HomeMy WebLinkAboutPublic Works Committee Minutes 04.13.2009MINUTES
PUBLIC WORKS COMMITTEE
APRIL 13TH, 2009 5:30 P.M.
COUNCIL CHAMBERS
MEMBERS PRESENT
MEMBERS ABSENT:
OTHERS PRESENT
Public Input: None
Chairman Mark Mace
Dave Siljestrom
Chuck Rodgers
Norman Orr
Emelie Eaton, Troy Kelsey, Norman Stamper, Bill Kampfer
Kurt Markegard
Kelly Rhoads
Crosswalk at Gay Easton Bridge:
The Public Works Committee is going to make a recommendation to the City Council that a
crosswalk be put in at the bridge. Kurt stated that signs would need to be put up. Kurt stated
that possibly four signs would be needed. Two signs would state crosswalk ahead, and they
would need to be placed prior to the crosswalk on both sides. Two other signs that state
crosswalk with an arrow pointing down would need to be placed at the crosswalk, on both
sides also. Kurt stated that a decorative rock could be placed at the bank beside the bridge to
keep the kids off. Mark asked Kurt if the city would be able to paint the lines. Kurt stated that
the street fund has enough money to fund this, and is a project that needs to be done. Kurt
stated the cost of the signs, paint and installation would be about $2000.00. Chuck Rodgers
made a motion to recommend to the council that a crosswalk be put in at the bridge. Dave
Siljestrom seconded the motion. Motion carried 5-0. Mark stated that he will notify the county
that we are recommending to the council that a crosswalk be put in. The crosswalk and signs
will be put in on a county road, so Mark is going to ask them if they will help out with the
costs. Mark hopes to bring information from the county to the next meeting, and then the
Public Works Committee can make the recommendation.
Snow Removal Routes:
Chuck Rodgers made maps of the emergency routes that the Emergency Services Committee
recommends and then there was discussion. The maps were made of existing and possible
new snow routes. Kurt stated that all crosswalks, First Avenue and high traffic areas are done
when ever it snows with sand and ice melt. If snow accumulates four to five inches they will
plow those streets. Streets are plowed when snow drifts. Open areas, like around the parks,
Cottonwood, Juniper, and Locust, Milwaukee and Maryland drift when it snows and the wind
blows. Kurt mentioned that he has a meeting with Stefan Streeter on April 14, 2009, to
discuss the state snow routes. Kurt explained that First Avenue and Main Street are state
roads. Kurt stated that these roads need to be plowed. If the state does not start plowing, then
the city is going to have to start. Kurt stated that meeting with Stefan, should get this problem
solved, even if the state starts paying the city to plow. Kurt stated that after the meeting with
Stefan he would bring new or changed routes to the next meeting.
Street Maintenance Repair Program:
Kurt stated that the City of Laurel is going to advertise in this week's paper for a request for a
proposal for pothole repair, chip sealing and crack sealing repair. Kurt explained that between
Main Street and East Maryland to Yard Office Road will be chip sealed to extend the life of
the road. These roads were done a few years ago, and the city wants them to be maintained.
Kurt stated that millings are going to be put on Alder Avenue and then be bladed flat. Roads
in Iron Horse Subdivision will be chip sealed to extend the life of the pavement. Kurt stated
that East First Street, Colorado, Wyoming, Montana, and Pennsylvania will get chip sealed to
preserve pavement. Kurt stated the only street on the south side that could be chip sealed is
West Avenue. Kurt mentioned that pothole and crack repair could be done to other streets on
the south side. Kurt stated that he would like to see South Fifth Ave, Woodland and
Yellowstone paved. Those streets would have to be done at a later date. Kurt stated that East
Main Street, South First Avenue and Eighth Avenue will be paved. West Maryland, Twelfth
Street have been chip sealed and East Ninth Street will be chip sealed. Kurt stated that
Beartooth Drive will get pothole and crack repair, and then chip sealed. Kurt explained that in
future years we can keep chip sealing the streets that will be fixed this year by crack sealing
and pothole repair to preserve streets that have been fixed.
The meeting was adjourned at 6:45 p.m.
Respe lly submitted,
/'- / ?' , X/7 Kelly s
Utility Bi ing Clerk