Loading...
HomeMy WebLinkAboutCommittee of the Whole Minutes 09.21.1993 • MINUTES CITY COUNCIL COMMITTEE OF THE WHOLE SEPTEMBER 21, 1993 6:30 P.M. COUNCIL CHAMBERS MEMBERS PRESENT: Chairman- Chuck Rodgers Norman Orr Albert Ehrlick Gay Easton Donna Kilpatrick Lonnie Kellogg OTHERS PRESENT: Dave Michael John Rosenberg Vicki Metzger Don Hackmann Peggy Schram L.D. Collins and Bob Graham will not be here tonight. Lonnie mentioned that pranksters have turned the street sign around at Locust and Main. Lonnie also mentioned that when the Council votes on Ordinance No. 1080 tonight, he will abstain, due to a conflict of interest. • Discussion regarding South 5th and the resolution on the agenda tonight regarding a utility easement for a water line. Discussion regarding the work that needs to be done at Spruce Grove. Peggy and Dave have been surveying the street and they will make some recommendations. Dave said that they will get together with the street and alley committee. Albert mentioned that something should be done with the acoustics in the new Council Chambers. It is really hard to understand and hear what people are saying. Donna reported that the Herbstfest Committee would like to put a flat bed truck at the corner of West First Street and First Avenue on Saturday. Gay reported that he has had many phone calls regarding Spruce Grove. They are concerned about fire protection and ambulance calls. There is a need for another access/exit to their area. This work needs to get done as soon as possible. Peggy and Dave need to get more preliminary work completed and review it with the Street and Alley Committee and then make some recommendations. Discussion regarding drainage in this area also. Dave reported that last week and then today again, the County and State have been installing equipment for selling and renewing car licenses. They plan to be up and running by October 5th. The remodeling is just about complete in the Engineering/Building department. q? The intake pier at the Water Plant is being prepared for winter. Work is continuing on a design for the container site. The Sewer Plant drying beds still need a little more work. Peggy reported that the triangular park on Washington and Idaho, and East 1st is trenched out and ready for the sprinkler system installation. Chuck said that hopefully they will get two more small parks done by spring. The material has been purchased for these three parks. Next fall we will try to do the same for other parks. Chuck said that we still need to consider a drying bed for the jet rodder. We need to find a place to build one. We can't put it in with the other ones at the Sewer Plant. Discussion regarding the old building that Don Meyers helped the City purchase out of Lewistown. landfill, but it was never ut u This was suppose to be for the buying it, but there are noP an P. There is a party interested in put the building together. Not all of the pieces r seem toabeathere . It is a Butler building specifically designed for Lewistown. The meeting was adjourned at 6:49 p.m. Respectfully submitted, Don Hackmann City Clerk