirements for fixed
ladders. The steps shall withstand a single concentrated load of 400 pounds, have a
minimum width of 12 inches, and shall have ribbed, skid -resistant treads with drop
fronts to prevent side slip. All manhole steps shall be installed with the center of the
rung a minimum of 7 inches from the manhole wall.
21. PIPE JOINTS
All pipe joints must be constructed watertight. Rubber rings or other approved joint sealing
material shall be used. Joint deflections shall be controlled such that the watertight integrity
of the joint is maintained.
22. SERVICE LATERAL (SIDE SEWER OR HOUSE BRANCH) CONNECTIONS
All service laterals with the exception of house branches from a main sewer to serve an
individual building shall be of a minimum size of 6 inches in diameter within public right-of-
way or within public easements. House branches to serve single family residences and multi-
family residences up to a feta E4 ) plex may be 4 -inch diameter in size. Laterals shall be
laid at a minimum slope of 2%. Construction of laterals shall conform to the same standards
as for main sewer construction.
During the construction or extension of a public wastewater system, a wastewater service
line shall be stubbed to the property line of each lot and/or parcel of property included in the
extension application. All wastewater lines so installed shall be subject to and fully comply
with the provisions set forth in this section.
All wastewater service laterals shall be marked with a permanent indicator of location in the
nearest hard surfacing (i.e. "S" stamp in adjacent curb, sidewalk or driveway"
23. HOUSE OR BUILDING SEWERS
As a minimum criterion, construction of the house or building sewers (on site) shall be of the
same quality and meet the same requirements as the public sewer with regard to materials,
water tightness and location. In addition, these sewers shall conform to the state and Ieea
Plumbing G^,l^-s -and .„S+.:,tions. Ullifo r ink Cod., !-:LesL ediiio,�. No roof, surface,
foundation, or other storm water drain lines shall be connected to the public sanitary sewers.
24. SEPARATE CONNECTION REQUIRED
24.1 Each main building or legal lot (except a private garage) shall be separately connected
to a public sewer. Except that main buildings or dwellings located on a single parcel
may be connected to a private sewer discharging into the public sewer, provided that
an approved statement of maintenance responsibility is recorded with the title to the
property and permitted through MT Dept. of Environmental Quality. Examples of such
private systems are: mobile home parks, residential or office condominiums
(unit/owner association by-laws to have statement of maintenance responsibility); or
apartment complexes.
24.2. A manhole shall be required at the point of connection of a private sewer system to a
public system with a clean out placed at the property line. A monitoring or sampling
manhole is required for connections from industrial users.
25. STEEP SLOPE PROTECTION
Sewers on slopes of 20 percent or more may require special anchoring.
26. DRAINAGE DITCH OR STREAM CROSSINGS
26.1 Sewers entering or crossing drainage ditches or streams shall be constructed of
watertight pipe. The pipe and joints shall be tested in place, shall not exhibit
infiltration, and shall be designed, constructed, and protected against anticipated
hydraulic and physical, longitudinal, vertical, and horizontal loads, erosion, and
impact.
26.2 Sewer crossing of drainage ditches must be protected from freezing through either
depth of bury or insulation.
27. AERIAL CROSSINGS
Support shall be provided for all joints in pipes utilized for aerial crossings. The supports shall
be designed to prevent frost heave, overturning, and settlement.4
28. PROTECTION OF WATER SUPPLIES
When wastewater sewers are proposed in the vicinity of any water supply facilities,
requirements of Circular `^ 1 DE, should be used to confirm acceptable isolation
distances in addition to the following requirements.
28.1 Cross Connections Prohibited
There shall be no physical connections between a public or private potable water
supply system and a sewer, or appurtenance thereto which would permit the passage
of any wastewater or polluted water into the potable supply. No water pipe shall pass
through or come in contact with any part of a sewer manhole.
28.2 Relation to Water Works Structures
28.2.1 Sewers shall not be located within 50 feet of a public water supply well.
28.2.2 All existing waterworks units, such as basins, wells, or other treatment units,
within 100 feet of the proposed sewer shall be shown on the engineering
plans.
28.3 Relation to Water Mains
28.3.1 Horizontal Separation.
A. Sewers shall be laid at least 10 feet horizontally from any existing or
proposed water main. The distance shall be measured edge to edge.
B. If the proper horizontal separation as described above cannot be obtained,
the design engineer shall submit a request for a deviation to the DEQalong
with a description of the problem and justifying circumstances. If the
deviation is granted, the sewer shall be designed and constructed with the
following minimum conditions:
D. Sewer pipe shall be PVC with nominal 20 -foot lengths.
E. The sewer shall pass low pressure air testing in accordance with UniBell
Recommended Practice UNI -B-6-90.
F. Sewer services utilizing in-line fittings and extending to at least property
lines shall be provided and tested in the area of the encroachment. Saddles
are not acceptable.
28.4 Crossings
28.4.1 Sewers crossing water mains shall be laid to provide a minimum vertical
distance of 18 inches between the outside of the water main and outside of
the sewer. This shall be the case where the water main is either above or
below the sewer. The crossing shall be arranged so that the sewer joints will
be equidistant and as far as possible from the water main joints. Where a
water main crosses under a sewer, adequate structural support shall be
provided for the sewer to maintain line and grade and to prevent damage to
the water main.
28.4.2 If the proper vertical separation as described above cannot be obtained, the
design engineer shall submit a request for a deviation to the DEQ along with a
description of the problem and justifying circumstances. If the deviation is
granted, the sewer shall be designed and constructed with the following
minimum conditions:
A. Minimum vertical separation at crossings between water and sewer mains
shall be 6 inches.
B. Sewer pipe shall be PVC with normal 20 -foot lengths.
C. At crossings, one standard length of new pipe shall be centered at
approximately a 90 degree angle with respect to the existing pipe.
D. The sewer shall pass low pressure air testing in accordance with UniBell
Recommended Practice UNI -8-6-90.
E. Sewer services utilizing in-line fittings and extending to at least property
lines shall be provided and tested within 10 feet of the crossing. Saddles
are not acceptable.
F. If the minimum separation is not viable, the water line must be relocated.
In these cases, minimum vertical separation at crossings between water
and sewer mains shall be 18 inches.
29. SEWER SERVICES AND PLUMBING
29.1 Plumbing
Sewer services and plumbing should conform to relevant local and state plumbing
codes.
30. DESIGN STANDARDS FOR ALTERNATIVE SEWER SYSTEMS
These standards shall be used for design of alternate sewer systems. Variances may be
allowed where adequate justification is provided by the design engineer. These standards
may be modified as the technology evolves.
30.1 Small Diameter Gravity Sewer Design
30.1.1 Design flow shall be based upon water use records where available. If water
use records are not available, 7-8 10� gpcd per residential connection shall be
used wkh aelditienal flew allawanees {OF'A{°'+"*°eR and an appropriate peaking
factor.
30.1.2 Hydraulic calculations shall use the Manning's formula with a roughness
coefficient of n = 0.013.
30.1.3 Hydraulic design shall be based upon an approximately %tel pipe at 20 -
year peak design flow.
30.1.4 Minimum design velocity of -1-.e fps in controlling sections should be used
considering existing peak flow conditions.
30.1.5 All mains shall be 4 -inch diameter pipe or larger.
30.1.6 To minimize potential sources of infiltration, 20 -foot minimum pipe lengths
and in-line service fittings should be used.
30.1.7 Turbulence should be minimized wherever possible.
30.1.8 Performance tests shall be utilized for determining water -tightness, deflection
and alignment of installed pipes.
30.1.9 Service lines and main lines shall be designed and constructed to prevent
freezing of the wastewater within the lines.
30.2 Manholes/Cleanouts
30.2.1 The limited use of manholes is encouraged to minimize infiltration, reduce
odor potential, limit introduction of extraneous materials and reduce cost.
Manholes are to be located at major junctions of three or more pipes and
limited to strategic locations for cleaning purposes.
30.2.2 Water -tight manhole covers are recommended for odor control and to limit
inflow.
30.2.3 Manholes located in groundwater shall be waterproofed and should be of the
type which has the base riser section cast with integral floor.
30.2.4 Clean outs should be used in place of manholes at changes in grade, alignment,
and at intersections of pipe. Spacing of clean outs shall be dependent upon
cleaning capabilities. A maximum of 600 feet for mechanically cleaned and jet -
cleaned systems and a maximum of 1000 feet for systems cleaned by pigging.
30.2.5. Clean outs located in traffic areas shall be designed to withstand normal traffic
loads without damage.
30.3 Design Standards for Pump Stations for Alternative Collection Systems
The use of wastewater pumping stations to provide wastewater services for said
areas, or portions thereof shall be avoided whenever it can be feasibly accomplished.
In addition to other requirements, the following standards shall apply to pump
stations which pump septic tank effluent.
30.3.1 Pumps other than those capable of passing spheres of at least 3 inches in
diameter are not acceptable. Screens should be considered where this type of
pump is used.
30.3.2 The inlet pipe shall be extended below the low water elevation in the wet well
in order to reduce turbulence and odors.
30.3.3 The lift station wet well cover shall be water -tight for odor control.
30.3.4 A vent shall be provided with odor control. The vent can be connected to a
buried gravel bed or to a charcoal filter.
30.3.5 Materials in the wet well shall be protected from corrosion. Stainless steel,
plastic, or bronze materials are recommended.
30.3.6 The force main sizing shall be based upon hydraulic requirements using a
minimum design velocity of -1 <".0 ft/sec based on a Manning's roughness
coefficient of n = 0.013. The minimum pipe diameter for force mains shall be
_.._� ,.�•�ches.
30.3.7 The force main shall be designed and constructed to prevent freezing.
30.4 Septic Tank/Effluent Pumps
30.4.1 Typically, one septic tank and one effluent pump per household will be
provided. Multiple units may be considered where serving multiple family
dwellings or trailer courts. Duplex pumps, each capable of handling maximum
flow, may be required in these situations.
30.4.2 Pumping units will be activated by appropriate level control switches. High -
and low-level alarms will be required with audio-visual alarms
recommended. Low level pump deactivation controls shall be provided. A
control panel with appropriate circuit protection and electrical safety devices
shall be used. The alarm circuit should be separately wired from the pump
circuit. All applicable electrical codes must be satisfied. The power cables to
the pump shall be designed to facilitate maintenance of the pumping unit.
Wiring shall be exterior to the residence for maintenance purposes.
30.4.3 Screens limiting solids carryover into the pump shall be,_provided. Pipe fittings
used should be commonly available. Appropriate isolation, check, and air
release valves must be used with ease of maintenance in mind. All
components shall be protected from freezing.
30.4.4 All septic tanks shall be vented.
30.5 Septic Tanks
Septic tanks are not allowed within the City limits.
]lLIFT STATIONS
]l.l Lift stations will be designed bva4VzE-Registered Professional Engineer.
31.2 All new sewage lift stations shall be equipped with a backup, redundant level control
system.
313 The [hv requires emergency power on any new |Kt station. All new pumping Lift
stations shall beequipped with an emergency power receptacle and an Automatic
transfer switch.
31.4 All new pumping Lift stations shallbe equipped with an alarm system detecting
unauthorized entry, power interruption, high water, and high pump temperature
conditions. The alarm signal shall be directed to optional remote locations by
telephone dialer system.
