HomeMy WebLinkAboutCouncil Workshop Minutes 04.18.2023MINUTES
CITY OF LAUREL
CITY COUNCIL WORKSHOP
TUESDAY, APRIL 18, 2023
A Council Workshop was held in Council Chambers and called to order by Mayor Dave Waggoner
at 6:30 p.m. on April 18, 2023.
COUNCIL MEMBERS PRESENT:
_x_ Emelie Eaton
_x_ Heidi Sparks
_x Michelle Mize
Richard Herr
_x_ Casey Wheeler
_x_ Iry Wilke
_x_ Richard Klose
Jodi Mackay
OTHERS PRESENT:
Michele Braukmann, Civil City Attorney
Brittney Moorman, Council Administrative Assistant
Kelly Strecker, Clerk/Treasurer
JW Hopper, Fire Chief
Brent Peters, Deputy Chief
Public Input:
There were none.
General Items
1. School Bond Presentation.
Matt Torix (School Superintendent), Wayne Fjare (Facilities Director), and Chris Lorash (School
Board Member) presented the attached information and answered any questions from Council.
It was questioned if the schools would be a single story, and it was clarified that the buildings
would be two stories.
It was questioned what happens if the businesses protest their taxes. It was clarified that if taxes
are protested, they spread out amongst the taxpayers.
It was questioned whether the School District would sell off the current Administration building.
It was clarified that the School Board had discussed the possibility of selling that building. They
could put that money into a rainy day fund or use it to pay down the bond, and that is not
included in this bond proposal.
It was questioned if construction costs increase what areas would be cut from this proposal. It
was clarified that they would not be cutting classrooms or educational facilities. It was clarified
that the elementary and high school bonds are separate, and those funds will be kept separate. It
was further clarified that contingency money is built into the bond proposals. If those funds are
not needed, they will go back into paying for the bond. The School Board is committed to the
educational outcomes of the students.
It was questioned if moving the High School Library would give it more space. It was clarified
that it would have more space as there is room for a 2"d -floor open balcony concept, allowing the
old Library space to become three classrooms.
It was questioned what K-5 grade leveling meant on the handout. It was clarified that when the
5th grade moves to the new school, it will leave more capacity at the Middle School and give
room for growth.
It was questioned what the classroom sizes are. It was stated that grades K-2 can have 20
students per class, and grades 3-5 can have up to 28 students.
It was questioned if this bond includes any wages for additional staffing, and it was clarified that
the bonds are only for building maintenance. There are absolutely no wages included in these
bond proposals. The more kids enrolled in our school district, the more money they will receive
from the State.
It was clarified that if these bonds don't pass, the roofs will still need to be replaced, structural
issues addressed, etc. These things will be costly to replace. These kids are walking outside in -
20F to go to the bathroom. Some kids have to wear coats in classrooms because the temperatures
cannot be controlled in the classrooms.
It was questioned why the school district purchased the field on W. 121h Street. It was clarified
that it was not cost-effective to build in that location at this time. The school is keeping the land
and using it at a later date or selling it later on down the road. The elementary bond is maxed out.
Building on that land would cost between two and five million before even being able to put a
brick on it; it was not an efficient use of the funds at this time.
2. Motion to allow Council Member Klose to be absent from the City of Laurel for
possibly more than ten days. (LMC 2.12.060)
There was no discussion on this item.
3. Appointment of Fire Chief.
Mayor Waggoner stated his appointment is for JW Hopper. The Council will be voting on
that appointment at next week's meeting. There was no discussion on this item.
4. Appointment of Steven Hurt to the Cemetery Commission for the remainder of a term
ending June 30, 2024.
A typo in Mr. Hurd's name will be corrected for next week's meeting. There was no further
discussion on the item.
Executive Review
5. Resolution - Resolution Authorizing The Mayor To Execute Lease Agreements With
Laurel Little League And American Legion Baseball Post #123 For Baseball Facilities
And Pool Building As Described In The Lease Agreements.
