Loading...
HomeMy WebLinkAboutCommittee of the Whole Minutes 03.19.1996MINUTES CITY COUNCIL COMMITTEE OF THE WHOLE MARCH 19, 1996 6:30 P.M. COUNCIL CHAMBERS MEMBERS PRESENT: Chairman- Chuck Rodgers Ron Marshall Chuck Dickerson Dirk Kroll Gay Easton Donna Kilpatrick John Minch ,Miles Walton Bud Johnson OTHERS PRESENT: V. Joe Leckie D.L. McGillen Mike Atkinson Jim Flisrand Andy Loebe Vicki Metzger Dave Michael Don Hackmann Jim Flisrand distributed and alcohol policy and procedures requirement, which has to be testing can be done. The Ci North Dakota to do the random testing program. reviewed a proposed anti-drug and for CDL drivers. This is a federal adopted by the Council, before any ty has contracted with Ad-Med from selecting and administration of the Jim will provide more information to the Council members before adopting a resolution on April 2nd. The DPW Update of 3-19-96 was reviewed. Dirk mentioned that he has had complaints about the water in the underpass. Jim said that it may not be until late summer before the state will get the problem resolved. Ron mentioned that he misunderstood the motion on March 5th to add an office/meeting room at the water plant and will ask to change his vote to "no" during the regular council meeting. The meeting was adjourned at 6:57 p.m. i Respectfully submitted, Don Hackmann City Clerk r. . C. 0 0 FROM: Jim Flisrand, Director of Public Works TO: Mayor and City Council DATE: March 19, 1996 SUBJECT: Public Works- UPDATE STREET & ALLEY 1. Continuing our street maintenance programs including pothole patching. 2. Sign replacement as needed. 3. Crack sealed as weather permits. 4. Alternating between sanding and sweeping depending on weather. PARKS & CEMETERY 1. Equipment, building and ground maintenance continuing throughout the parks, cemetery maintenance, as needed. WATER & SEWER 1. Meter replacement and testing program. 2. Plants continuing with normal treatment and maintenance activities. 3. Water Improvements Project continuing with final design. 4. Emergency intake lines are being installed. Shipment of pipe, fittings and weather has slowed the process. The emergency temporary line is installed to allow installation of primary water lines. Currently having difficulty sealing the dike against the intake pier. SOLID WASTE 1. Proceeding with collection and container site operation as required. Winter maintenance being done. Considerable maintenance required on used garbage trucks this year. ADMINISTRATION 1. Building activity is continuing, with increased commercial interest. 2. Engineering, Inc. is preparing additional options for Street & Alley meeting on March 21, 1996. To move ahead with the SID, decisions relating to reduced improvements and/or increased assessments to each property may be necessary. 3. Prepared final Anti-Drug and Alcohol Testing and Procedures Policy for CDL employees.