31.5 All new pumping station shall be equipped with an electro -magnetic flow meter with
PART 7 - WATER DESIGN TECHNICAL STANDARDS
1. PURPOSE
The purpose of this design criteria is to provide engineers, designers, engineering technicians,
and others, in handy reference form, the City's minimum standards for water system design.
These criteria are intended to cover the design of water mains and apply to any water systems,
public or private, 6_4 inches in diameter or greater. Private on-site water systems serving mobile
home parks, condominiums or apartments shall be designed in accordance with the uniform
plumbing code and approved by the appropriate building inspector.
The design criteria set forth below are intended to result in water systems which will:
1.1 Be consistent with the Water Master Plan.
1.2 Be consistent with Montana Department of Environmental Quality (DEQ).
1.3 Be consistent with the latest edition of the MPWSS.
1.4 Be of adequate size and pressure to meet expected demands, within their design life.
1.5 Have sufficient flows to meet fire flow requirements.
1.6 Be strong enough to resist all external loads which may be imposed.
1.7 Be of materials resistant to both corrosion and erosion.
1.8 Be economical and safe to build and to maintain.
Alternate materials and methods may be considered for approval on the basis of these
objectives.
2. REFERENCES
2.1 Circular -ED, :J_ 1, Standards for Water Works, Montana Department of
Environmental Quality, DesigR StandaFds fee ` rite,•,-,+, Faeilitie , latest edition.
2.2 Montana Public Works Standards Specifications, latest edition and revisions.
2.3 Uniform Plumbing Code, latest edition and revisions.
3. APPROVAL OF ALTERNATE MATERIALS OR METHODS
Apffeval 9 Request for any major deviation from these standards will be submitted to the
P\ND in written form for approval.
4. SPECIAL PROBLEMS
The design of the following are considered special problems and are not covered in detail in
these standards: `3-= -._1 provides general guidelines for most of these items.
4.1 Air relief valves
4.2 Water loading stations
4.3 Source development
4.4 Chemical application
4.5 Treatment plants
4.6 Pumping stations
4.7 Water storage
5. DESIGN PLANS AND PROFILES
Plans will be required for all new or exteRded extension of water mains and shall include both
a vicinity map and a general layout map of the area showing the location of existing facilities
and of the proposed improvements. Plans should be accurate, legible and properly detailed.
Dimensions should be either from right-of-way centerline or property lines.
5.1 Engineering Drawings (Plans)
Plans for water mains should contain at least the following information:
5.1.1 Adjacent streets, property lines, utility easements, and references thereto.
5.1.2 Location of water lines and appurtenances.
5.1.3 Location of water courses, wells, stream and railroad crossings, water mains,
sewer main, gas mains, culverts and underground power, CAN, or other
utilities wherever possible.
5.1.4 Limits of hard surface paving with dimension references.
5.1.5 Adequate details, specifications, and other information for Contractor to be
able to install the proposed improvements.
5.1.6 Suitable title plate with name and addFess of ewnefscale, north poifft arrow,
date, drawing number, and name, address and telephone of engineer, and the
Registered Professional Engineer's (RPE) signature.
5.2 Profiles
Profiles for the individual water lines should contain at least the following
information:
5.2.1 Location of valves, hydFaRtshydrant tee, and other appurtenances
5.2.2 Profile of existing and proposed ground surface.
5.2.3 Size, pipe class type, length of water line, and pipe bedding elass.
5.2.4 Suitable title plate with the name and address of owner, scale, date, drawing
number, and the name, lamE number and expiFatien date efthe . iStFatien.
5.2.5 Limits of street improvements will be shown including a typical section of the
subject street.
5.2.6 Depth of bury
5.2.7 surface restoration
5.2.8 new and existing services
5.3 Separate Drawings
5.3.1 Separate plans shall be submitted for public water mains installed in
combination with private water lines or site plumbing. "Site plumbing"
drawings are not acceptable. Public water main plans may be combined with
other public improvement plans, provided that the plans must be legible and
properly detailed.
5.3.2 Appropriate labeling of the services as "P �h, bk" GF Private" will be done on both
the plan view and profile view.
6. SPECIFICATIONS
6.1 Engineering consultants are encouraged to develop specifications and special
provisions for each project. Specifications and special provisions shall incorporate the
latest edition of the MPWSS. Special specifications pertaining to materials and
workmanship, if developed, a hard copy shall be submitted to the City for review and
approval, together with he_kPFiRtp�°�+= plans of the project.
6.2 In general, the water specifications should cover pipe material, excavation, laying of
water main, jointing, backfilling, testing, etc. Strict supervision will be required by the
City during construction to assure compliance with the specifications.
7. ADDITIONAL ITEMS OF CONCERN
7.1 Hydrostatic Testing
Hydrostatic and leakage testing shall be performed in accordance with the American
Water Works Association C600. MPWSS Section 02713, 'Water Mains" outlines
procedure.
7.2 Cleaning Water Mains
Before chlorination, except when hypochlorite tablets are used, the mains shall be
flushed thoroughly after the pressure and leakage test are completed. MPWSS Section
02713, 'Water Mains" outlines procedure.
7.3 Disinfecting Water Mains
7.3.1 General. All water mains shall be disinfected subject to the PW appF in
accordance with AWWA C651, "Disinfecting Water Mains", and MPWSS
Section 02713, 'Water Mains", before placing the main in service. The interior
of all pipe, fittings, and appurtenances shall be kept free from dirt, heavy, and
foreign particles.
7.3.2 Redisinfection. If the initial disinfection fails to produce approved
bacteriological or turbidity samples, the main shall be reflushed and
resampled. If check samples show bacterial contamination, the main must be
re -chlorinated until approved results are obtained.
8. GENERAL DESIGN CONSIDERATIONS
Water mains should be designed to serve houses, business commercial and industrial
buildings and other publie and pFivate C.rr; establishments that needs water service in the
building. Each main building on a parcel or residence on each parcel shall be served by a
separate water service.
8.1 Domestic Flows
8.1.1 Water mains shall be designed in accordance with "Circular Wc�g D_7-- _ 1,
Standards for Water Works" published by the State of Montana Department
of
Environmental Quality. Water mains shall be sized to provide a combined fire
flow and peak day flow in accordance with the standards shown below.
8.2 Fire Flows
8.2.1 For design purposes, minimum fire flows shall be 1000 gpm in low and medium
density residential areas, 2500 gpm in commercial and high density residential
areas, and 3500 gpm in industrial areas. The design shall provide for the
system to provide the minimum fire flow at each fire hydrant, assuming one
hydrant flowing at any given time and a minimum pressure of 20 psi.
8.2.2 Where special conditions exist, greater or lesser design fire flows may be
approved by the Fire Chief (as per Fire Code) for new and existing buildings.
8.3 Pressure
8.3.1 Water systems shall be designed to provide a minimum
pressure of 35 psi with no fire flow. With fire flow, a minimum
pressure of 20 psi is required in all areas. Water systems shall
be designed by consulting the latest water system model of
pressure zones. Pumping stations and pressure reducing
valves may be required to lower high pressure concerns. Pipes
shall be specified to withstand the maximum test pressures
but in no case shall pipes be classed less than 150 psi. The
designer should contact the PWD for information on the
pressure zones and water supply available for the area.
8.3.2 In general, water systems should be designed to eaFe
a r . for future flows which may reasonably be
expected within a period of 45-e-20 years, and for ultimate
development of the specific service area;.
8.3.3 Specific approval of booster pump stations, storage and
additional sources, will be required from the City.
OJTj
WVA
9.1 Design flows shall be determined by consideration of the following factors:
9.1.1 Service area to be served
9.1.2 Population within the area to be served
9.1.3 Land use within the area to be served
9.1.4 Per capita water consumption
9.1.5 Commercial, industrial, or institutional users to be served
9.1.6 Fire flow requirements
9.1.7 Peaking factors
9.2 In the absence of flow data or other reliable information, the design factors from
Table 7.1 may be assumed. Appropriate peaking ratios should be applied to determine
flows, where specified by the City.
Table 7.1
Design Factors
Average Designation
Adverse Flow
Peaking Factor
Residential
100 gpcd min,
Commercial
1,200
gpd/acre
Industrial
1,200
gpd/acre
Peaking tactor means of calculations outline in latest edition of MT Circular DEQ -i_
It is recommended that design calculations include estimates of average
maximum and rninimum da4y! flows. The submission of
design calculations will not ordinarily be required but engineers should be prepared
to substantiate pipe sizes, layout, population estimates, land uses or other design
assumptions as may be requested.
10. SIZE
Water mains shall be a minimum of 8 inches inside diameter for those systems incorporating
Fire hydrantlines of 6 --inch inside diameter.
11. PIPE MATERIALS
The following pipe materials and fittings are approved:
__._ _..-.-:.... .c_-..�-� � JI�T:rG +3 "iit¢.. A. �-0�_,:'•"' -i /" -'T/ .: wi
Ductile Iron Pioe, s9 en1e1 neo a __
■•
I 11. •I MEM
i able '7.2
,Material :ifications
Ductile Iron ripe; Class 52
ANSI/AWWA C151/A21.51-17
(polyethylene film wrapped or encased)
Polyvinyl chloride (PVC)
AWWA C900 for pipe 4" to 12", Pressure Class
150
AWWA C905 for pipe 14" to 48", DR 18 Pipe
Concrete Cylinder Pipe
Not allowed
Cast Iron Pipe
I Not allowed
Valves
10" and under shall be resilient seated gate
valves w/ iron body, bronze mounted non -rising
stem, set for 200 psi working pressure.
12" and over shall be butterfly valves class 150B,
tight closing, for underground service.
MJxMJ
All mechanical joint bolts, nuts, and washers shall
be Type 304 stainless steel.
Tapping Valve Tapping Saddle
Stainless Steel Resilient Seat Tapping Valve with
150 psi working pressure or approved equal.
Valve Boxes
Cast iron, 5-1/4" diameter, screw type
adjustable, and have the word "Water" stamped
I thereon.
Corporation Stops
%-inch to 2 -inch — Ground Key Valve with AWWA
taper threaded inlets and Compression
Connection for outlet piping.
Or approved equal.
Service Saddles
_
All Stainless Steel service saddle with 304 SS nuts
and bolts a Buna-N nitrile gasket and a minimum
working pressure of 150 psi.
I Or approved equal.
Main to Building
Service Pipe
1. Type I< Copper
2. PE Pipe (CTS) SDR 7 -3/ -inch &
1 -inch
3. PE Tube (CTS) SDR 7-1-1/2-inc
& 2 -inch (200 PSI)
Curb Stop
%-inch to 2 -inch cop x cop or CTS,
For PE pipe use compression fittings with
stainless steel inserts.
Curb Boxes
6' extension boxes with stationary one-piece
stainless steel rod.
Joint Restraint
Megalug 2000 or thrust blocks
Fire -Hydrant
AWWA C502 w/ two 2-1/2" hose nozzles and one
4-1/2" pumper nozzle with National Standard
Thread.
_
Manhole F/c
D&L Foundry or approved equal
Meters
All meters -Neptune, Remote Read
Backflow Preventers
All new construction %-inch and 1 -inch use dual
check valve
Dual Check Valve
%-inch McDonald 11-3NA-43
1 -inch McDonald model 18 -4 -10 -XD
1%2 -inch Febco 805Y -BV -S #45410;
Or approved equal.
