Loading...
HomeMy WebLinkAboutBudget/Finance Committee Minutes 05.03.1994MINUTES BUDGET/FINANCE COMMITTEE MAY 3, 1994 4:15 P.M. CITY HALL MEMBERS PRESENT: Chairman- Donna Kilpatrick Ron Marshall Gay Easton Don Hackmann OTHERS PRESENT: Mike Atkinson Dave Michael The Committee received an additional bill for Olsen Construction for painting at the FAP. (see attached) The Committee.did not know exactly what had been done and referred the bill to the Building Committee for review. The Committee reviewed the April claims and recommended that they be paid. One new vendor was approved. Purchase requisitions were approved as follows: General Fund 6 X 4 reducer and bolt packs (pool) Sand blasted ladder and chairs (pool) Install power steering on Tender ##1 Hair strainer (pool) 1994 LMC Update Treasurer's bond TAC maintenance agreement at FAP Fire line tape, spanners, faceshields, lite boxes, freight, for Fire Dept. SCBA Repairs State Gas Tax Fund Culvert for alley and corner of Alder and East 1st Street Capital Projects Fund- Fire Truck 300 gal. aluminum skid unit Water Fund 5/16 packing and gasket material Light bulbs and flood lights Remove winter suction line from pier Engineering fees for analyzing Water Plant and system for clear well and chemical feed, EPA and State mandate Drum of Calgon Cat Floc & Polymer $ 243.00 230.00 846.88 1,235.00 654.74 350.00 425.00 499.89 1,238.50 691.00 12,018.00 271.00 445.00 300.00 3,311.00 455.00 s Sewer Fund Wastewater permit fee Manhole covers and adjustment rings Diaphragm and clamp for air sludge pump Annual users fee for Wastewater Treatment Plant Check and service Bobcat loader Testing of soil materials dumped at container site with jet rodder as directed by the State. Solid Waste Fund 15W40 motor oil Two Hwy 120OR20 tires (G-2) 15 wind rings Task 6A soil sampling and analysis Dumping fees for month of March at the Billings landfill Repair front end of rear packing garbage truck Sweeping Pickup broom (SD-2) is The meeting was adjourned at 4:46 p.m. Respectfully submitted, q?4?? Don Hackmann City Clerk $ 250.00 597.00 364.00 2,286.00 421.00 1,440.00 226.00 802.00 330.00 1,609.00 3,597.00 1,374.00 270.00 0 Olsen Construction 24o8 Lackawanna « Laurel, MT 59044 « (406) 628-4983 Company Name: CITY OF LAUREL (FAP COMPLEX) Date: MAY 03 1994 Address: 217 WEST FIRST ST. City, State: LAUREL, MT. Phone: (406)-628-8737 WORK ORDER AND BID PROPOSAL Description Specifications Cost Price FINAL BILL F R ADDITIONAL WORK DONE AT ABO FArTT.Tm T FIRE DEPT: NORTH WALL IN DRILL ROOM 5'x351-'=177-t2FT. DORMITORY RESTROOM 2 COATS=3962FT. EAST WALL IN CHIEF OFFICE 82'x16'=136-FT. RS, WINDOWS,& FRAMES 25@ 212FT.PER. POLICE DEPT. SOUTH WALL IN SQUAD ROOM 8'x21'=1682FT. MEN'S RESTROOM STALL WOMEN'S RESTROOM STALL `DOORS, WINDOWS,& FRAMES 22@ 212FT. PER. .12 21.30 .12 142.56 .12 16.32 8.00 ea. 200.00 .12 1 20.16 8.00 ea. 1 176.00 WEIGHT ROOM IN F RE DEPT. WAS REMOVED FROM CON RACT; 612':FT._73,44 GRAND TOTAL