Loading...
HomeMy WebLinkAboutBudget/Finance Committee Minutes 10.27.1992 BUDGET/FINANCE COMMITTEE Date Oct. 27, 1992 Time 4:30 p.m. Place of Meeting _City Hall MEMBERS PRESENT: Chairman- Donna Kilpatrick Bob Gauthier Don Hackmann L.D. Collins Ron Marshall Bob Graham OTHER'S PRESENT: -Steve Suazo and Jeff Melvgin, CSA Ken Mosby and Walt Mosby, ABS Sharon Herman A quorum (3 or more) present, the following action was taken by the Committee: The purpose of this meeting was to open computer bids. Six bid specifications were mailed out and only two bids were received. One bid spec. was returned because the address forwarding time had expired. Before the bids were opened, Don announced that the bid bond requirement that we normally use was inadvertantly left out of the bid specs, however it was included in the newspaper advertisement. In checking with the City Attorney he said that since we are only opening the bids and not awarding it to anyone, the successful bidder would be allowed to submit a bid bond before the council awards the bid on 11-4-92. This was acceptable to everyone present, including both vendors represented at this meeting. Both bids were opened and a copy distributed to everyone. (See attached for a cost comparison and evaluation points.) CSA said that they misunderstood the conversion requirement and quoted prices for all new software. Their adjusted bid was still higher than the other bid received. The conversion requirement is to convert our existing programs and data over to the new system. The only new programs we are requesting bids for is payroll, word processing and spread sheet. CSA has a one year "Depot Maintenance" warranty on all of their hardware. ABS has a 2 year on-site warranty on the NCR/AT&T hardware and a 1 year factory warranty,on the other hardware. Page 2 Budget/Finance Committee meeting of October 27, 1992 • CSA will not maintain our existing software. ABS will maintain all of our software. Bid evaluations were completed by each member of the committee and Sharon. This was done by assigning points to eight different catagories. The results are shown on the attached bid tabulation sheet. Motion by Bob Graham, seconded by L.D. Collins to recommend that the bid be awarded to Applied Business Systems, Inc. in the amount of $28,995.00. Motion carried 6--0. NOTE: CSA included a cashiers check bid bond with their bid which they took back with them when they left the meeting. The bid bond from ABS was received on 10-30-92. The meeting was adjourned at 5:52 p.m. E Respectfully submitted, Don Hackmann City Clerk L.I COMPUTER SYSTEM BID OPENING: October 27, 1992 4:30 p.m. HARDWARE Equipment : (h., Delivery: Installation: Total Hardware: SOFTWARE Operating System: Compiler: Required Applications: Total Software: TRAINING CONVERSION TOTAL SYSTEM COST HARDWARE MAINTENANCE(on-site per mo.) SOFTWARE MAINTENANCE(per month) EVALUATION POINTS ASSIGNED BID TABULATION h&1 ecl 6 us; VENDORS C--P&,4-tr 54+4vA,---) I4sspC.:N•4n c KTS/VAL CON A B S C jr A GRIZZLY BYTES BIG SKY DATA SYS '}-Lb l7 737r /4, 6 9 vb d ; S`7 ???C /`f yo )7 7S-r- 6, 7? ? 99,E 1?9? g 9s ? 178 .sv 637 ..3 Z ;;z 440 ???iC ?vb+?1t [J40 Ob Ti 00 a 31, C l a s g g -?- ? 6 3 ?v 7 INOuIt? Np 1 ?44r rJ tkr, T*-T Co.,po4l,q- mQ.,8A -= p4vf- Cse'r?:cosw C$ eo ,L M? P?:, P,%ta. Pro d.?a?s ? Q ?S C? D a P ?r : k alb; D?-}A 391 C34F5)H':,.? F an +?, 9 1170 C3 0 C PS 0 Ps ,Pr: x.44,