EPA 570/9-89-007
Larger check valves to be approved by Public
Works Dept.
Alternate materials not listed must be approved by the Public Wtilities\A orks Director.
?1 PSA WSS, latest editien.
6.2.2"ate; settling ef bael(fii•I-material isprehibited.
12. MINIMUM DEPTH
All water lines shall be laid at a depth sufficient to prevent freezing and be protected against
damage from traffic. Water mains shall have a minimum cover of 6 feet measured from top
of pipe to finished grade or be otherwise protected from damage by traffic or freezing.
13. DEAD ENDS
13.1 In order to provide increased reliability of service and reduce head loss, dead ends
shall be minimized by making appropriate tie-ins whenever practical.
13.2 Where dead end mains occur, they shall be provided with a fire hydrant for flushing
purposes. Flushing devices should be sized to provide flows which will give a velocity
of at least 2%z feet per seetien econci in the water main being flushed. No flushing
device shall be directly connected to any sewer.
14. VALVES
14.1 Valves
Valves should be located at not more than 500 -foot intervals in- commercial districts
and at not more than 1 block or 800 -foot intervals in other districts.
14.2 Line Valves in Distribution Pipe
Four valves shall be installed at a "cross" intersection. Three valves shall be installed
at a "Tee" intersection.
14.3 Air Relief Valves
An a+r;,,ir relief valve will be required at the high point of each in an%, water main. Pipe
grade design shall minimize the use of air relief valves wherever possible.— Air relief
can be provided by means of a flushing hydrant, fire hydrant, or designated air release
valve.
15. HYDRANTS
15.1 Spacing
Fire hydrant spacing shall not exceed 500 feet measured along the curb line in areas
zoned R-1 or R-2 and shall not exceed 450 feet in other areas. The Fire Chief may
require additional hydrants in accordance with Uniform Fire Code. All hydrants will
have secondary valves.
16. LOCATION
16.1 Relation to Sewer Lines and Wells
Sanitary sewers and domestic water lines shall not be laid in the same trench.
Parallel water and sewer lines wherever possible should be located at least 10 feet
apart horizontally oni outside edge co outside edge o the pipe. When physical
conditions render this spacing impossible or impractical, then ductile en water
pipe with watertight joints is required for the sewer line. Wherever it is necessary
for sewer and water lines to cross each other, the crossing should be at an angle of
approximately 90 degrees and the sewer shall either be located 18 inches or more
below the water line or be eerneRt liped r ', constructed of ductile or PVC
pipe with watertight joints for a distance of 10 feet on both sides of the water line.
16.2 Water Mains in Streets or Easements
Under normal conditions, water mains should be located in street right-of-way § i
feet south or west of the street right-of-way centerline. Water mains shall be located
in centerline of alleys and easements. When it is necessary to locate waterlines in
easements, such easement shall be at least 20 feet in width.
17. PIPE JOINTS
All pipe joints must be constructed watertight. Rubber rings or other approved joint sealing
material shall be used. Joint deflections shall be controlled such that the watertight integrity
of the joint is maintained.
18. SERVICE LINE CONNECTIONS
All service laterals from a water main to serve an individual building shall be of a minimum
size of %-inch in diameter within public right-of-way or within public easements. Construction
of service lines shall conform to the same standards as for water main construction.
All curb boxes shall be marked with a permanent indicator of location in the nearest hard
surfacing (i.e. "W" stamp in adjacent curb, sidewalk, or driveway)
19. SEPARATE CONNECTION REQUIRED
19.1 Each main building or legal lot (except a private garage) shall be separately connected
to a public water main. Except that main buildings or dwellings located on a single
parcel may be connected to a private line, provided that an approved statement of
maintenance and billing responsibility is recorded with the title to the property.
19.2 A valve shall be required at the point of connection of a private water system to a
public system.
20. DRAINAGE DITCH OR STREAM CROSSINGS
Water lines entering or crossing drainage ditches or streams shall be constructed with care.
The pipe and joints shall be tested in place, and shall be designed, constructed, and
protected against anticipated hydraulic and physical, longitudinal, vertical, and horizontal
loads, erosion, and impact.-'
All ditch crossings shall require approval of the ditch company.
21. AERIAL CROSSINGS
Support shall be provided for all joints in pipes utilized for aerial crossings. The supports shall
be designed to prevent frost heave, overturning, and settlement. The crossings shall also
cC=1011I vial P''71I-1
There shall he .. physieal e eeti.,...- het...eeR a Ublie OF .ate
potable ate supply ste and a sewer, e uFte eche. ete
.,hieh would pev..,it the passage of -,.,.. wastewat. F eF polluted water
PART 8 — STORM SEWER DESIGN
1. INTRODUCTION
1.1 Applicability
These design standards shall apply to all development, redevelopment, and
construction activities on public and private property within the City of Laurel.
1.2 Policy Requirements
Drainage plans shall be prepared by a Professional Engineer licensed in the State of
Montana and shall be submitted to the City PWD for review and approval.
2. PROJECT CLASSIFICATIONS
2.1 All Developments
2.1.1 Impact to water quality and quantity because of development shall be
mitigated through design and construction of on-site or regional stormwater
management facilities provided in accordance with these standards.
2.1.2 Stormwater discharge to private irrigation ditches, drains and laterals is
acceptable provided approval has been granted by such facility
owner/operator and discharge is controlled to ensure the ditch, drain or lateral
facility is not adversely impacted beyond existing conditions. An agreement
shall be signed between the facility owner/operator and developer with the
City named as a third party. Agreement must state at a minimum the following:
• Development's discharge requirements,
• Conditions of use,
• Maintenance responsibilities
2.1.3 Provisions stating that the City shall have the first right to accept the automatic
transfer of all interests and easements of the ditch/drain facility should the
ditch/drain facility operator abandon their facility adjacent to the
development. +
2.2 Residential Lot Developments
These requirements apply to residential lot development, including single family
homes, duplexes, townhomes, and condo developments constructing two or less living
units on a single lot and for "minor" construction projects in which improvements
create more than 1,000 SF of impervious surface.
Part 8—Storm Sewer Design 8-1
2.2.1 Site grading requirements shall follow specific requirements established in/on
the subdivision plat, SIA or any covenants within the subdivision.
2.2.2 Runoff generated from a residential site (or new improvements) shall not drain
from that site to a neighboring property.
2.2.3 Stormwater features shall be preserved per the initial design and maintained
by the property owner.
2.2.4 The elevation of residential dwellings must be established in recognition of the
storm runoff flows allowed in the gutter flowline of adjacent streets during
major storms.
2.2.5 Submit a Site Stormwater Plan (SSP)in accordance with section 3.1.1 detailing
lot grading and drainage plans.
2.3 Commercial Property Developments
2.3.1 These requirements apply to all commercial, industrial, and residential projects
constructing three or more living units on a single lot. They shall apply to
commercial expansion projects in which the improvements create more than
2,500 SF of impervious surface.
2.3.2 Stormwater Management facilities shall be design and constructed in
accordance with section 2.4.
2.3.3 Runoff from the 10 and 100 -year storm events shall not exceed 50 -percent of
the runoff rate of natural (pre -developed) conditions, prior to subdividing or
developing the land. Alternatively, in special cases, subject to City approval,
development may discharge at a higher rate than specified above if engineer
provides adequate justification that discharge will not create nuisance, flooding
or property damage downstream of the development. Pre -developed rates
used to justify maximum allowable discharge rate, shall be subject to approval
by City reviewer and shall be based on minimal value anticipated from range of
values within common accepted engineering practice for the existing
hydrological conditions.
2.3.4 If a new connection to the City's storm drain system is installed the
development's stormwater system which connects to the City storm drain
system shall be brought into compliance with the requirements of this section.
2.3.5 Due to the potential for increased Stormwater pollutant runoff, some sites may
require additional regulatory and design requirements.
2.3.5.1 Facilities requiring additional pollutant removal are:
Part 8 — Storm Sewer Design 8-2
A. Fueling station — require oil and metals treatment,
B. Facility storing/transporting more than 1,500 gallons of petroleum
products — require oil treatment,
C. Hydraulic equipment storage — require oil and metals treatment,
D. Property zoned heavy industrial — require oil and metals treatment,
E. Vehicle maintenance/repair — require oil and metals treatment,
F. Nurseries— require nutrient treatment,
G. Lawn care/fertilizer facility— require nutrient treatment,
H. agricultural or animal care facility, or other similar facilities—require
nutrient treatment,
I. Facility specific as determined necessary by the City
2.3.5.2 Pollutant removal applies to stormwater runoff of the above facilities
and shall treat the below areas:
A. Oil Treatment
• required for all high use and high traffic areas that may contain
oils and grease,
• Provide for no ongoing or recurring visible sheet and reduce
Total Petroleum Hydrocarbons (TPH) to less than 10 mg/I
B. Metals Treatment
• Removal is achieved by basic removal of total suspended solids
(TSS),
• Removal should be from 20 to 85% depending on design, metal
state, and influent concentration,
C. Nutrient Treatment
• Nitrogen and phosphorus should achieve 50% reduction of
total phosphorus and 35% reduction of total nitrogen
2.3.6 Above ground storage in parking lots may not pond to a depth greater than 12
inches during the major storm.
Part 8 — Storm Sewer Design 8-3
2.3.7 Where infiltration is used for storm water discharge a geotechnical and
hydrogeologic evaluation shall be performed that analyzes the capacity of
ground to accept discharge.
2.3.8 A comprehensive Drainage Plan (CDP) in accordance with Section 3.1.2 shall be
submitted.
2.3.9 The Owner shall call for City inspection of drainage features prior to backfilling
and a TV report shall be submitted for storm drain connections within the
public right-of-way.
2.3.10 All facilities shall be owned, operated, and maintained by the property owner.
2.4 Subdivisions
Subdivisions shall comply with section 2.3 above as well as the following:
2.4.1 The requirements of this section apply to subdivisions within City Limits as well
as tracts of land under review for annexation.
2.4.2 Stormwater management facilities shall be provided and designed to avoid
impact to downstream drainage infrastructure and properties in accordance
with this section. Points of discharge from the development shall be at
locations where runoff flows from the site in the pre -developed drainage
condition and shall mimic the type of flow that exists in the pre -developed
condition to prevent erosion, flooding or other damage to downstream
infrastructure or downstream properties. Where multiple points of discharge
exist for one development, each point of discharge shall comply with these
provisions individually. Exceptions may be made for downstream facilities that
are designed to handle increase flow rates and volumes. In those cases, these
standards will be assessed at the downstream end of those facilities.
2.4.3 Runoff entering the Subdivision from upstream properties shall be evaluated
and either included in the composite rate and volume of runoff from the
subdivision, or diverted through or around the subdivision, back into natural
pre -developed drainage courses as the off-site run-off existed prior to
development.
2.4.4 The elevation of residential dwellings, buildings, or other permanent facilities
must be established in recognition of the depth of flow in the gutter flowline of
adjacent streets during the Major Storm. Established minimum building
elevations shall be documented in the SIA, plat or other applicable recorded
document.
