Loading...
HomeMy WebLinkAboutPublic Works Committee Minutes 04.17.2023The Public Works Committee meeting was called to order at 6:00pm on Monday, April 17, 2023, by Committee Chair, Heidi Sparks. Members Present: Heidi Sparks- Chair, Iry Wilke- Vice -Chair, Jodi Mackay, Emelie Eaton, Aron Kostelecky Others Present: Matt Wheeler, Public Works Director Public Input: Nolle General Items 1. Approval of Minutes from January 30, 2023. Iry Wilke made a motion to approve the minutes of January 30, 2023. Motion was seconded by Emelie Eaton. Motion carried 5-0 to approve the minutes. 2. Approval of Minutes from March 20, 2023. Iry Wilke made a motion to approve the minutes of March 20, 2023. Motion was seconded by Aron Kostelecky. Motion carried 6-0 to approve the minutes. New Business 3. Emergency Call Out Report- Report attached m Items to note: o Not many call outs this past month 4. KLJ Report- Report attached • Items to note: o Splash Park- both phases are now moving ahead, some outstanding donations still waiting to receive, but most of the money is in place for the full project. Sun cover from the pool is still in near -new condition and the city will put up once the splash park is up and running. Laurel Dodgers will be renting the former pool building. Emelie asked if the Splash Park will be closed during lightning storms- this needs to be vetted still 0 4"' Street Reconstruction- Water Main was in Russell Park but was not on any of the maps, this was broken during the dig out of Russell Park- change out will be presented to Council at tomorrow's workshop to have this replaced and put down 5t" where it should have been according to maps. o WTP Lift Well Replacement- This project is getting pushed to get completed due to needing to be completed before high water due to amount of mud that comes into the plant. Power pole that was in the way was relocated on Friday, but this resulted in the power being cut to Riverside Park Old Business: Other Items 5. Aron- Foundation has several large potholes, who's responsible for the maintenance of this street, city or county? Matt stated this was county up until recently and is now city. This was never designed as a city road, best option may be to take it back to gravel to help with maintenance. Matt will send city staff out to take a look at and determine best course of action. 6. Emelie- Barnhart Rd needs to be have lights since there is more pedestrian traffic, since the hotel went in. There are more people walking to Walmart on that road. Matt stated this actually came up in another committee today (LURA) and they are looking at using TIF funds to add lighting to that road. Announcements Next Meeting will be Monday, May 15, 2023, at 6:00pm in Council Chambers Meeting adjourned at 6:45pm EmergenGy Overtime Callout List 1/1/2023 TO 6/30/23 Maintenance Shop -628-4773 City Dispatch 628-8737 Response Code X In Column Not accepting Overtime /NA = Not Available /Y = Responding /B=Phone Busy Employee Name Te e 1/2712123 Josh Sawyer Sam Waggoner 2/23 2/25 2/26 3-1 3/28 4/15 Dave Saylor N12 11 10 8 7 6 NA6 NA6 Fran Schweigert X X X X X X X X Brian Kline NAI NAI NAI NAI NAI NAI NAI NAI Kevin Budge = X X X X X X X X Justin Baker - Y10 9 8 NA7 Y13 12 Y12 Y13 Jay Hatton N13 12 11 9 8 7 NA7 NA7 Kevin Hoffman `' Y11 10 9 Y13 12 11 NA91 NA9 Keith Guy 2 Y13 12 10 9 8 NA8 NA8 Wade Spalinger 3 2 NA2 NA2 NA2 NA2 NA2 NA2 Daniel Nauman 4 3 4 3 NA3 NA3 NA3 NA3 NAS NA3 Brandon Gonzales 5 4 Y13 11 10 9 NA9 Y11 Tom Burwell 4 6 5 4 NA4 NA4 Y13 Y13 NATO Aaron Fox 7 6 5 Y12 11 10 NA10 Y12 Troy Clifton 8 7 6 NA5 NA5 4 N,Afl NA4 Joel Barnhardt 9 8 1 7 1 NA61 NA61 5 1 NA51 NA51 1-,-+ i i Elm Lift Station 628-7773 Village Lift Station 628-5918 Dial 9 after tone to acknowledge alarm Wastewater Treatment Plant -628-6474 I Autodailer- 628-4866 Response Code NO= In 1 st Column Not accepting Overtime / NA = Not Available / Y = R Employee Telephone Thomas Henry INMMM Cindv Caswell liiil"i7Mel �.Ti1 Norman stamper Water Treatment Plant 628-4410 Response Code I NO= In 1st Column Not accepting Overtime / NA = Not Available I Y = Employee Telephone HP Nuernberger Dylan Ceaser Josh Sawyer Sam Waggoner Joe Waggoner 44MMMW9 TJ Worbel _ Daniel Waggoner CABLE TV down Tim Johnson 698-6254 Matt Wheeler Cell# 208-1885 One Call Locate - 1-800-424-5555 (City Job # 25663) Kurt Markegard Cell# 860-5785 Hm 208-2356 SCHESSLER 628-4221 HESTON 281-0811 NW ENERGY 1-800-896-7862 LUMPY 860-7890 Advanced Pump 586-1700 Century Link 1-800-573-1311 Shop 628-7707Jeff 694-9097 GORDAN ACE ELECTF RIC 860-5464 NorthwestPipe 252-0142 - Larry E. 656-2856 MDU 1-800-638-3278 /MDT 252-4138 Pace Construction 252-5559 (sewer backups) MDT Supervisor Tom 655-7903/Kyle 446-2622 I San itarySystem Overflows call DEQ withing 24 hours at406-444-3080 Call Out - Date and Incident Location 1/27 Sewer back up City hall 730pm 2/23 H2O SHUTOFF 1248 