HomeMy WebLinkAboutDepartment of Labor & Industry (2) State of Montana
Department of Labor & Industry
Brian Schweitzer,Governor
Em to meet Relations Division Labor Standards Bureau
Wage&Hour Unit
o y
'I- I(I�,, InI M Ir��
U E U E
Nov 3 2009
November 2, 2009
CITY OF LAUREL
Dear Interested Party,
A public hearing on the proposed 2010 Montana building construction, heavy construction,
highway construction, and nonconstruction services prevailing wage and benefit rates will be
held on November 23, 2009 at 1:30 p.m. in the first floor conference room (room 104), 1327
Lockey Avenue, Walt Sullivan Building, Helena, MT.
A copy of the public hearing notice is enclosed with this letter. The proposed rates can be found
on the internet by going to: httg://mtwagehourbor)a.com and choosing the "Click here for
Prevailing Wage Rates" located in the 4th paragraph of the text. If you would like a copy of the
preliminary rates mailed to you, please call (406) 444-1741. You may also e-mail me at:
mikesmith @ mt.00v.
If you no longer want to be on the "Interested Parties" list to receive notices of hearings and new
rates, please call or e-mail me.
Sincerely,
Michael Smith
Statistician
enc.
Phone(406)444-5600 Fax(406)444-7071 P.O Box 6518
TDD(406,444-5549 "An Equal Opportunity Employer" Helena,MT 59604-6518
a
-1840-
BEFORE THE DEPARTMENT OF LABOR AND INDUSTRY
STATE OF MONTANA
In the matter of the amendment of ) NOTICE OF PUBLIC HEARING ON
ARM 24.17.127 related to prevailing ) PROPOSED AMENDMENT
wage rates for public works projects - )
building construction services, heavy ) Q ry
construction services, highway ) _r
construction services, and )
nonconstruction services ) NOV 3 2009
TO: All Concerned Persons CITY OF LAUREL
1. On November 23,2009,_at 1:30-p.m., :the Department-of.Labor an
Industry (department) will hold a public hearing to be held in the first floor conference
room (room 104), 1327 Lockey Avenue, Walt Sullivan Building, Helena, Montana, to
consider the proposed amendment of the above-stated rule.
2. The department will make reasonable accommodations for persons with
disabilities who wish to participate in this public hearing or need an alternative
accessible format of this notice. If you require an accommodation, contact the
department no later than 5:00 p.m., on November 17, 2009, to advise us of the
nature of the accommodation that you need. Please contact the Labor Standards
Bureau, Employment Relations Division, Department of Labor and Industry, Attn:
Mike Smith, P.O. Box 6518, Helena, MT 59604-6518; telephone (406) 444-1741;
fax (406) 444-7071; TDD (406) 444-0532; or e-mail MikeSmith@mt.gov.
3. The rule proposed to be amended provides as follows, stricken material
interlined, new material underlined:
24.17.127 ADOPTION F STANDARD PREVAILING RATE OF WAGES
(1) remains the same.
(a) A notice of proposed adoption of the commissioner's determination is
published in the Montana Administrative Register 30 a1212roximatgjy 45 to 46 60 days
prior to adoption according to regular publication dates scheduled in ARM 1.2.419.
(b) through (1)(d) remain the same.
(e) The current building construction services rates are contained in the 2W9
2010 version of "The State of Montana Prevailing Wage Rates - Building
Construction Services" publication.
(f) The current nonconstruction services rates are contained in the 24"2010
version of "The State of Montana Prevailing Wage Rates - Nonconstruction
Services" publication.
(g) The current heavy and highway construction services rates are contained
in the 2999 Feymsed 2010 version of "The State of Montana Prevailing Wage Rates -
Heavy and High_a Construction Services" publication.
MAR Notice No. 24-17-238 20-10/29/09
-1841-
h The current highway construction services rates are contained in the
2010 version of "The State of Montana Prevailing-Wage Rates_- Highway
Construction Services" publication.
(2) The commissioner maintains a mailing list of interested persons and
agencies. A copy of any notice, proposed rate of wages, adopted rates, wagl is or
other information are distributed to each addressee. All others may obtain a copy or
be included on the mailing list upon request to the ,
AyeRwe,-Helena, ""T 596GI address listed in (3). Copies of adopted wage ra es are
available at reproduction cost for a period of five years following their effectiv date.
(3) The standard prevailing rates of wages publications are heMby ad pted
and incorporated by reference. Copies of the rates are available upon request from
the Labor Standards Bureau, Employment Relations Division, Department of abor
and Industry, 1805 Prospect Avenue, P.O. Box 201503, Helena, MT 59620-1 03,
(406) 444-1741, or on-line at hftp://erd.dii.mt.gov/laborstandard/prevwage/State.asp
or www.mtwagehourbopa.com.
AUTH: 2-4-307, 18-2-409, 18-2-431, 39 2, MCA
IMP: 18-2-401, 18-2-402, 18-2-403, 18-2-406, 18-2-411, 18-2-412, 18-2-413
18-2-414, 18-2-415, 18-2-422, 18-2-431, MCA
4. The department believes there is reasonable necessity to amend ARM
24.17.127 to update the various prevailing wage rates. Payment of prevailinc wage
rates is required in most public works contracts by 18-2-422, MCA. The depz rtment
is proposing the rates at this time following completion of its wage surveys, in order
to have as current a set of rates as is feasible. The proposed wage rates will apply
to public works projects let for bid on or after the effective date of the rate changes.