Part 8 —Storm Sewer Design 8-4
2.4.5 A copy of the HOA agreement, 0&M Manuals, and BMP inspection checklist
shall be submitted and include provisions for maintenance and operation of all
privately owned stormwater management facilities.
2.4.6 Curb cuts for drive approaches installed during initial subdivision construction
shall be constructed to accommodate gutter flow to the full curb depth
throughout the subdivision.
2.4.7 If off-site discharge onto neighboring properties is required where it has not
historically occurred, a drainage easement must be obtained through the
downstream neighboring properties to the point at which the runoff is
collected in a public drainage facility.
2.4.8 Stormwater facilities within a subdivision, excluding conveyance facilities
within public Right of Ways (ROW), shall be owned, operated and maintained
by the subdivision HOA. Stormwater facilities outside of the ROW shall be
located within a lot owned by the HOA and shall include a platted easement
and associated access to the ROW. Easement shall detail property owner/HOA
use and maintenance of easement area. landscape plans shall be submitted
with the development plans.
2.5 Maintenance Activities
The activities listed below are considered to be "maintenance" and are therefore not
governed by the requirements of this manual. Exclusion from these stormwater
management requirements does not relieve the development of other required
permits and submittals. Contact the City Public Works Office to determine what (if
any) permits or submittals are required.
2.5.1 Replacement of existing infiltration facilities; i.e., boulder pits or French drains.
2.5.2 Resurfacing of an existing parking lot, including reconstruction of base gravel if
grades of the parking lot have not altered drainage patterns.
2.5.3 City of Laurel maintenance or rehabilitation projects.
2.5.4 Private utility improvement projects disturbing less than one -acre of land
surface.
2.5.5 If a new connection is made to the City's storm drain system, the development
shall meet the requirements of 2.4.
3. PLAN SUBMITTAL REQUIREMENTS
3.1 Site Stormwater Plan (SSP) Stormwater Drainage Plans are divided into two categories
based upon the development type; Site Stormwater Plan (SSP) and Comprehensives
Part 8 — Storm Sewer Design 8-5
Drainage Plan (CDP). The applicability and requirements for each are described as
follows:
3.1.1 Site Stormwater Plan (SSP)
A. The SSP applies to all developments listed in Section 2.2 and shall be
reviewed and accepted prior to issuance of a building permit. The following
shall be addressed in an SSP submittal:
Inform the City as to the drainage plan, the nature of the construction,
project schedule, downstream conveyances, and project contact
information. Plan shall include all finished floor elevations, drainage
flow paths, top back of curb elevations, downspout, window well
locations and similar critical elevations.
® Identify the drainage pattern of adjacent lots to ensure a common
drainage approach within the development area is being met.
Show all easements within lot and show/identify all site-specific criteria
and requirements listed within the subdivision SIA, if applicable.
B. If after review of the SSP, the City determines that more detail or
information is required, the City may require a Comprehensive Drainage
Plan.
3.1.2 Comprehensive Drainage Plan (CDP)
A. The CDP applies to all developments listed in Sections 2.3 and 2.4 and shall
be reviewed and accepted prior to issuance of a building, right-of-way
permit, preliminary plat approval or final plat approval, as applicable. Table
8.1 shall be used to identify required information to be submitted for
various development activities. Additional information to guide these
submittals is provided in the referenced appendices.
B. Preliminary Drainage Report
The Preliminary Drainage Report is to be provided at the time of preliminary
plat application and is to identify and describe site drainage impacts and
illustrate preliminary solutions to the drainage system and any
problems which may occur on-site and off-site as a result of the
development. The report shall be based on the outline in Appendix A.
C. Final Drainage Report
The Final Drainage Report is to provide in depth details and calculations
to address the drainage issues and present sizing and locations for all
Part 8—Storm Sewer Design 8-6
proposed improvements. The report shall be based on the outline
provided in Appendix B.
• In addition to details and calculations, the Final Drainage Report shall
include a narrative describing in detail how the site and site features
will function for the water quality storm and the Minor and Major storm
events.
• If infiltration to underlying soils will be used to manage any portion of
the site runoff, refer to procedures outlined in Appendix C and the
geotechnical/hydrogeological requirements of this manual.
,Table8.1- Comprehnsiue Erainage.Ptan (01111),.Submittals
Required Submittal
Geotechnical/
Dev'elopment
Develo
Preliminary
Final
Hydrogeological
Drainage
Drainage
Report (If
O&M
HOA
SIA
Reference
ActivReport
Report
infiltration is
used)
Appendix
Commercial
X
X
X
B, C, & D
Preliminary
X
X
X
Appendix
Plat
A& C
Subdivision
Appendix
Construction
X
X
X
X
B, C, D, &
Permit
I E
3.1.3 Geotechnical/ Hydrogeological Report
A. The Geotechnical/Hydrogeological Report is to provide information such
that reviewer has a clear understanding of underlying soils and
groundwater characteristics and how those will interact with an be
impacted by the proposed development. The report shall be based upon
the outline provided in Appendix C.
B. In addition to the report, a letter from the geotechnical or hydrogeological
professional shall be submitted stating the impacts that the stormwater
runoff will have to groundwater levels, structures, and facilities both within
Part 8 — Storm Sewer Design 8-7
and outside the limits of developments. If impacts are identified, the report
shall provide mitigation solutions for the development.
3.1.4 Operation and Maintenance (0&M) Plan
The O&M plan is to identify the party responsible for operations and
maintenance of the stormwater facility, detail maintenance
schedules/activities and to ensure adherence with approved design operating
conditions.
3.1.5 Homeowners' Association (HOA) Agreement
For subdivision development, an HOA agreement shall be submitted and
approved to ensure perpetual legal validity and financial stability of the party
responsible for ownership and maintenance of the stormwater facility and the
template form found in Appendix E.
4.1 Application
4.1.1 This chapter provides design storm frequency and precipitation data to be used
in the design of stormwater management facilities within the City of Laurel. The
information provided for the Water Quality Storm is intended for use in the
design of permanent water quality treatment facilities.
4.2 Design Storm Frequency
4.2.1 The design storm frequency varies depending on the development type as well
as the street classification as shown in Tables 8.2 and 8.3.
Storm drain conveyance systems shall be designed and constructed where needed to assure that
flow depths and spread in street do not exceed allowances for the various storm scenarios
specified in Table 8.2.
4.3 Design storm depth and intensity
Part 8 — Storm Sewer Design g_g
4.3.1 Rainfall depths and intensities are provided in Table 8.3 and 8.4 for the City of
Laurel, including durations from 5 minutes up to 24 hours and recurrence
intervals from 2 years up to 100 years. This information was derived using
precipitation data available from the National Climatic Data Center (NCDC) for
Billings Logan International Airport (NCDC Cooperative Station Number 240807
(NCDC, 2014) for the period of record from July 1948 through September 2013.
Table 8.3 - Precipitation Depth - Duration
(Depth to inches)
Duration `
2' -year
Duration
2 -year
5 -year > 10 -year `
5 -year
50 -year
100 -year
5 -min
0.27
0.42
0.51
0.65
0.75
0.85
10 -min
0.39
0.58
0.70
0.87
1.00
1.13
15 -min
0.47
0.68
0.83
1.03
1.18
1.33
20 -min
0.50
0.75
0.91
1.13
1.30
1.46
25 -min
0.54
0.80
0.98
1.21
1.39
1.56
30 -min
0.56
0.84
1.02
1.28
1.47
1.66
35 -min
0.59
0.89
1.08
1.34
1.53
1.72
40 -min
0.61
0.92
1.12
1.39
1.59
1.78
45 -min
0.63
0.95
1.16
1.43
1.64
1.84
50 -min
0.65
0.97
1.19
1.47
1.68
1.89
55 -min
0.67
1.00
1.22
1.50
1.72
1.93
1 -hr
0.68
1.03
1.26
1.55
1.76
1.97
2 -hr
0.76
1.11
1.34
1.63
1.85
2.07
3 -hr
0.85
1.18
1.40
1.68
1.88
2.09
6 -hr
1.05
1 1.38 1
1.60
1 1.88
2.08
1 2.28
12 -hr
1.29
1.67
1.92
2.23
2.46
2.70
13.38
24 -hr
1.57
2.05
2.37
2.78
3.08
Based on DOWL Precipitation Analysis (2015)
Table 8.4 - Precipitation Intensity,- Duration
(intensity In Inches, per Hour)
Duration `
2' -year
5 -year
10 -year
25 -year
50 -year
100 -year
5 -min
3.26
5.02
6.18
7.75
8.96
10.16
10 -min
2.33
3.45
4.19
5.20
5.98
6.75
15 -min
1.87
2.74
3.31
4.11
4.72
5.32
20 -min
1.50
2.24
2.73
3.39
3.89
4.38
25 -min
1.29
1.93
2.35
2.91
3.33
3.76
30 -min
1.12
1.68
2.05
2.55
2.94
3.33
35 -min
1.01
1.52
1.85
2.29
2.62
2.95
40 -min
0.92
1.38
1.68
2.08
2.38
2.68
45 -min
0.84
1.26
1.54
1.91
2.18
2.45
Part 8 -Storm Sewer Design 8-9
50 -min
0.78
1.17
1.43
1.76
2.02
2.27
55 -min
0.73
1.09
1.33
1.64
1.88
2.11
1 -hr
0.68
1.03
1.26
1.55
1.76
1.97
2 -hr
0.38
0.55
0.67
0.82
0.93
1.03
3 -hr
0.28
0.39
0.47
0.56
0.63
0.70
6 -hr
0.18
0.23
0.27
0.31
0.35
0.38
12 -hr
0.11
0.14
0.16
0.19
0.21
0.22
24 -hr
0.07
0.09 1
0.10
0.12
0.13
0.14
Based on DOWL Precipitation Analysis
(2015)
4.3.2 The rainfall depth for a 24-hour storm in Table 8.3 shall be used together with
the SCS (NRCS) Type II rainfall distribution to develop the 24-hour storm
hyetograph for runoff hydrograph analyses. The rainfall intensities listed in
Table 8.4 for the corresponding durations (times of concentration) shall be
used in the Rational Method to determine peak runoff rates.
4.4 Water Quality Storm
4.4.1 The water quality design storm shall be used to size runoff treatment and water
quality BMPs. Runoff treatment BMPs should be sized based on either the
water quality volume or flow rate in order to achieve the required treatment
efficiencies.
4.4.2 The water quality runoff volume and/or flow rate for post -development
conditions shall be based on the 0.5 -inch rainfall event. This storm was selected
by the Montana DEQ and issued in the General Permit and has been adopted
by the City of Laurel as the water quality design storm.
5. RUNOFF
5.1 Application
This chapter discusses criteria for drainage basin delineation and for selection of
acceptable stormwater runoff calculation methods to be used for drainage design
within the City of Laurel.
5.2 Drainage Basin Area
5.2.1 The total area, including upstream offsite areas, contributing to the point of
interest shall be included in the delineation of drainage basins. Runoff from
upstream undeveloped land, not part of the proposed project shall be included
in the design calculations. Runoff from upstream developed property must be
determined based on the existing conditions or approved drainage plans. A
detailed contoured map with the best information available shall be used to
identify off-site areas. Contributing drainage areas should take into
Part 8 - Storm Sewer Design 8-10
consideration potential for overflow of existing ditches or other facilities
upstream of the project.
