Loading...
HomeMy WebLinkAboutPark Committee Minutes 12.23.1993 PARK COMMITTEE DECEMBER 23.1993 5:02 p.m.; adjourned 6:03 p.m. ATTENDING: Gay Easton, Emelie Eaton, Peggy Schram, Dave Michael, Donna Kilpatrick, chairman OTHERS: Darrell Thompson, Thompson Pools Darrell Thompson reported on the evaluation he had made of our present pool. He said that due to water loss, the pool is filled eight times a season. We are using 60 bags of filter media when we should be using 15 bags and a problem exists in the circulation of the pool. There currently is 8 inlets into the pool, Thompson recommends 20. Estimates to repair the pool include: $43,000 to $45,000 for a plastic-type liner that is applied to the existing wall; $45,000-$47,000 for a new gutter system; $70,000 for a stainless steel insert. Totally we are looking at 5120,000 to $150,000. A sand filter system 100, would be $8,000 and a twin-tank sand filter system would be $14,500. Some work is going to have to be done this year on the deck regardless of what we do with the pool itself. Another problem some day will be the drain in the bottom of the pool. Repectively submitted, Donna G. Kilpatrick 1 ] r -'