BEARTOOTH 2/23 H2O SHUTOFF 501 BIRCH 2/25 H2O SHUTOFF 501 BIRCH 2/26 W MRYLAND H2O BOOSTER FAIL 501 ALDER PLUGGED METER 3/28 Sewer backup 615 Hazel 4-15 H2O BREAK 407 8TH AVE CURBBOX TA R� City of Laurel Project Status Update April 17, 2023 Splash Park Installation (KU #2204-01898) Reason for Project: To Replace the existing pool with a splash pad recreation area. Project Scope: To Construct a splash Pad at the site of the existing City pool. Current Status: ® Work Order Signed by City in January 2023 Playspace Designs is finalizing the final plans m Construction is expected to begin at the end of May 2022 Pavement Maintenance Project (0 Street Reconstruction) (KLJ #2104-00862) Reason for Project: To provide yearly maintenance and improvements to the City of Laurel Roads Network. Project Scope: Miscellaneous annual pavement maintenance design, bidding and construction in locations throughout the City of laurel Current Status: ® Contractor began work on March 271h, 2023 ® Storm system is progressing from the detention area north. ® Water installation began at intersection of South 11t Ave. and South 4th Street and heading west. o Change order #1 (installation of water main on South 51h Street between Cedar Ave. and Maple Ave.) has been submitted to City for approval on April 14, 2023 Water System PER (KLJ #2104-00147) Reason for Proiect: To update the Preliminary Engineering Report that was completed in April 2014 with the most current information. Project Scope: To Update the existing computer model for the water distribution system; Review pressure zone, tank and booster station alternatives; Analyze up to 3 different sites for a new water tank and explore funding alternative for all potential projects. Current Status: • Final PER complete; Has been posted to the City Webskite Page 1 of 3 ENGINEERING, REIMAGINED City of Laurel Project Status Update April ® Being Presented to City Council at May 2nd, 2023 Workshop ® To be Voted on May 9th meeting. Southside Stormwater Study (KLJ #2004-01470) Reason for Proiect: Analyze Laurels South side to determine needed improvements for stormwater. Proiect Scope:: To complete a stormwater master plan for the areas south of the train tracks and west of Highway 212. Current Status: ® Completed, need to discuss next steps in resolving outfall. WTP Lift Well Replacement (KLJ #2004-01487) Reason for Proiect: To replace a lift well at the Laurel Water Treatment Plant. Proiect Scope: Reconstruction and rehabilitation of the lift well at the City of Laurel Water Treatment Plant. Current Status: ® Construction has been ongoing since January. ® Change Order was issued due to inaccurate "As Built" Drawings that caused Contractor to relocate their shoring system to make piping connections. ® Power Pole that was in the way of construction was relocated on Friday April 14, 2023 ® Contractor is undergoing staffing difficulties and they have been notified to updated their schedule. Laurel Planning Services (KLJ #1804-00554) Reason for Proiect: KU has been retained to provide City of Laurel planning services as needed. Proiect Scope: Planning services may include; subdivision, zoning, development, floodplain hazard management, miscellaneous reviews and other related work. KU will prepare staff reports, recommendations, and attend meetings upon request. Current Status: ® Zoning Regulations Update. o Draft regulations sent to City April 11th, 2023 o Zoning fCommission on April 19th, 2023 • Planning Jurisdiction Issues moving forward. ® Downtown Parking Study. — On hold per City Instructions Page 2 of 3 ENGINEERING, REIMAGINED L A Uf GI�(� City of Laurel Project Status Update r ti April 17, 2023 Laurel Capital Improvement Plan (KU # 2144-00649) Reason for Project: KU has been retained by the City of Laurel to develop a 5 -year Capital Improvement Plan (CIP). Proiect Scope: The CIP is primarily a planning tool for annual budgeting to assist Departments and the Governing Body establish project priorities and funding. Current Status: ® Meeting held with City staff on April 11th, to update projects and costs ® Final CIP will be completed this week and submitted to City. ® The document will be presented to a City Council at Work Session a A Public Hearing before the City Council needs to be scheduled. Other Notes and Information Other potential projects have been identified during recent conversations between City staff and KU. City Public Works staff and KU task leaders meet bi-weekly to discuss current and future projects. As these are tentative, the timing and extent of KU's services are TBD, unless noted otherwise. Anticipated FY24 Projects 1. 71h Street reconstruction 2. Riverfront Park walking trail 3. Updates to Subdivision Regulations — Post 2023 Legislation 4. Reconstruction of 12th Street between Valley Drive and 111 Ave. 5. Sewerline Replacement Page 3 of 3 ENGINEERING, REIMAGINED