5.3 Selection of Runoff Calculation Methods
Table 8.5 — Acceptable Runoff Calculation Methods
Runoff
Calculation
Applications
Limitations/Notes
Method
-Used for determining peak
-Should only be used for developments and
runoff rates for sizing
basins of 5 acres or less
conveyance systems
Rational
Method
-Should only be used for basins with
-Should not be used when
homogeneous land uses
routing of runoff
hydrographs is required
-Should only be used for developments and
basins of 5 acres or less
Modified
-A simplified method used to
Rational
approximate storage
Method
requirements for small
drainages
-Used for determining peak
runoff rates and runoff
hydrographs for large
NRCS (SCS)
drainage basins
-Should be used for developments and basins
Method
larger than 5 acres
-Used for determining
storage requirements for
detention or retention
facilities
5.4 NRCS (SCS) Hydrograph Method
5.4.1 The SCS Hydrograph Method shall be employed using the procedures detailed
in Section 3.2.4 of the HEC -22 Manual
(http://www.fhwa.dot.gov/engineering/hydraulics/pubs/10009/10009.pdf).
Part 8 — Storm Sewer Design 8-11
5.4.2 Use site-specific soils information for the project site when available, or the
Natural Resources Conservation Service (NRCS) Soil Survey of Yellowstone
County to identify the soils and corresponding hydrologic soil groups for each
drainage basin
5.4.3 Time of Concentration
The time of concentration (TC) shall be calculated using the procedures detailed
in TR -55 Method
(https://www.nres.usda.gov/Internet/FSE DOCUMENTS/stelprdb1044171.pdf).
Sheet flow lengths shall be limited to no more than 100' When TC is used to
estimate pre -developed flow rates to justify maximum allowable discharge rate,
upper end of potential TC range shall be assumed.
5.4.4 Curve Numbers
Curve numbers (CNs) to be used shall be as set forth in Table 8.6. Depending
on basin area, multiple CNs with associated flow properties may be required. A
conservative approach shall be used when determining CN values. When CNs
are used to estimate pre -developed flow rates to justify maximum allowable
discharge rates, lower end of potential CN range for given conditions shall be
assumed.
Table 8.6 — Runoff Curve Numbers for Urban Areas
(Average Watershed Condition, la = 0.2 SR)
Land Use Description
Curve Numbers for Hydrologic Soil Group
A B C D
Fully Developed Urban Areas (Vegetation Established)
Lawns, open spaces, parks, golf courses, cemeteries, etc.
Good condition; grass cover on 75% or more of the area
39
61
74
80
Fair condition; grass cover on 50 to 75% of the area
49
69
79
84
Paved parking lots, roofs, driveways, etc.
98
98
98
98
Streets and roads
Paved with curbs and storm sewers
98
98
98
98
Gravel
76
85
89
91
Dirt
72
82
87 1
89
Paved with open ditches
83
89
92
93
Average % impervious*
Commercial and business areas 85
89
92
94
95
Industrial districts 72
81
88
91
93
Residential Lots: Average % impervious*
65
7785
90
92
38
61
75
83
1
87
30
57
72
81
86
Part 8 —Storm Sewer Design 8-12
25
54
70
80
85
*Interpolate as necessary
Developing Urban Areas (No Vegetation Established)
Newly graded area
77
86
91
94
Native Ground Cover
Herbaceous — mixture of grass, weeds and low growing brush,
ith brush the minor element (30%-70% ground cover)
71
81
89
Herbaceous — mixture of grass, weeds and low growing brush,
with brush the minor element (>70% ground cover)
62
74
85
Sagebrush with grass understory
35
47
55
Pasture, grassland or range — continuous forage for grazing
39
61
74
1 80
Meadow—continuous grass, protected from grazing, mowed fo
hay
30
58
71
78
Cultivated Agricultural Lands
Row crops
67
78
85
89
Close -seeded or broadcast legumes or rotation meadow
58
72
81
85
mall grain crops
63
75
83
87
5.5 Rational Method
5.5.1 The Rational formula is given as follows:
Q = CfCIA
Where: Q= Flow in cfs,
Cf = correction factor for infrequent storms,
C = a dimensionless runoff coefficient,
I = rainfall intensity in inches per hour, and
A = drainage area in acres
5.5.2 The Rational Method shall be applied using the procedures detailed in Section
3.2.2 of the HEC -22 Manual
(http://www.fhwa.dot.gov/engineering/hydraulics/pubs/10009/10009.pdf).
5.5.3 Frequency Correction Factors. Table 8.7 lists the correction factor to be used
for infrequent storm events.
Table 8.7 — Frequency Correction Factors for Rational Method
Recurrence Interval (years) Adjustment Factor Cf
2 and 10 -year 1.00
25 -Year 1.10
50 -Year 1.20
100 -Year 1.25
NOTE: C*Cf should not exceed 1.00
Part 8 — Storm Sewer Design 8-13
5.5.4 Runoff Coefficients
Runoff Coefficients to be used shall be as set forth in Table 8.8. A conservative
approach shall be used when determining coefficient values. When "C" is
used to estimate pre -developed flow rates, lower end of potential "C" rage
for given conditions shall be assumed.
77
T6016'8ig Run6ff mwc d
Type of Drainage Area Runoff Coefficient, C*
Residential:
Neighborhood areas
0.70
Single-family areas
0.50
Multi -units, detached
0.60
Multi -units, attached
0.75
Apartment dwelling areas
0.70
Industrial:
Light areas
0.80
Heavy areas
0.90
Parks, cemeteries
0.10-0.25
Playgrounds
0.20-0.40
Railroad yard areas
0.20-0.40
Unimproved areas (forest)
0.10-0.30
Lawns:
Sandy soil, flat, 2%
0.10
Sandy soil, average, 2-7%
0.15
Sandy soil, steep, 7%
0.20
Heavy soil, flat, 2%
0.17
Heavy soil, average 2-7%
0.22
Heavy soil, steep, 7%
0.35
Streets, parking lots and other paved areas:
Asphaltic and concrete
0.95
Brick
0.85
Drives, walks and roofs
0.95
Gravel Areas
0.70-.85
*Higher values are usually appropriate for steeply sloped areas and longer return periods as
infiltration and other losses have a proportionally smaller effect on runoff in these cases
5.6 Modified Rational Method
5.6.1 The Modified Rational Method approximates the volume of runoff for various
storm durations, with peak flows based on the time of concentration for each
respective duration. The difference between the volume of runoff into the
Part 8 — Storm Sewer Design 8-14
facility and the outflow from the facility, computed for the various storm
durations is used to establish the maximum required detention storage.
5.6.2 This simplified approach is valid for basins with contributing areas less than 5
acres.
5.7 Computer Aided Design Software
5.7.1 Use of computer aided design software is allowed. However, designer shall
provide a detailed, written explanation, within the body of the CDP, detailing
selection of input parameters, description for how program calculates results,
and a detailed explanation of those results. Appurtenant results pages shall
be provided in an appendix of the CDP.
6. HYDRAULIC ANALYSIS AND DESIGN
6.1 Application
This chapter provides criteria to be used in the design of both public and private storm
drainage infrastructure including inlets, manholes, storm drain, open channels,
culverts, and bridges to safely convey storm runoff for projects within the City of
Laurel.
6.2 Gutter Flow
The City allows the use of streets for drainage within the limitations specified in Tables
8.9 and 8.10 Contact the PWD for determination of a street's classification.
Table 8.9 — Allowable Use
Of Streets For Minor Storm Runoff
Street Classification
Maximum Street Encroachment
Local
No curb overtopping. Flow may spread to crown of street.'
Collectors
No curb overtopping. Flow spread must leave at least one, 11' lane
free of water, five feet either side of the street crown.'
Arterials
No curb overtopping. Flow spread must leave at least two, 11' lanes
free of water, ten feet each side of the street crown or median.'
Arterials (more than 6
No curb overtopping. Flow spread must leave at least four, 11'
lanes)
lanes free of water, twenty feet each side of the street crown or
median.'
1Where no curbing exists, encroachment shall not extend beyond property lines, except at drainage easements.
Part 8 — Storm Sewer Design 8-15
6.2.1 Hydraulics
Gutter flow encroachment and hydraulics shall be evaluated using the methods
presented in Section 4.3 of the HEC -22 Manual
(http://www.fhwa.dot.gov/engineering/hydraulics/pubs/10009/10009.pdf).
6.2.2 Minimum Gutter Slope
Gutters shall be constructed at slopes no flatter than 0.3 percent for retrofit
conditions and 0.5 percent for new construction. For new gutter sections in
vertical curves, the k -value shall be less than or equal to 167 to provide for
adequate drainage. If the k -value exceeds 167, special consideration shall be
given to promote drainage.
6.2.3 Inlet Spacing and Location General
The interception capacity of inlets and required spacing shall be determined in
accordance with the procedures described in Sections 4.3 and 4.4 of the HEC -22
Manual.
6.2.3.1 Recommended Locations for inlets
A. Away from ADA ramps
B. Prior to pedestrian crossings
C. At low points in the gutter grade
D. Where significant flows from off the right-of-way are expected
E. On horizontal curves where a change from normal crown to
super -elevation may cause water to sheet -flow across the road
F. Where lay -down curb (e.g., at approaches) may allow the flow to
escape and cause flooding
G. Where necessary to maintain gutter flow widths and depths within
the allowable limits set forth in Tables 8.9 and 8.10
H. Mid -block inlets within subdivisions, shall be located along property
lines to minimize impacts to future driveways and other
development features
I. Where a curbed roadway dosses a bridge, the gutter flow should
be intercepted and not permitted to flow onto the bridge.
6.2.3.2 Inlets Are Not for Flood Prevention
Part 8 —Storm Sewer Design 8-16
Inlets shall not be considered as the sole defense for flood protection.
Grading design shall not allow water to back up and flood any parts of
a building during a major storm event in the event that an inlet is
blocked.
6.2.3.3 Inlet Types
Allowed storm inlet types include grated and combination (grated with
curb opening or grated with curb opening plus slotted drain) inlets. The
City of Laurel standard inlets include Type II inlets in sag locations and
Type III inlets for on -grade installations for streets without curb and
gutter, these inlets may not be appropriate, and another inlet may be
selected with City approval.
• Inlets in low point along road profile — calculated inlet capacity at
low points shall assume 50 percent plugging by debris.
• Inlets along straight graded sections of road profile—calculated inlet
capacity in straight grade areas shall assume 25 percent plugging by
debris.
• Inlets installed within the right-of-way, or are adjacent to trails,
sidewalks, and bike lanes must have grates that are designated for
pedestrian and bicycle traffic. Approval by the City is required for
inlets within the right-of-way that are not designated for pedestrian
and bicycle.
6.3 Storm Drain
6.3.1 Hydraulics
Use the methods set forth in Chapter 7 of the HEC -22 Manual for the hydraulic
design of storm drains, except as modified herein
(http://www.fhwa.dot.gov/engineering/hydraulics/pubs/10009/10009.pdf).
6.3.2 Diameter, Slope, and Velocity Limits
A. Minimum slopes for storm drainpipes shall be as required to maintain a full -
flow velocity of at least 2.5 feet per second during the Minor Storm Event.
