HomeMy WebLinkAboutPublic Works Committee Minutes 02.26.2024The Public Works Committee meeting was called to order at 6:40pm on Monday, February 26, 2024, by Committee Chair, Heidi Sparks. Members Present: Heidi Sparks- Chair, Iry Wilke- Vice -Chair, Jodi Mackay, Jessica Banks, Emelie Eaton Others Present: Matt Wheeler- Public Works Director, Ryan Welsh- KLJ Public Input: General Items Approval of Minutes from January 22, 2024. Iry Wilke made a motion to approve the minutes. Motion was seconded by Jodi Mackay. Motion carried 5-0 to approve the minutes. New Business 2. Emergency Call Out Report- Report attached i. More calls this month than all year and mostly water related- 13 -hour overtime situation with a water main break KLJ Report- Report attached i. 5"' to 7t" Sewer Line replacement will be funded by a grant being applied for ii. Splash Park- contractor will be here on March 10th to start construction completion iii. Public Works rules/regulations updates- KLJ have completed the review and updates Old Business: Other Items 4. Matt stated the new school is going in without infrastructure being considered but wants to be annexed into the city, with the city paying for the infrastructure needed for annexation. Annexation application should be coming before the council within the next month. 5. West Railroad- Matt stated that the state has reached out to the city to determine how the city would like to proceed, based on the increase of the cost involved. Project has been put on hold until the state hears back from the city. Ryan mentioned that the city could go after a federal RAYS grant, which is for transportation and infrastructure. 6. Becky at KLJ is working on a $2.5 million planning and design grant for the water tank funding. This grant would be through EDA. Meeting adjourned at 7:40pm lEmergency Overtime r 12TO 6/3012024 1x Maintenance Shop 406-628-4773 City Dispatch 406-628-8737 Response Code X In Column Not accepting Overtime /NA = Not Available /Y = Responding /B=Phone Busy Employee Name Shop Callout Brian Kline Kevin Budge Jay Hatton Keith Guy Wade Spalinger Telephone 1 1-6 1 1-6 1-7 NAI 2 3 11FNA4 1-13 1-13 1-14 1-15 1-16 28 -Jan NAI NA -1 9 8 NA2 NA2 NA2 Y9 NA4 3 A5 5 Aaron Fox A6 6 Brandon Gonzales j4WN Troy Clifton A7 7 Joel Barnhardt Y8 8 Water and Sewer Callout-6 1-6 1-7 Justin BakerY4 3 na3 Kevin Hoffman 4 y3 2 nal NA5 4 NA6 5 NA7 6 Y8 7 1-13 1-13 1-14 1-15 1-16 1-28 1-28 2-4 2-4 y4 3 3 Y3 2 NA2 I nal na2 NA2 Y2 1 NAI Y4 Daniel Nauman 40 F 1 nal nal nal nal NA1 NA -1 Y4 Y4 3 Tom Burwell 40 2 y4 y4 3 y4 Y4 Y4 3 NA31 2 Elm Lift Station 628-7773 Village Lift Station 628-5918 Wastewater Treatment Plaut -628-6474 Dial 9 after tone to acknowledge alarm I Autodailer- 628-4866 Response Code NO= In 1 st Column Not accepting Overtime / NA = Not Available / Y = Responding Employee Telephone Thomas Henry 4 Cindy Caswell 4 Corey Nicholson 4 Norman Stamper 40 Water Treatment Plant 628-4410 Response Code NO= In 1st Column Not accepting Overtime / NA = Not Available / Y = Responding Employee Telephone HP Nuernberger Dylan Ceaser 40 40 Josh Sawyer 40 Sam Waggoner 40 Joe Waggoner 406 - TJ Worbel 406 - Daniel Waggoner 406 - CABLE TV down Tim Johnson 698-6254 Matt Wheeler Cell# 208-1885 10ne Call Locate - 1-800-424-5555 (City Job # 25663) Kurt Markegard Cell# 860-5785 Hm 208-2356 ISCHESSLER 628-4221 HESTON 281-0811 NW ENERGY 1-800-896-7862 LUMPY 406-860-7890 Advanced Pump 406-586-1700 lCentury Link 1-800-573-1311 Shop 628-7707Jeff 694-9097 GORDAN ACE ELECTRIC 406-860-5464 NorthwestPipe 252-0142 - Larry E. 656-2856 MDU 1-800-638-3278 / MDT 252-4138 Pace Construction 252-5559 (sewer backups) MDT Supervisor Tom 655-7903/Kyle 446-2622 San itarySystemOverflows call DEQ withing 24 hours at406-444-3080 Call Out - Date and Incident Location 1-7 Sanding Sheets 1-6 Water leak 1-23 Water Break more help 1-28 Water Break Main Street 1-6 Emergency Locate 2-4 NO WATER RUSSEL 1-13 Structure Fire 2-4 MORE HELP 1-13 Elm Lift Station Alarm 1-14 H2O shut off 1-15 H2O shut