Loading...
HomeMy WebLinkAboutCommittee of the Whole Minutes 08.06.1996MINUTES CITY COUNCIL COMMITTEE OF THE WHOLE AUGUST 6, 1996 6:30 P.M. COUNCIL CHAMBERS MEMBER PRESENT: Chairman- Chuck Rodgers Ron Marshall Gay Easton Dirk Kroll Donna Kilpatrick Miles Walton Bud Johnson OTHERS PRESENT: V. Joe Leckie Jim Flisrand Andy Loebe Dave Michael Don Hackmann Rick Musson Mike reported that he had driven over Railroad Street today and it seems to be in pretty good shape with the exception of a few rough areas. There will be a lot of traffic going over this road when the underpass is closed down for repairs. He suggested that the street crew look this over before the heavy traffic starts. Ron wanted to know if we are assured that the trench for the telephone project on First Street will be properly filled and patched. Jim said that he met with the construction company today and they will start repairing the street Thursday and they will lay asphalt the entire length of the trench. Discussion regarding the picnic tables at the picnic shelter. Apparently different groups move them out, but sometimes they don't put them back. Jim distributed and reviewed the DPW Update of 8-6-96. Rick reported that they have been patrolling the areas where transients congregate. There still is a problem, but the number of transients seem to be down. This may be due to increased patrolling. Chuck said that the officers have been doing a good job the past 7 or 8 days. Chuck reported that there are a couple of parties who are interested in doing some sub-dividing around Laurel. They will contact the City in the near future. Their main interest is water. One area has 47 homesites and another area about 130 homesites. The meeting was adjourned at 6:43 p.m. Respectfully submitted, Don Hackmann 40 City Clerk FROM: TO: r DATE: SUBJECT Jim Flisrand, Director of Public Works Mayor and City Council August 6, 1996 Public Works- UPDATE STREET & ALLEY 1. Pothole patching. 2. Sign replacement as needed. 3. Street repair throughout area. 4. Sweeping program in progress with sweeping district being swept Tuesdays and Thursdays. PARKS & CEMETERY 1. Equipment, building and ground maintenance continuing throughout the parks, cemetery maintenance, as needed. WATER & SEWER 1. Plants continuing with normal treatment and maintenance activities. 2. Water Improvements Project continuing with final design. 3. Bridge project has begun. SOLID WASTE 1. Proceeding with collection and container site operation as required. Container site has been completed except for asphalt work and placement of building. 2. Excessive down time with older garbage trucks. 3. A few complaints have been issued regarding paying at the container site. We will look at allowing all local businesses and contractors to charge to eliminate money handling. ADMINISTRATION 1. Construction planning and building activity is typical of this time of the year. 2. Jim Martin finished salvaging material from his property on E. First Street and has now obtained the necessary forms to request a demolition permit.