Loading...
HomeMy WebLinkAboutDNRC DEPARTMENT OF NATURAL RESOURCES 'tip a,1-4--,... AND CONSERVATION Y,:/ ..rte CC mb, li 6 T 9) BRIAN SCHWEITZER, GOVERNOR SOUTHERN LAND OFFICE _ _ - = to O W_ -:;,,z - STATE OF MQJ r r_. ' -. ") _ � � � t 1, , � ILI •� �' . PHONE: FAX: (406 ) 247 247 -4400 ~ �AII 1 SINESS PARK ) 247 -4410 3 ; IMTOP DRIVE j L AUG 4 2011 BI _ MT591051978 I � 3 August 2011 CITY OF LAUREL The Montana Department of Natural Resources and Conservation (DNRC) is beginning the process of completing an Environmental Assessment (EA) on Public Trust land that is located between the low water marks of the Yellowstone River in the SW %SW% of Section 15, Township 2 South, Range 24 East in Yellowstone County. ExxonMobil Pipeline Company has applied for a Temporary Construction License from the State in order to install a new section of 12" diameter pipeline for the Silvertip Pipeline, in advance of an Easement application. The proposed section of pipeline will be installed by Horizontal Directional Drilling beneath the bed of the Yellowstone River. The pipeline is proposed to be at least 42' below the existing riverbed, with the majority of the pipeline exceeding 48' below the bed of the Yellowstone River. The DNRC Southern Land Office is currently conducting an analysis under the Montana Environmental Policy Act (MEPA) of the impacts that may occur as a result of issuing the proposed license and easement. DNRC is accepting comments on the proposed request to issue a Temporary Construction License and Easement for the relocated Silvertip Pipeline. If you have comments they will be accepted until 5 p.m. on Wednesday, 17 August 2011 and can be sent to: Jeff Bol -l-man, AreaPlanner DNRC Southern Land Office 1371 Rimtop Drive Billings, MT 59105 jbollman@mt.gov Questions regarding the proposed project can be directed to Jeff Bollman at ibollman @mt.gov or (406) 247 -4404.