B. Minimum diameter for storm drain lines and laterals, which will be part of
the public storm drainage system, shall be 12 inches. Minimum diameter
for private connections into the public storm drainage system shall be 6
inches. Pipe sizes shall not decrease in the downstream direction and
transitions from smaller pipes to larger pipes shall occur by matching the
inside top (crown) of the pipes where practicable. Where it is not possible
Part 8—Storm Sewer Design 8-17
to match crowns, the 67 -percent diameter points of the pipes shall be
matched at a minimum, where practicable; or, upon approval from the City
Public Works Office, inverts may be matched if the HGL does not exceed
the street elevation during a minor storm event.
6.3.3 Maintenance Access
A. All stormwater pipe and facilities shall be accessible for operation and
maintenance.
B. When vehicle access is necessary, for facilities constructed outside of the
street section, access roads shall be provided in access easements. The
minimum clear driving lane width of access roads is 12 feet. Access roads
shall have a maximum grade of 9% and shall be constructed with gravel,
pavement, concrete or an appropriate all -season surface.
C. Gates and/or bollards are required when necessary to restrict access to
stormwater facilities. Cables and/or chains stretched across access roads
are not acceptable.
6.3.4 Manning "n" Values
The Manning's "n" value used for the design for storm drains shall be as shown
in Table 8.10.
N aDie ts.iu -- manning -s wertl!clents {nl) ror storm tarai n wnaufts
Pipe Material
Roughness or Corrugation
Manning's n
Concrete Pipe
Smooth
0.013
Concrete Boxes
Smooth
0.015
Spiral Rib Metal Pipe
Smooth
0.013
2-2/3 by 1/2 in Annular
0.027
Corrugated Metal Pipe,
2-2/3 by 1/2 in Helical
0,023
Pipe -Arch and Box
2-6 by 1 in Helical
0.025
5 by 1 in
0.026
3byIin
0.028
6 by 2 in Structural Plate
0.035
9 by 2-1/2 in Structural Plate
0.037
Poly Based Thermoplastic
Smooth
0.015
Corrugated
F.025
PVC Based Thermoplastic
Smooth
P.011
*Published va!ues may differ; however, values presented in this table assume long term use of pipe
which leads to increased roughness. Manufacturer recommendations shall be used if values are higher
than presented above.
6.4 Materials
Part 8 — Storm Sewer Design 8-18
6.4.1 Access Manholes
A. Access manholes are required when joining pipes of different types, sizes,
at horizontal or vertical bends in the alignment, at lateral connections, and
at the upstream terminus of storm drain mains.
B. Required Size
The required minimum manhole size shall be 48 -inches and larger when
required by pipe sizes and geometry to satisfy applicable ASTM
specifications.
C. Required Spacing
The maximum manhole spacing along storm drains is as set forth in Table
8.11.
Table 8.11"— Maximum Allowable Manhole Spacing
Storm Drain Diameter
Maximum Spacing
12" to 36"
400'
42" to 60"
500'
66" and Larger
600'
6.4.2 Maximum Manhole Depth
Manhole depths shall not exceed 20 feet without special safety provisions such
as intermediate platforms and minimum diameter risers of 48 inches.
6.4.3 Drop Manholes
The difference between the highest trunk line pipe invert entering a manhole
and the invert leaving shall not exceed 24 inches. Manholes with drops
exceeding 24 inches shall be designed as drop manholes. Drop manholes with
drop heights exceeding six feet shall be designed with high strength (6,OOOpsi)
concrete.
6.5 Clearance from Other Utilities
The following utility clearances shall be maintained where possible. All clearance are
based on the outside edge of the storm drain to the outside edge of the other
utilities.
6.5.1 Horizontal clearances from storm main:
• Cable TV, Gas, Power 5 feet
Part 8 — Storm Sewer Design 8-19
Sewer 6 feet
Telephone, Fiber Optics 5 feet
Water 10 feet
6.5.2 Vertical clearances from storm main:
• Cable TV, Gas, Power
1 feet
• Sewer
1 feet
• Telephone, Fiber Optics
1 feet
• Water
1.5 feet
• Misc. Private Utilities
1 feet
6.5.3 Water main crossings shall be designed to prevent freezing due to minimal
clearance from storm drains.
6.5.4 Avoid crossing other utilities at highly acute angles. The angle measure
between utilities shall be between 45 and 90 degrees where possible.
Private Drainage System Connections
Private drainage system connections to the public storm drain system shall comply
with the following criteria. Such connections shall be entirely owned and maintained
to the main by development in which the connection was installed and/or serves.
6.6.1 All private stormwater connections shall include backflow prevention to
prevent stormwater from the City's storm drain system from surcharging onto
private property unless such backflow is not possible due to grades. Backflow
preventer must be installed on-site and not within the public right-of-way.
A. Minimum pipe diameter discharging to the City's storm drain system shall
be 6 inches. The maximum pipe diameter allowed will depend on an
evaluation of the capacity of the City's storm drain system and
approval from the City Public Works Office.
B. Directly connected pumped connections to the City's storm drain system
are not allowed. Developments may install a pump to mitigate stormwater
runoff per the requirements of this manual; however, stormwater runoff
shall be pumped to a manhole or other feature prior to making a gravity
connection to the City's system.
C. Directly connected pumped connections to the connections shall only
be made at a structure.
Part 8—Storm Sewer Design 8-20
6.7 Outfalls
6.7.1 General
• Use the methods set forth in Chapter 7.1.5 of the HEC -22 Manual, as
modified herein.
• Invert elevations of outfalls shall be no lower than the bank -full water
surface elevation (2 -yr flood) in open channels or streams, where practical.
• Outfalls downstream of detention facilities shall be designed to prevent
backwater into those facilities.
• Outfalls within ditches/drains shall be constructed with fire -proof material.
6.7.2 Erosion Protection
Erosion protection is required at the outlet to prevent erosion of the outfall
channel bed and bank.
6.7.3 Energy Dissipation/Rip-Rap
A. Where flow velocities exceed 10 feet -per -second at the outfall, during the
design storm, energy dissipation, in addition to erosion protection may be
required. Design energy dissipation measures in accordance with FHWA
HEC -14, "Hydraulic Design of Energy Dissipaters for Culverts and Channels"
(https://www.fhwa.dot.gov/engineering/hydraulics/pubs/06086/hec14.p
df).
B. Rip -Rap size and classification shall be based upon flow rates to be
mitigated. Rip -Rap sizing shall follow MDT's guidelines within their
Standard Specifications, Division 700:
http://www.mdt.mt.gov/other/webdata/external/const/specifications/20
14/division 700.Ddf
6.7.4 Maintenance Access
All stormwater pipe and facilities shall be accessible for operation and
maintenance.
When vehicle access is necessary, for facilities constructed outside of the street
section, access roads shall be provided in dedicated access easements. The
minimum clear driving lane width of access roads is 12 feet. Access roads shall
have a maximum grade of nine percent and shall be constructed with gravel,
pavement, concrete or an appropriate all- season surface.
Part 8 — Storm Sewer Design 8-21
Gates and/or bollards are required when necessary to restrict access to
stormwater facilities. Cables and/or chains stretched across access roads are
not acceptable.
6.8 Open Channel Conveyances
6.8.1 General
A. New or altered channels shall be lined with grass, rocks or other erosion
resistant materials adequate to prevent erosion during maximum design
flow scenario. Concrete or asphalt shall not be used unless approved by the
City Public Works Director.
B. Design open channels in accordance with the methods provided in Chapter
5 of HEC -22 except as modified herein.
6.9.2 Clearance
Channels shall be located no closer than ten feet from any structure foundation
as measured horizontally from the edge of the swale at the top of freeboard
elevation.
6.8.3 Erosion Control
A. Channel segments shall be designed according to the permissible tractive
force (shear stress) methodology set forth in Section 5.3 of HEC -22 and
Hydraulic Engineering Circular 15
(http://www.fhwa.dot.gov/engineering/hydraulics/pu bs/10009/10009. pdf,
http://www.fhwa.dot.gov/engineering/hydraulics/pu bs/05114/05114.pdf,
respectively)
B. Both the bare soil condition immediately following construction and the
anticipated vegetated conditions of the channel shall be evaluated. If the
channel is determined to be unstable during the maximum design storm
event for either of these conditions, the appropriate long-term, temporary,
and transitional linings shall be installed.
C. Erosion control structures, such as check drops or check dams, may be
required to control flow velocities.
6.8.4 Freeboard Requirements
A minimum freeboard of one -foot from the water surface during Major Storm
event to the top of bank shall be provided for open channel conveyances.
Part 8 — Storm Sewer Design 8-22
6.8.5 Friction Factors (n)
Use Manning's roughness factors (n) set forth in Table 5-1 of HEC -22. The
design shall consider the channel roughness both immediately after
construction and when vegetation is fully established. Roughness factors,
which are representative of unmaintained channel conditions, shall be used for
the analysis of water surface profiles. Roughness factors, which are
representative of well-maintained channel conditions, shall be used to
determine maximum velocity.
6.8.6 Side Slopes
Side slopes shall be no steeper than 4H:1V for maintained grass -lined channels,
3H:1V for unmaintained native grass -lined channels and 2H:1V for riprap-lined
channels.
6.8.7 Maintenance Access
Provide maintenance access for inspection, mowing operations, and debris
removal by conventional equipment along the length of the conveyance
channel. The type of equipment needing access is dependent on the size of the
channel. Large channels will need access for dump trucks and loaders. For small
channels, foot or pick-up truck access may suffice. Channels may need to be
offset within the easement to facility maintenance.
6.8.8 Operation & Maintenance of Private Open Channels
A. Open channels require periodic maintenance. The degree of maintenance
is dependent on the location, the specific type of facility, and the liner
material (grass, rock, etc.).
B. Maintenance of open channels is required to insure the conveyance
capacity of the facility is maintained and that channel erosion does not
occur. The condition of open channels should be checked on a periodic
basis, especially after large storms or extended periods of high flow or
immediately following periods of high intensity winds (erosion may occur
during high flows, from scour caused by localized debris blockage or from
debris blown into the channel). Debris should be removed to prevent
channel plugging, channel scour and loss of channel conveyance. Erosion
shall be repaired or stabilized.
C. Vegetated channels shall be maintained to ensure that vegetation does not
limit the conveyance capacity of the facility. If conveyance restrictions are
apparent, the vegetation should be trimmed to restore capacity.
Part 8—Storm Sewer Design 8-23
D. Emergent vegetation (spirogyra, elodea, watercress, etc.) in conveyance
channels may also become a problem if it is allowed to constrict the
conveyance capacity of the facility. Vegetation above the ordinary high
water mark shall also be monitored primarily for its ability to retain bank
stability without reducing channel capacity at maximum design flows.
6.9 Culverts
Culverts shall be designed using the methods set forth in the Federal Highway
Administration (FHWA) Hydraulic Design Series No. 5 (HDS-5), "Hydraulic Design of
Highway Culverts", Publication No. FHWA-NHI-01-020 except as modified herein
(http://www.fhwa.dot.gov/engineering/hydraulics/pubs/12026/hif 12026.pdf)
6.9.1 Street Overtopping
Culverts shall be sized such that the depth of street overtopping is limited as
set forth in Table 8.12.
