Bob Graham reported that he received a call from a lady who lives
in the 600 block on 7th Avenue and she said some people moved in
over there around the Eastlick-Hill house area and last year they
let the weeds grow and she never said anything. But this year
because of the rainfall, it's a "jungle". She wants the City to do
something about the weeds.
Discussion regarding weeds at 1112 First Avenue and on West Twelfth
Street.
Ron mentioned that there was a Public Utilities committee meeting
last week but the minutes were not prepared for tonight.
Donna said that she noticed the weeds were cut at the old Wold
place around the apartment building. Discussion regarding weeds in
the road and sidewalk.
Gay reported that he has had a lot of complaints about water in the
underpass. Jim will address this during the report on the street
and alley committee minutes tonight.
John complimented Lonnie Kellogg about his letter to the editor to
the Laurel Outlook and the Billings Gazette regarding the transient
problem. Lonnie said that the letter also went to the Carbon
County News, Stillwater News, Powell and Cody.
Lonnie felt that, because of the weather, we haven't had the
transient problem like last year. Maybe that will change as the
season goes on.
Maybe our efforts and the railroad's additional security is
discouraging them.
Dave met with the highway maintenance Chief out of Billings. He
was over at the underpass, and he stopped and talked with him.
They are looking at the possibility of putting in a sump pump until
the water level goes down.
IP?'?
Chuck Dickerson asked Jim if the grass in Thomson Park is going to
be cut before the 4th of July?
Jim thought that it would be. Chuck said that it wasn't cut before
Memorial Day week-end and wanted to make sure it was cut before the
4th of July activities.
Jim distributed and reviewed the DPW Update of 6-20-95. Jim
reported that the state and Cenex through combined efforts will be
renovating the underpass drain. Consultants have been selected to
design a new drain.
Chuck Rodgers reported that we are closer to balancing the 1995-96
preliminary budget. A couple more sessions should do it.
Department Heads have done a fine effort.
Bob Graham mentioned that they have entered negotiations with the
City Union for wages. They have had one meeting and the second
will be held this Thursday at 1:00 p.m.
The meeting was adjourned at 6:41 p.m.
is
Respectfully submitted,
Don Hackmann
City Clerk
11
.t
•
FROM: Jim Flisrand, Director of Public Works
TO: Mayor and City Council
DATE: June 20, 1995
SUBJECT: Public Works- UPDATE
STREET & ALLEY
1. Continuing our street maintenance programs including pothole
patching, sweeping.
2. Drying beds at the sewer plant have been excavated and shaped
and are ready for the contractor to pave. Paving is planned
for the week of June 25th.
PARKS & CEMETERY
1. Equipment, building and ground maintenance continuing
throughout the parks, cemetery maintenance, as needed.
2. Swimming pool opened the week of June 11th with a good
participation from the public.
WATER & SEWER
1. Continuing meter replacement and testing program.
2. Plants continuing with normal treatment and maintenance
activities.
3. Jet rodding problem areas.
4. Water Improvements Project continuing with preliminary
engineering and collection of field data.
5. Installing sprinkler system at library. Equipment failure and
weather has delayed the process. Approximately 30% complete.
SOLID WASTE
1. Proceeding with collection and container site operation as
required.
2. Waiting for response from Solid Waste bureau on our landfill
situation. Final report was submitted May 10, 1995.
ADMINISTRATION
1. Building activity is heavy compared to previous years.
2. Continue work with each division on scheduling of work,
coordination and individual responsibilities.
3. Safety meetings & training are continuing with monthly
meetings and/or individual direction.
4. Finalizing budget proposal for all Public Works Depts.