Loading...
HomeMy WebLinkAboutBudget/Finance Committee Minutes 06.02.1992E BUDGET FINANCE COMMITTEE Date Jun 2 1992 Time 4:?0 pAm. Place of Meeting --.City Hall LI MEMBERS PRESENT: Chairman- Donna Kilpatrick Don Hackmann Norman Orr L.D..Collins OTHER'S PRESENT: Dave Michael A quorum (3 or more) present, the following action was taken by the Committee: The Committee reviewed the May claims and recommended paying them, except for a.bill to US West in the amount of $343.62. This bill was for Cable repair and should have been sent to the City's liability insurance carrier (MMIA). This was for cable damage at 5th Avenue and Railroad Street. One new vendor was approved. Purchase requisitions were approved as follows: General Fund Police Training Fund Sign Material Video training for firefighters 10 cases computer paper 10m swim passes Repair pump and motor for swim pool Repair transmission on grader (S-1) Annual hose test - Fire Dept. Fire hose adapters for engine #4 Fire hose adapters and misc. equipment for new engine #4 Concrete for shop floor Starter and cable for (S-10) Chevy dump truck $ 200.90 1,400.00 481.25 275.00 1,134.00 3,003.00 600.00 552.63 661.46 573.00 205.00 230.00 Officer Fischer's basic fee Capital Projects Fund- Thomson Park Project 10 trees 747.00 3 concrete picnic tables 880.00 r Page 2 Budget and Finance meeting of June 2, 1992 • Water Fund Redwood and supplies to build covers for openings on intake pier $ 307.00 Montana Rural Water Systems membership dues 200.00 Operators certification renewal for 1992-93 for 12 operators 360.00 Curb stops and curb boxes 1,471.00 Valve and caps for water line project on Wyoming Avenue 218.00 Liquid alum 1,307.00 Polymer calgon - cat. 455.00 Repair heads on water van 319.00 Sewer Fund Operators certification renewal for 1992-93 for 6 operators 180.00 600' hose for jet rodder 2,425.00 Lawn mower 375.00 Trouble shoot and repair motor control- Digester building 910.00 0 Solid Waste Fund 4 - 12 X 24 tarps for Rolloff truck 280.00 Dump fees for Billings Landfill for April 3,157.00 Weights on garbage trucks to Billings Landfill 389.00 Snow Removal Fund 1/3 repair costs on Road Grader/Snow plow transmission (2/3 to Street Dept.) 1,501.00 The meeting was adjourned at 5:06 p.m. Respectfully submitted, 9?4?? Don Hackmann City Clerk L J