Loading...
HomeMy WebLinkAboutCommittee of the Whole Minutes 03.17.1992 0 MINUTES CITY COUNCIL OCMMITTEE OF THE WHOLE Date Time _Ma_rch 17, 1992 6,1n m. Place of Meeting _Council Chamber Members present: Chairman-Chuck Rodgers Ron Marshall Norman Orr Albert Ehrlick Gay Easton Donna Kilpatrick L.D. Collins Bob Graham Lonnie Kellogg Others present: Dave Michael Jim Worthington Dave Slavmaker- Vicki Metzger Don Hackmann Albert Ehrlick received a call from Hank Hard.inq who wanted to know if he could rent the land designated as a park in Badger Square. Discussion. Someone will check with Cal Cumin. Jim Worthington reported that the Agreement with Cenex Transportation will be delayed. until the next council meeting on April 7th. L.D. Collins said that all the council people should, talk to everybody they can regarding this wash system that Cenex is proposing. He had talked to some of the engineers in Billings and the City is not allowing any more of these hookups and, they have had alot of trouble with them in the past. There are several checmicals that can be washed out and absolutely kill our digesters. Jim also .mentioned. that he has talked with Jerry Burns, the engineer for the State of Montana Water Quality Bureau., who is checking on this and he will give a report to Jim by Thursday. Dave Michael reported on a solid. waste workshop that he attended last week in Billings. They are getting public comment to write the regulations for solid waste management in the State of Montana. Their basic guidelines are source reduction, re-use, recycling, composting, incineration, and. landfill. There is a recommendation for the 25% reduction in garbage. Ron Marshall was approached by the manager of Town Pump and thev would like to change the policy of serving beer with a meal to just be able to serve drinks anytime without having to is buy a meal. Ron checked. with Joe Bradlev and he said that they would probably not have to go back to the City/County Planning Board but they would have to come to the City Council for approval. r-. J Page 2 Committee of the Whole meeting of March 17, 1992 Ron is not sure at this time if they will pursue this change or not. Bob Graham reported on a garbage committee meeting held at the transfer site last night. There are apparently two problems up there: 1. The big containers are down in a hole to where we have to drop them and customers back up and drop their garbage in them. The containers are getting banged around, dented up, etc.. Dave is getting some material from Park City that will help that problem until we get the transfer site built. 2. The actual location of the transfer site and how it is to be constructed. Bob felt it was better to have the whole committee up there to see first hand the problems we are facing. Bob says that looking to the future he can see where the Council is going to be facing quite a bit of an expense to get 40 the transfer site on line. It is going to cost more than originally anticipated, due to what OSHA and EPA require. The meeting was adjourned at 6:50 p.m. Respectfully submitted, Don Hackmann City Clerk 0