off 1-16 Emergency Locate 1-28 Water Break Main Street Reason for Project: Existing City water Tank needs to be recoated on the inside and can't happen until City has a backup storage supply. They also have needs for upgrades to their upper pressure zones. See previously approved Water System PER and City of Laurel CIP. This project looks at funding opportunities and provides grant writing services from multiple sources Project Scope: To research funding alternatives, create packages for submittal, and assist City in finding monies for completing the future water tank and upper pressure zone improvements for the City of Laurel Current Status: ® Task Order Signed by City on 12/13%23 • Met with EDA to discuss Funding on 1/9/24 ® Letter of Support from CHS Received e Wood's Manufacturing and Love's to Provide LOS's. 5th to 71h Sewer Line Replacement (KLJ # 2304-01231) Reason for Proiect: Refurbishment of an 8" sewer line between 7th Avenue and 61h Avenue and a 10" sewer line between 6th Avenue and 5th Avenue in the alley way between 11t Street and Main Street in Laurel, Montana. The existing sewer line experienced several collapses last year. Proiect Scope: To replace approximately 363 lineal feet of 8" and 383 lineal feet of 10" and will include the update of 3 manholes and associated surface replacement. Current Status: ® Work Order Signed by City in September 2023 m Survey scheduled for week of October 16th, 2023 ® Base Drawing created and Working on preliminary design ® Preliminary Plans and EEOC sent to City on 12.14.23 ® DEQ Submittal package sent to City on 2.9.24 Splash Park Installation (KLJ #2204-01898) Reason for Project: To Replace the existing pool with a splash pad recreation area. Page 1 of 3 ENGINEERING, REIMAGINED City of Laurel Project Status Update February 10, 2024 Proiect Scope: To Construct a splash Pad at the site of the existing City pool. Current Status: • Work Order Signed by City in January 2023 • DPHHS Approved Permit on 5.25.2023 • Preconstruction Meeting held on 9.15.2023 • Construction to start on Monday 9.18.2023 • Change order sent to Contractor on 10.30.2023 ® Change Order Executed on 1.02.2024 m Construction to restart 3.10.2024 • Ultimate completion date of 4.28.2024 Reason for Project: KU has been retained to provide City of Laurel planning services as needed. Proiect Scope: Planning services may include; subdivision, zoning, development, floodplain hazard management, miscellaneous reviews and other related work. KU will prepare staff reports, recommendations, and attend meetings upon request. Current Status: ® Zoning Regulations Update. o Draft regulations sent to City April 111h, 2023 o Zoning Map approved by Commission on August 161h, 2023 o Staff Recommendation to Zoning Commission to occur on December 20th, 2023 o Back to Planning Board Meeting on 1/17/23 o City to publish advertisement for Public Hearing o Public Hearing to occur 3.12.24 ® Downtown Parking Study. — On hold per City Instructions ® City -County Grown Policy Update was requested at the August 16th meeting o Weekly meetings occurring in October. o KU updating maps as requested by City Planner o Back to Planning board meeting on 1.17.24 o Work Session occurred on 1.31.24 o Public Hearing at Planning Board 2.21.24 Page 2 of 3 ENGINEERING, REIMAGINED Other potential projects have been identified during recent conversations between City staff and KIJ. City Public Works staff and KU task leaders meet monthly to discuss current and future projects. As these are tentative, the timing and extent of KU's services are TBD, unless noted otherwise. Anticipated FY24 Projects 1 716Street reconstruction —Onhold until Town Pump completes renovations I RiverfrnntPark walking trail —OnHold Until further notice 3. Downtown ParkingStudy—Tuprngnessfolioeingzuningcompletiun 4. Overlay of 121h Street between Valley Drive and 11t Ave. Task Order sent to City. a. Handrivesisunder contract tocomplete. S. Bulk Water Sales Station — pushed back to2O25 Page 9of3 ENGINEERING, Rc|MAG|mEo