Table 8.12 — Allowable Street Overtopping Depths at Culvert Crossings
Street
Minor Storm
Major Storm
Classification
Six inches at the street crown. Residential dwellings
Local and
None
and public, commercial, and industrial buildings shall
Collector
not be inundated at the ground line unless flood -
proofed.
No overtopping allowed. Provide 1 -ft of clearance
Arterial
None
between the crown of the culvert and the water
surface elevation where practicable, for drainage
basins greater than one square miles.
6.9.2 Headwater Depth
A. The headwater (HW) depth shall be limited according to the following ratios
to diameter (D):
• For culverts with a cross sectional area less than or equal to 30 square
feet: HW/D <_1.5
• Culverts must also be sized without creating significant flow
constriction, such that existing channels upstream are not overtopped
during the design flow event.
6.9.3 Allowable Velocities
Part 8—Storm Sewer Design 8-24
A. Culverts shall be designed to maintain a minimum velocity of2.5
feet -per -second during the Minor Storm to prevent sediment accumulation
and shall be designed with a minimum slope of 0.5 percent, where
practicable.
B. Culverts shall be sized to limit velocities in order to minimize erosion
potential during the Major Storm Events. For exit velocities in excess of 10
feet -per -second during the Major Storm, energy dissipation, in addition to
erosion protection may be required. Design energy dissipation measures in
accordance with FHWA HEC -14, "Hydraulic Design of Energy Dissipaters for
Culverts and Channels"
(https://www.fhwa.dot.gov/engineering/hydraulics/pubs/06086/hec14.p
df)
6.10.4 Materials
A. Culverts shall be constructed of concrete, corrugated polyethylene pipe, or
polyvinyl chloride corrugated sewer pipe with a smooth interior. Efforts
should be made to eliminate corrugated steel pipe.
B. Culvert wall strengths and coatings shall be suitable for the soil conditions
design depths, and trench details. Culvert strength shall be designed
assuming HS -20 live load capacity unless unique conditions of the crossing
warrant a higher load capacity (i.e., Hs -25 or E-80).
C. When an abrasive bed load is anticipated or when velocities exceed 10 feet
per second, protective measures shall be implemented to limit pipe
damage. Corrosion, abrasion and other appropriate observations of field
culvert materials and be considered in determining appropriate culvert
materials and joint types. Corrosion resistance shall be evaluated based on
minimum resistivity, pH, sulfate content and chlorine content of the soil
and groundwater.
6.10.5 End Treatments
Culverts shall be designed with appropriate end treatments at their inlets and
outlets such as flared end sections, headwalls, or wingwalls to provide smooth
transitions to/from the drainage channel or ditch and to conform to
embankment slopes. In addition to the pipes, end treatments installed within
ditches/drains shall be fire -proof. Erosion protection or energy dissipaters shall
be provided as necessary to limit erosion due to turbulent flow and high
velocities. Depending on the culvert location, a safety grate or trash rack may
need to be installed.
6.10.6 Maintenance Access
Part 8 — Storm Sewer Design 8-25
Provide maintenance access to the upstream and downstream ends of
culverts for inspection and debris removal.
7. EROSION AND SEDIMENT CONTROL
7.1 Regulatory Requirements And Permit Coverage
Developer shall comply with all applicable state and federal requirements associated
with stormwater pollution preventions, including coverage under the States National
Pollution Discharge Elimination System Permit to Discharge Stormwater Association
with Construction Activities (NPDES Permit), when required.
7.2 Construction
Regardless of requirement for coverage under the NPDES Permit, construction activity
shall implement BMPs and good housekeeping practices to minimize impacts
including, but not limited to, erosion and sediment transport into public right-of-way
or onto adjoining property. Home builders/contractors are responsible for managing
BMPs on individual lots within a subdivision and/or master plan area and are required
to follow the requirements in the Notice of Intent (NOI) and Stormwater Pollution
Prevention Plan (SWPPP), when applicable.
7.3 Best Management Practices (Bmp)
Temporary erosion and sediment control BMPs may be selected, designed, and
installed using the methodology discussed in the most current edition of the Montana
Department of Transportation Erosion and Sediment Control Best Management
Practices Manual, available on MDT's website
(https://www.mdt.mt.gov/publications/docs/manuals/env/bmp-manual-jan15.PDF).
In addition, the Montana Department of Environmental Quality developed the Storm
Water Management During Construction Field Guide for Best Management Practices
reference document which may help in developing a BMP plan. Contact their office for
a copy of this document.
Part 8—Storm Sewer Design 8-26
Appendix A Preliminary Drainage Report
Appendix A— Preliminary Drainage Report App -A
The purpose of the preliminary drainage report is to describe and illustrate the preliminary
solutions to the drainage problems which may occur on-site and off-site as a result of the
development or any phase of the deve|opnnent. The drainage report shall be submitted
during the subdivision process with the application for Preliminary Plat.
Preliminary drainage reports shall provide anappropriate level ofdetail toaddress drainage
issues and present the overall plan for the property. The report shall be based on the
following outline and include appropriate background information, supporting data,
calculations and plan drawing(s).
1. Type ofReport (Concept)
2. Project Name
3. Preparedfor/hv
4. Date
S. P.E.Seal and Signature
INTRODUCTION
1. Location
a. City, County, State Highway and local streets within and adjacent tothe site, or
the area tobeserved bythe drainage improvements.
b. Names ofsurrounding developments, properties orlandmarks.
2. Description ofProperty
a. Area inacres
b. Ground cover (type ofground cover and vegetation)
c Existing land uses and known and foreseeable future land uses
d. Topographic features, steepness ofslopes
e. Major drainage ways and receiving channels
f. Existing drainage facilities
g. Flood Hazard Zones
h. Geologic Features (if applicable)
i Previous drainage studies for the property (if any)
3. Proposed Project Description
a. Land uses
b. Changes toexisting facilities
c Changes toMoodp|ains
d. Proposed system improvements
4. Drainage Criteria _
a. Minor and Major Storm Analysis
b. Geo1echnica|/Hydrogeo|ogica|Ana|ysis
Appendix x - Preliminary Drainage Report App -A
c. Hydrologic Methods
L Rainfall
ii. Design Storms
iii. Runoff methods and computer models
d. Hydraulic Methods
L Design standards
ii. Hydraulic models
iii. Detention Pond sizing
e. State or Federal Regulations (if applicable).
HISTORIC DRAINAGE SYSTEM
1. Major Basin Description
a. Reference to major drainage way planning studies such as flood hazard
delineation report, major drainage way planning reports, and flood insurance rate
maps.
b. Major basin drainage characteristics and structures, existing and planned land
uses within the basin.
c. Summary of off-site and on-site basin characteristics and runoff rates.
PROPOSED DRAINAGE SYSTEM
1. Design Concepts
a. Discussion of concept and typical drainage patterns.
b. Discussion of compliance with off-site runoff considerations.
c. Discussion of proposed drainage patterns and improvements including streets,
storm sewer, culverts, open channels and detention storage.
d. Discussion of the content of tables, charts, figures, plates, or drawings presented
in the report.
e. Discussion of geotechnical and hydrogeological impacts of development.
SUMMARY
1. Relation to off-site drainage features.
2. Summary of proposed improvements.
a. Storm sewer
b. Culverts
c. Open channels
d. Detention Storage
e. On-site and off-site impact and mitigation measures
3. Floodplain impacts.
4. State or Federal regulations.
5. Compliance with applicable regulations and standards.
REFERENCES
Appendix A—Preliminary Drainage Report App -A
Reference all criteria, master plans, and technical information used in support of concepts
and calculations.
APPENDICES Background Data
1. Floodplain maps
2. Applicable reports or report excerpts.
3. Key correspondence with adjacent property owners or utilities.
PRELIMINARY REPORT DRAWING CONTENTS
All drawings shall be submitted as back-up materials with the Preliminary Plat. A map shall
be provided in sufficient detail to identify drainage flows entering and leaving the
development and general drainage patterns. The map shall identify any major facilities from
the property (i.e., development, existing detention facilities, culverts, storm sewers) along
the flow path to the nearest major drainage way.
Floodplain Information: The location of the subject property shall be included with the
report. All major drainage ways shall have the floodplain defined and shown on the report
drawings.
Drainage Plan shall show the following:
1. Existing topographic contours at two (2) feet maximum intervals. The contours shall
extend a minimum of one -hundred (100) feet beyond the property lines.
2. All existing drainage facilities.
3. Approximate flooding limits based on available information.
4. Conceptual major drainage facilities including detention basins, storm sewers, swales,
riprap, and outlet structures in the detail consistent with the proposed development
plan.
5. Major drainage boundaries and sub -basin boundaries.
6. Any off-site features influencing development.
7. Proposed flow directions and, if available, proposed contours.
Appendix A— Preliminary Drainage Report App -A
Appendix B Final Drainage Report
Appendix B—Final Drainage Report App -B
The purpose of the Final Drainage Report is to present the final design details for the
drainage facilities discussed in the Preliminary Drainage Plan. Any changes to the
preliminary concept must be presented and fully explained.
Drainage plan shall provide an appropriate level of detail to address the drainage issues and
present sizing and locations for all proposed improvements. The report shall be based on
the following outline and include appropriate background information and supporting data
and calculations and plan drawing(s).
TITLE PAGE
1.
Type of Report (Final)
2.
Project Name
3.
Prepared for/by
4.
Date
5.
P.E. Seal and Signature
INTRODUCTION
1. Location
a. City, County, State Highway and local streets within and adjacent to the site, or
the area to be served by the drainage improvements.
b. Names of surrounding developments, properties or landmarks.
2. Description of Property
a. Area in acres
b. Ground cover (type of ground cover and vegetation)
C. Existing land uses and known and foreseeable future land uses
d. Topographic features, steepness of slopes
e. Major drainage ways and receiving channels
f. Major drainage ways and receiving channels
g. Existing drainage facilities
h. Flood Hazard Zones
i. Geologic Features (if applicable)
3. Previous drainage studies for the property (if any)
a. Proposed Project Description
b. Land uses
C. Changes to existing facilities
d. Changes to floodplains
e. Proposed system improvements
f. Right-of-way conveyance or acquisition required
4. Drainage Criteria
a. Application Standards or exceptions
b. Minor and Major Storm Frequencies
Appendix B — Final Drainage Report App -B
C. Hydrologic Methods
L Rainfall
ii. Design Storms
iii. Runoff methods and computer models
iv. Geotechnical/Hydrogeological Analysis (Attach Reports)
d. Hydraulic Methods
L Design standards
ii. Hydraulic models
iii. Detention Pond sizing
e. State or Federal Regulations (if applicable)
HISTORIC DRAINAGE SYSTEM
1. Major Basin Description
a. Reference to major drainage way planning studies such as flood hazard
delineation report, major drainage way planning reports, and flood insurance
rate maps.
b. Major basin drainage characteristics and structures, existing and planned land
uses within the basin.
C. Summary of off-site and on-site basin characteristics and runoff rates.
2. Sub -Basin Description
a. Discussions of historic drainage patterns of the property.
b. Discussion of off-site drainage flows and flow patterns and impact on
development under existing and fully developed basin conditions.
