HomeMy WebLinkAboutPublic Works Committee Minutes 09.11.2000 MINUTES
PUBLIC WORKS COMMITTEE
SEPTEMBER 11, 2000 7:00 P.M.
COUNCIL CHAMBERS
MEMBERS PRESENT:
Chairman Gay Easton
Gary Temple
Bill Staudinger
Mark Mace
OTHERS PRESENT:
Larry McCann
Laura Dietz
Jeanette Koch
Laura Dietz: Driveway approach at 1101 Cherry Hill.~
This unscheduled matter was considered at the beginning of the meeting.
Laura Dietz and her husband are building a house at 1101 Cherry Hills Drive and the closing
date is set for the end of September. They have built a three-car garage, but city ordinance only
allows for a two-car driveway approach. Since the curb is a rollover curb, they would prefer to
have their driveway approach the same width as the three-car garage.
Larry explained that the ordinance should not be changed, but they could apply for a variance
and seek council approval for the three-car driveway approach.
Motion by Gary_ Temple to grant a variance, subject to the approval of the City Council, as so
stated in the ordinance, seconded by Bill Staudinger. Motion carried.
Speed bump on Beartooth Drive
The resident that requested the speed bump on Beartooth Drive was not present at the meeting.
Larry explained that the speed bump would be located on Beartooth off 12th Street. The negative
aspects of installing a speed bump need to be considered. These include increased noise and
quick stops when approaching and increased speeds when leaving the speed bump.
Water and sewer lines on 8th Avenue
The 8th Avenue Project is still in the design stage. The Montana Department of Transportation
has confirmed that they will replace the storm sewer lines but will not replace water and sewer
lines unless they are in conflict with the street. They want the City of Laurel to hire an engineer
to determine where the conflicts are located.
Engineering, Inc., is the state's contract engineer for the 8th Avenue Project. Larry asked them to
quote a price to determine the conflicts and des~n it for future flows. The quote for the
engineering for the water and sewer lines from 9 Street to Main Street on 8th Avenue was
$15,984. Since this amount was not budgeted, it would come out of the water reserves.
Conflicts would be found in areas where the soil could not be compacted without deep
excavation below the lines. Larry estimated a cost of $400,000 to replace the water and sewer
lines on 8th Avenue. Since the soils on 8th Avenue are bad and deep excavation would be
required to install a base in the street, Larry hopes that 60 to 70% conflict would result from the
design issue. The 8th Avenue Project is set for 2003, but the $400,000 needed for the water and
sewer lines would set it back to about 2010.
Gay stated that we need to proceed with the study, and Mark stated that the road would not last
another ten years.
Larry mentioned that the Department of Transportation informed him that urban money could
not be used for water and sewer lines. Gay suggested getting a legal opinion regarding this.
Motion by Gary_ Temple to have the engineering study completed with $15,984 from the
reserves, seconded by Bill Staudinger. Motion carried.
Gay stated that this recommendation would be presented to the city council.
Thomae - Abandon alley on 7m Street
Paul Thomae, who was not present at the meeting, requested alley vacation at 8th Avenue and 7th
Street. Montana Power Company and Montana-Dakota Utilities require no easements at this
location, and Larry did not anticipate any reason for the city to need this alley. If the easement
were granted, it would become the driveway area of the two fourplexes that Mr. Thomae plans to
build.
Gary stated that the issue regarding Mr. Thomae's responsibility for the condition of the street by
his local business is connected to this request. Gay disagreed and stated that these are two
separate issues. Further discussion followed.
Motion by Gary Temple to approve the request for alley vacation at 8th Avenue and 7th Street, at
a cost of $2,300 for the alley footage, seconded by Bill Staudinger. Motion carried, with Gary
Temple voting no.
Sewer rates
Larry McCann distributed information regarding the history of sewer rate increases within the
city.
The 2000-2001 Final Budget included a projected 15% increase in rates in order to balance the
budget. However, this 15% increase does not allow for scheduled maintenance and/or system
repairs. Reserves, system development and interest monies have been used to balance past
budgets. This has depleted monies that should be available for maintenance and repair, as well
as the reserves necessary to replace major items and complete upgrades of the plant.
Replacement and depreciation reserves are $95,110.86. Reserves monies are set aside to replace
major items and to offset costs of upgrades to the system. System development funds are
collected from individuals that tap into the system. This fund should he used for upgrades in
2
pipe sizes when developers need to extend the collection lines. System development monies are
$86,350.60. Interest is earned from the reserve and system development funds, and this money
should be going back into the fund that earned it.
The plant, which is now seventeen years old, will require an upgrade in the very near future in
order to comply with regulations and to handle higher flows caused by growth of the cry.
The proposed budget included $231,800 for normal maintenance of the plant and distribution
system, but this amount was cut in order to balance the budget. The budget did not include the
estimated $150,000 necessary to replace the lines on South 1 st Avenue.
Larry stated that, in order for the sewer revenue to become solvent and to maintain the system, a
58% rate increase is needed. The 58% increase would not recover losses in reserve accounts and
would not include inflation costs.
The committee discussed the situation at length. Public notification and a public hearing would
be necessary.
Motion by Gary Temple to recommend a 58% sewer rate increase to the council effective in the
year 2000, with a 10% increase in subsequent years of 2001-2007, seconded by Mark Mace.
The committee had further discussion on the matter.
Motion carried, with Bill Staudinger voting no.
Water line replacement - Hazel Avenue
Larry stated that the crew started the water line replacement project on Hazel Avenue today, and
the project should he completed by Wednesday or Thursday. The line has been repaired six
times in the last two months. Because of this project, only one person will be reading meters this
week.
Unscheduled matters
FEMA Flood Program
Steve Klotz will be asking citizens to serve on a flood mitigation planning effort. CRies must
now have a flood mitigation plan in place before getting loans and grants from FEMA.
Motor home in Firemen's Park
Gary stated that a motor home was parked in Firemen's Park during the Sunflower Jamboree.
Larry will take steps to prevent this from reoccurring.
Permanent inspectors during street proiects
Janet Johnson recently questioned why a permanent inspector was not present during the street
projects that were completed behind the FAP Building and at 5th Avenue. Larry stated that the
3
compaction requirements were met and necessary inspections were done, but the city does not
have the money to hire a permanent inspector for these projects.
Casa Linda proiect
Mark questioned the status of the cttrb and gutter replacement project for the Casa Linda
residents. Larry stated that the city does not have the money for this project. The committee
discussed the 10% administrative cost and 7% interest that could be applied to this project.
Motion by Mark Mace to have a meeting with the Casa Linda residents to discuss the 7% interest
charge, the 10% administrative cost, and the completion of the project as planned, seconded by
Gary Temple. Motion carded.
The meeting adjourned at 8:00 p.m.
Respectfully submitted,
Cindy Allen
Council Secretary