Loading...
HomeMy WebLinkAboutPark Committee Minutes 09.23.1993V9 • PARK COMMITTEE SEPT. 23, 1993 5:00 P.M. TO 6:25 P.M. • ATTENDING: Gay Easton, Jim Flisrand, Emelie Eaton, Lon Kellogg, Bill Brennan, Donna Kilpatrick, Others: Dick Potter, Laurel American Legion Team rep., Mayor Chuck Rodgers, Dave Michael, Peggy Schram Potter presented the financial report for the 1993 summer concession sales of the Laurel Litttle League and the American Legion teams. There was $177736 in total sales and $5,440.67 in profit.fuz ---h . A balance sheet is attached. Permission was granted to locate a van (much like the back of a SchW*& truck) in the area near the batting cage in Athletic Field. The van and the old concession stand will be painted in the same color other buildings in the park are painted. The painting will be done in an Eagle Scout project being completed by Mark Potter. Some new bleachers may also be constructed. A drainage problem exists near the area of the concession stand. Dave will look-into a possible solution. Water from heavy rains drain from the baseball field into the concession stand. Ken Tolliver is interested in moving along with the development of the park in Alder Ridge Subdivision. A sale or lease of a portion of the park would need an election because the park is dedicated. Donna will talk to Cal concerning the development. A written plan is needed for whatever Tolliver is intending to do. Sprinkler systems are in the process of being installed in the triangle parks. The sidewalk is being replaced in the park at the Washington and East First. St. and a sprinkler system installed. A problem exists with groups moving into parks and using them for practice etc. without first seeking permission. The parks are in demand and some system has be used in order to prevent damage to the turf. In the future we will try to educate the schools and organizations in order to have them approach the park committee with their Xb practice plans. V ' 4o,,? Discussion was held on repairing the swimming pool. Major repair is needed to repair leaks in the circulating system. Dave and Jim will be get an estimate cost figure for the repair. Kids riding their three-wheelers in South Pond is a problem. We need to check to see if we can restrict motorized vehicles in that area. We will also check to see about getting ties from the railroad in order to outline a road. Howard Guenthner's group is interested in raising funds to improve the park area. Res ectively sub ittgd, Donna G. Kilpatricl?_"_' chairman. 0 9999-01 LAUREL BASEBALL CONCESSION STAND Prepared by /93 working Trial Balance Reviewed by AM For the period ended December 31, 1993 Page 1 Prior Period Unadjusted Balance Trial Balance Adjustments Balance Sheet Account # Account Name 12/31/92 Dr (Cr) Ref # Dr (Cr) Dr (Cr) Comments 101 CHANGE FUND 75 150.00 AJE-1 (75.00) AJE-3 (75.00) 102 CASH IN BANK 310 1,121.38 AJE-2 4.65 1,126.03 305 FUND BALANCE 4,180 (385.36) (385.36) 311 DISTRIBUTION - LEGION 2,350.00 2,350.00 312 DISTRIBUTION - LITTLE LEG 2,350.00 -------- --------------- --- ------ ----- - 2,350.00 ------------ - -- ------ 4,565 5,586.02 (145.35) 5,440.67 (4,565) (5,586.02) ------------ ---------------- --- ----------- - - 5,440.67 --------------- -- -- 0 0.00 (145.35) 0.00 E 0 9999-01 LAUREL BASEBALL CONCESSION STAND Prepared by /93 Working Trial Balance Reviewed by 5 AM For the period ended December 31, 1993 Page 2 Prior Period Unadjusted Balance Trial Balance Adjustments Income Statement Account --------- # ---- Account Name ---------------------- 12/31/92 Dr (Cr) Ref # --------------------------------------------------- Dr (Cr) -------------- Dr (Cr) -----=---------------- Comments ------ - 401 SALES (15,359) (17,886.19) AJE-1 75.00 AJE-3 75.00 (17,736.19) 501 PURCHASES 9,125 12,164.91 12,164.91 S ?. 620 FIELD MAINTENANCE 1,330 ? ?. lay a 650 MISCELLANEOUS 339 30.00 AJE-2 (4.65) 25.35 660 SUPPLIES 105.26 ---------------- ---------------- ---- ------------ 105.26 (4,565) (5,586.02) - 145.35 --------------- (5,440.67) 4,565 5,586.02 ---------------- ---------------- ---- ------------ - 5,440.67 --- - --------- 0 0.00 145.35 0.00 lie lie