C. Summary of off-site and on-site basin characteristics and runoff rates.
PROPOSED DRAINAGE SYSTEM
1. Design Concepts
a. Discussion of minor and major drainage patterns, impacts, flows and volumes.
b. Discussion of compliance with off-site runoff considerations.
C. Discussion of proposed drainage patterns and improvements including streets,
storm sewer, culverts, open channels and detention storage.
d. Discussion of the tables, charts, figures, drawings, etc. presented in the report.
2. Design Details
a. Discussion of problems encountered and solutions at specific design points.
b. Discussion of detention storage and outlet design.
C. Discussion of maintenance and access aspects of the design.
d. Discussion of impacts of concentrating the flow on the downstream
properties
Appendix B —Final Drainage Report App -B
e. Summary of basin characteristics and runoff rates.
f. Discussion of geotechnical and hydrogeological impacts of development.
g. Discuss flooding hazards and describe minimum building elevations.
SUMMARY
1. Relation to off-site drainage features.
2. Summary of proposed improvements.
a. Storm sewer
b. Culverts
C. Open channels
d. Detention Storage
e. Geotechnical/Hydrologic impacts
f. On-site and off-site impacts and mitigation measures
3. Floodplain impacts.
4. State or Federal regulations.
5. Compliance with applicable regulations and standards.
REFERENCES
Reference all criteria, master plans, and technical information used in support of concepts
and calculations.
►110"i
1. Background Data
a. Floodplain maps.
b. Applicable reports or report excerpts.
C. Key correspondence with adjacent property owners or utilities.
2. Hydrologic Computations
a. Land uses regarding adjacent properties.
b. Soil types, coverage and loss coefficients
C. Proposed land uses for project by basin.
d. Time of concentration and runoff coefficients for each basin.
e. Basin parameters used for modeling including basin area, length, slope, distance
to centroid and routing elements.
f. Initial and major storm runoff at specific design points for off-site and on-site
flows.
g. Off-site, historic and fully developed runoff computations at specific design
points.
h. Hydrographs at critical design points.
Appendix B — Final Drainage Report App -B
Schematic diagram of hydrology model showing basins and routing elements
and combination elements.
3. Hydraulic Computations
a. Culvert Capacities and inlet and outlet protection.
b. Storm sewer capacity, including energy grade line (EGL) and hydraulic grade line
(HGL) elevations.
C. Gutter capacity as compared to allowable.
d. Storm inlet capacity including roughness coefficients, trickle channels,
freeboard, hydraulic grade line, and slope protection.
e. Check and/or channel drop placement.
f. Detention area volume capacity and outlet capacity calculations; depths of
detention basins, outlet configuration.
g. Downstream/outfall capacity to the Major Drainage way system.
4. Miscellaneous Information
a. Other documents relating to drainage conditions on the property.
b. Agreements with property owners or other agencies.
C. Permits, etc.
Appendix B — Final Drainage Report App -B
Appendix C Geotechnical/Hydrogeological Report
Appendix C—Geotechnical/Hydrogeological Report App -C
1. The evaluation shall include at a minimum:
a. A review of available geologic, hydrogeological, and topographic conditions to
identify any site conditions that could impact the use of the storm drainage
systems or the construction of sub -level structures. This review shall include all
available previous geotechnical engineering reports for the development.
Citations to possibly useful references are provided at the end of this appendix.
b. Where access to adjacent properties is unavailable, the project owner shall rely
upon the best known information for the area, supplemented with available
information, including any existing engineering reports or studies for sites in the
vicinity.
C. A surface and subsurface reconnaissance of the site and an inspection of
adjacent properties to assess potential impacts from the proposed stormwater
system and to verify that the conditions are consistent with the mapped
information.
d. The level of data for the hydrogeological assessment required will be dependent
on the amount of stormwater to be managed, the type of infiltration system
proposed, and the surface and subsurface soil conditions at the site. The
assessment will be conducted by a professional with experience collecting and
analyzing hydrogeological data.
e. An assessment of hydrogeological conditions that indicate the potential for
infiltrated stormwater to impact on- or off-site, facilities or structures. The
assessment will also demonstrate that impacts to groundwater elevation or
flow, resulting from the proposed infiltration system will be confined to the
property. A groundwater mounding calculation shall be provided to identify the
impacts of infiltrated stormwater runoff. An example calculation method and
spreadsheet is made available from the United States Geological Survey (USGS);
however, other approved, similar calculation methods may be accepted. This
information can be found at the following link:
https://pubs.usgs.gov/sir/2010/5102/
f. The Geotechnical/Hydrogeological report will contain the signed project
certification cover sheet found in Appendix G.
2. The Report Narrative shall include:
a. A brief project description including size, number of lots proposed, project
location (section, township and range), and background information relevant for
drainage design;
Appendix C — Geotechnical/Hydrogeological Report App -C
b. A discussion of the study investigations including methods and results of field
assessments, testing and analyses performed;
C. A description of the soil units and subsurface geologic conditions on the site and
in the vicinity of the site;
d. A description of the site including surface, soil, and groundwater conditions, etc.
3. Test Method Documentation shall include:
a. A map with the location of all subsurface field explorations, sampling locations
and any in- place field tests;
b. A description of the field test and any difficulties encountered during excavation
and testing;
C. A description of the equipment used to perform the field explorations or tests.
When applicable, describe the type of fabric lining and gravel backfill used;
d. Logs of subsurface borings shall identify the depth to groundwater, the presence
of any limiting layers and the target soil layer; include test pit or excavation
dimensions. Borings intended to characterize hydrogeologic conditions for
infiltrations systems should extend a minimum of 10 -feet below the base of the
proposed infiltration system, or a minimum of 25 -feet below the ground surface,
whichever is deeper;
e. Report test data documenting any infiltration testing, calculations, results
problems encountered; and,
f. A description of the condition of any existing facilities being tested, noting any
silt build-up, water level, connections to other structures (including distance to
inverts of any interconnecting pipes), measured depths and dimensions, etc.
4. Results of field and laboratory testing conducted, including the grain size analysis
represented both graphically and in tabular format;
5. A summary of field testing conducted and the measured and proposed design
infiltration rates for infiltration systems. Approved test methods for infiltration testing
are found in Appendix H;
6. Results of the sub -level structure feasibility study and a summary of the property
boundary and down -gradient analysis as applicable; and,
Appendix C — Geotechnical/Hydrogeological Report App -C
7. A geologic cross-section of the stormwater disposal area drawn to scale, with the
proposed stormwater disposal facilities superimposed on the cross-section. All
relevant geologic units shall be clearly identified including the target disposal layer
and limiting layers.
8. Conclusions and recommendations.
a. The Site Plan shall include:
b. Project boundaries (including all existing and proposed property lines);
C. Labeled topographic contours, extending beyond the project and drainage
basin. Projects in an urban area shall use a maximum contour spacing of 1 foot;
d. Location of the soil and geologic units identified;
e. Location of significant structures, properties or geologic features on site and in
the project vicinity;
f. Location of existing natural or constructed drainage features on site and in the
project vicinity; and,
g. Location of proposed site infrastructure including roadways and drainage
features such as ponds, drywells, etc.
SUGGESTED SOURCES:
• Montana Ground Water Information Center Database: http://mbmggwic.mtech.edu/
• Lopez, D.A., and Sims, M., 2003, Areas of potential swelling -clay hazard in the Billings area,
Yellowstone County, Montana: Montana Bureau of Mines and Geology Geologic Map 61D,
1 sheet, scale 1:48,000.
• Lopez, D.A., 2002, Geologic map of the Billings area, Yellowstone County, Montana:
Montana Bureau of Mines and Geology Geologic Map 61A, 1 sheet, scale 1:48,000.
• Lopez, D.A., 2000, Geologic map of the Billings 30'x 60' quadrangle, Montana: Montana
Bureau of Mines and Geology Geologic Map 59, 1 sheet, scale 1:100,000.
• Olson, J.L., and Reiten, J.C., 2002, Hydrogeology of the west Billings area: Impacts of
land -use changes on water resources: Montana Bureau of Mines and Geology Report of
Investigation 10, 32 p., 2 sheets.
• Olson, J.L., and Reiten, J.C., 2001, Basic hydrogeologic data for the West -Billings area
Appendix C — Geotechnical/Hydrogeological Report App -C
(1999-2000), Yellowstone County, Montana: Montana Bureau of Mines and Geology
Open -File Report 436, 110 p. United States Geological Survey (USG5). Scientific
Investigations Report 2010-5102. Simulation of Groundwater Mounding Beneath
Hypothetical 5Lornnvvater Infiltration Basins. Glen B. Carleton.
Appendix C — Geotechnical/Hydrogeological Report App -C
Appendix D Operations and Maintenance
Requirements
Appendix D — Operations and Maintenance Requirements App -D
An Operations and Maintenance Manuol is required for Subdivision and Commercial
Property development. The O&M Manual summarizes the tasks required for perpetual
maintenance to ensure the proper operation ofstnrrnvvaterfacilities. The [)&K4 manual
shall include at a minimum:
a Contact information for the party responsible for O&M.
e Description of the maintenance tasks to be performed and their frequency.
* An inspection checklist to be used for annual maintenance. Template forms found in
Appendix G.
• List ofthe expected design life and replacement schedule ofeach component.
mSite plan showing the overall layout ofthe development.
wCopy ofrecorded HOA Agreement and SIA, ifapplicable.
° Other information asnecessary.
The O&M Manual shall first be submitted to the City's Environmental Affairs Division for
review and comment. After acceptance by the Environmental Affairs Division, the O&M
Manual shall be recorded at the Yellowstone Clerk and Recorders Office in a format
acceptable tothem.
Anpenmxo-overouo^ and Maintenance Requirements App -D
Appendix E HOA Agreement Requirements
Appendix E — HOA Agreement Requirements App -E
HOMEOWNERS' ASSOCIATIONS REQUIREMENTS
For stormwater systems within subdivisions, a homeowner's association (HOA) shall be
formed to maintain and operate the facilities.
A draft copy of the SIA and/or CC&Rs for the HOA in charge of operating and maintaining
the facilities associated with the stormwater system shall be submitted at the time of
Preliminary Plat submittal. Final copies are required at the time of initial Private Contract
Submittal. The SIA/CC&Rs shall summarize the maintenance and fiscal responsibilities of
the HOA. In addition, the SIA/CC&R's shall state that any proposed changes to the
stormwater system/facilities shall first be approved by the City Engineer's Office. The O&M
manual shall also be submitted at this time. A financial plan is required in order to provide
the entity responsible for maintenance with guidance in regard to financial planning for
maintenance and replacement costs. The financial plan shall include the following items:
A list of all stormwater-related facilities and their expected date of replacement and
associated replacement costs.
® Sinking fund calculations that take into consideration probable inflation over the life of
the infrastructure and estimates the funds that need to be set aside annually.
A mechanism for initiating and sustaining the sinking fund account demonstrating that
perpetual maintenance of all facilities associated with the stormwater system will be
sustained.
Homeowners' associations are to be non-profit organizations. A standard business license
is not acceptable for this purpose. The HOA shall remain in good standing with the
requirements of the State of Montana. Developer shall sign HOA Agreement stating
ownership and responsibilities prior to approval of development.
Appendix E — HOA Agreement Requirements App -E