Loading...
HomeMy WebLinkAboutBudget/Finance Committee Minutes 02.02.1992• BUDGET/FINANCE COMMITTEE Date Feb. 2 1992 Time 4:3L2---m- Place of Meeting City Hall MEMBERS PRESENT: Chairman- Donna Kilpatrick Chuck Rodgers Bob Gauthier Norman Orr Ron Marshall Don Hackmann OTHER'S PRESENT: Dave Michael A quorum (3 or more) present, the following action was taken by the Committee: The Committee reviewed the January claims and recommended that they be paid. The Committee reviewed and approved new vendors. Purchase requisitions were approved as follows: • General Fund 1992-93 Annotation update subscription for $ 250.00 City Court 1991 W-2 program modification 650.00 Repair PC computer at FAP 400.00 Flag light and installation at Library 280.00 Repair parts for firemen's pagers 239.62 Repair transmission on police car 695.00 Lumber to repair picnic tables 238.00 Repair outlets in pole barn 339.32 Police Training Fund 6 bullet proof vests for police reserve $1,244.95 Water Fund 1 drum Calgon-Cat Floc Polymer $ 455.00 Microbiology & fluoride tests for quarter ending 12-31-91 234.00 Miller wire feed welder 1,350.00 3 - 150# chlorine cylinders & rental 214.00 2- 12" fire hydrant extensions 474.00 • 12- repair clamps 1,330.00 10- curb boxes, fittings for water leak at E. 4th St., teflon tape 452.00 Service connection fee for 1991-92 2,267 @ $2.25 5,101.00 3 test holes for bridge project 210.00 Page 2 Budget/Finance meeting of February 4, 1992 • Sewer Fund 2- manhole rings & covers $ 320.00 PVC pipe and fittings to repair gas piping in digester building 238.00 Sidewinder nozzles 205.05 Solid Waste Fund Repair drive line (G-2) transfer truck 858.00 Scale weights on garbage trucks to Blgs. Landfill 228.00 Dumping fees for landfill for the month of December 2,084.00 Discussed financing the balance due on the new fire trucks (see attached). As soon as the exact amount for financing is known, Don will get bids from the local banks. The committee recommended budget transfers effective on. 1-31-92. This will be done by resolution on February 18th. • Don checked further regarding the AT&T pro-watts program. After talking with Rudy Torrez from AT&T, the estimated savings would be approximately $50.00 a year on long distance calls. However, there would be seperate bills from AT&T on each phone number, thereby creating twice as much paperwork every month when processing phone bills. The committee felt that the added paperwork did not justify the savings. Discussion regarding setting up a cash reserve account in the water fund for repair and/or a new water reservoir. This really needs to be done. A new paint job inside and outside would be approximately $200,000 and there is not money currently set aside for this work. A new reservoir will be needed in the future at an estimated cost of two million dollars. We should have some matching money available for a possible grant. Hopefully down the road the Big Sky dividend program will have grant money available to assist in obtaining a reservoir and the necessary water lines to go along with it. The committee recommended to set up a reservoir cash account in the water fund and transfer $30,000 from the operating cash and then transfer $2,500 a month beginning in February. The meeting was adjourned at 5:15 p.m. Respectfully submitted, Don Hackmann City Clerk • Fire Truck 3-5-91 Bid Price - Becker Fire Equipment $206,870 Amount paid 11-8-91 <92,045> $114,825 Cash on Hand 1-31-92 <89,330> Balance to finance (approximately) $ 25,495 Interest Est. @ 8?% - loan dated 3-1-92 1992-93 (163 days) 5,495 + 968 = 61463 Due 8-10-92 1993-94 10,000 + 1,700= 11,700 Due 8-10-93 1994-95 10,000 + 850 = 10,850 Due 8-10-94 Outstanding General Fund Loans (Long Term Debt) Air Packs @8.9% $6,534 Due 8-10-92 High Band Radios @8.45% $11,363 Due 1-20-93 Suggestion When transfering money to capital projects fund- Fire Department in the next 3 fiscal years, deduct the amount of loan.payment (example: $15,000 less $6,463 = $8,537 to be transferred in 1992-93) ?" V- °T _ 0 ------------------------------ _- - - -------------