The department emphasizes that the proposed rates for building construction
services and nonconstruction services are based upon survey responses an
applicable collective bargaining agreements. The methodology for surveys a d rate
computations is described in ARM 24.17.121. The department relies upon the
information provided by employers and labor organizations during the survey
__._._.process_to set the proposed.rates.. The final..rates.are.based.-up-on the prelim nary:--- . .-
rates, as modified by including any relevant information provided during the public
comment period.
There is reasonable necessity to provide for separate publications of the heavy
construction rates from the highway construction rates, in that various rate users
have expressed confusion regarding the distinction between the two batches of
rates. The department believes that by separating heavy construction rates from
highway construction rates, workers, construction companies, and government
agencies are more likely to use the correct rates for the bidding process, and that
proper wage rates will be paid on public works projects. The rates for heavy
construction and for highway construction are based upon the Davis-Bacon Act rates
adopted for Montana by the federal government, rather than based upon a
department survey. The adoption by reference of federal rates is provided for by
20-10/29/09 MAR Notice No. 2 -17-238
A
a -1842-
18-2-414 (2)(a), MCA. The department believes that republication of those rates in
its own rate publication is more convenient for its customers than merely citing a
reference to a federal rate publication, and more likely to lead to the use of the
correct rate by the affected parties.
There is also reasonable necessity to update the correct contact address information
in paragraph (2) and to make minor grammatical changes in (3) while the rule is
otherwise being amended. In addition, there is reasonable necessity to update the
language in paragraph (1)(a) to more accurately reflect the department's recent
experience with how long it takes to take final action following publication of
proposed rate changes.
Finally, there is reasonable necessity to amend the IMP citations to the rule to reflect
the enactment of Chap. 277,_Laws of 2009-(Senat-e-Bill 308)-.and the--statutory
changes contained in the legislation, and correctly reflect the codification of the
statutes which are being implemented by the rule. There also is reasonable
necessity to amend the AUTH citations to delete the reference to an inappropriate
statutory reference while the rule is otherwise being amended.
5. A copy of the proposed 2010 publications, identified as "preliminary
building construction rates", "preliminary heavy construction rates", "preliminary
highway construction rates", and "preliminary nonconstruction rates", are available
and can be accessed on-line via the internet at: www.mtwagehourbopa.com.
6. A printed version of the proposed 2010 publications is also available by
contacting Mike Smith, at the address, e-mail, or telephone numbers listed in
paragraph 2 of this notice.
7. Concerned persons may present their data, views, or arguments, either
orally or in writing, at the hearing. Written data, views, or arguments may also be
submitted to: Labor Standards Bureau, Employment Relations Division, Department
of Labor and Industry, Attn: Mike Smith, P.O. Box 6518, Helena, MT 59604-6518;
fax (406) 444-7071; TDD (406) 444-0532; or e-mailed to MikeSmith @ mt.gov, and
must be received no later than 5:00 p.m., November 30, 2009.
8. An electronic copy of this Notice of Public Hearing is available through the
department's web site at http://dIi.mt.gov/events/calendar.asp, under the Calendar of
Events, Administrative Rules Hearings Section. The department strives to make the
electronic copy of this Notice of Public Hearing conform to the official version of the
Notice, as printed in the Montana Administrative Register, but advises all concerned
persons that in the event of a discrepancy between the official printed text of the
Notice and the electronic version of the Notice, only the official printed text will be
considered. In addition, although the department strives to keep its web site
accessible at all times, concerned persons should be aware that the web site may
be unavailable during some periods, due to system maintenance or technical
problems, and that a person's difficulties in sending an e-mail do not excuse late
submission of comments.
MAR Notice No. 24-17-238 20-10/29/09
-1843-
9. The department maintains a list of interested persons who wish to raceive
notices of rulemaking actions proposed by this agency. Persons who wish to have
their name added to the list shall make a written request that includes the name, e-
mail, and mailing address of the person to receive notices and specifies for ich
program or areas of law the person wishes to receive notices. Notices will be sent
by e-mail unless a mailing preference is noted in the request. Such written request
may be mailed or delivered to the Department of Labor and Industry, attention: Mark
Cadwallader, 1327 Lockey Avenue, P.O. Box 1728, Helena, Montana 59624 1728,
faxed to the department at (406) 444-1394, e-mailed to mcadwallader@ mt.g v, or
may be made by completing a request form at any rules hearing held by the agency.
10. The bill sponsor contact requirements of 2-4-302, MCA, apply anc have
been fulfilled. The bill's primary sponsor was contacted telephonically on Jura 17,
2009.
11. The department's Hearings Bureau has been designated to presic a over
and conduct this hearing.
/s/ MARK CADWALLADER /s/ KEITH KELLY
Mark Cadwallader Keith Kelly, Commissioner
Alternate Rule Reviewer DEPARTMENT OF LABOR AND INDUSTRY
Certified to the Secretary of State October 19, 2009
20-10/29/09 MAR Notice No. 2 -17-238