These leases allow for the use of the old pool house; it will be used as a clubhouse and will
be charged $50 annually for the use of the old pool house. The indemnification has also been
updated.
They plan on painting the building and doing some minor changes inside the building. They
will take care of most of the maintenance as well. This building is useless for other uses.
This lease automatically renews each year. The City will still have access to all the pump
equipment for the Splash Park.
If the rent were to go up, they have first rights to the space moving forward.
6. Resolution - A Resolution Of The City Council Authorizing The Mayor To Execute An
Independent Contractor Service Contract With Play Space Designs For Phase Two Of
The Laurel Splash Park.
A prominent donor came forward to ensure Phase 2 could move forward. Council needs to
authorize the Phase 2 small service contract.
7. Resolution- A Resolution Of The City Council Authorizing The Mayor To Approve A
Work Change Directive For The Project Known As The WTP Lift Well Replacement.
There was no discussion on the item.
8. Resolution - A Resolution Of The City Council Authorizing Participation In The
Montana Board Of Investments Of Short -Term Investment Pool And Authorizing The
Execution And Delivery Of Documents Related Thereto.
The Clerk/Treasurer circulated an email explaining what STIP was earlier this week. She
was available for any questions, and there were none.
9. Ordinance No. 023-02: An Ordinance Amending Section 2.72.020 (Composition) Of
The Laurel Municipal Code Related To Membership In The Laurel City -County
Planning Board.
This is the second reading of this ordinance. The ordinance will clean up the Laurel
Municipal Code to match our interlocal agreement with the County.
Council Issues
Emergency Services Committee's next meeting is Monday at 6:00 p.m. in Council Chambers.
A Council Member heard from a local business owner that the turnaround workers do not get
long lunches, so they have not seen an influx in customers.
Other Items
0 Resolution — S. 4"' Street Change Order
There is a water main located in the middle of Russel Park, which needs to be moved into the
public right of way on S. 5"' Street. The Change Order for this water main relocation will be
$82k, and it will connect between Maple and Cedar; see attached.
Attendance at Upcoming Council Meeting
Announcements
The council workshop adjourned at 7:15 p.m.
Motion by Council Member Mize to reopen the Council Workshop, seconded by Council Member
Sparks. There was no public comment or Council discussion. All six Council Members present
voted aye. Motion carried 8-0.
Brent Peters, Deputy Chief, read the attached statement.
The council workshop adjourned at 7:19 p.m.
Respe
Brittney Moormat
Administrative Assis ant
NOTE: This meeting is open to the public. This meeting is for information and discussion of the Council for
the listed workshop agenda items.
WHAT ARE THE BOND GOALS?
Bond C-oalso — - -
MODEIRIeIGE LEARNIIl C- ENVIRONMENTS: In the past, k IMPROVE CAREER TRAINING OPPORTUNITIES:
Laurel committed to its students by building educational A new career training facility is proposed to give Laurel
facilities. It's time to recommit to our Laurel students, and students the skills needed to be successful straight out of
address the critical need for replacement and renovation. high school
2 CREATE ADDITiO€3§AL COMHAUNITY AMENITIES -
Create additional athletic fields, community parking•
improved gymnasiums, and auditoriums for public use.
g REDUCE CCS tl LY MAIINt'EN'MCE ISSUES: New additions
and school buildings are needed to save the school district
money in the long run by reducing costly maintenance work
Proposed Plans:
Elementary School District Plans
Additions and Renovations at
West Elementary
Q 2 -Story classroom lying Addition
.s ♦ .
!a-, „rx 0 Renovation of Nrest'elemente:y
t7 p
0 NshAuxiGcry Cxymrosium
, Q> kce� Parking lot n Parent Drop -Olt
t New 3-5 Elementary Scheoi
at Kogan Fields
6n.®D2dicnttd Faf:nt C�!op�Ufi
f' a N^w 8-5 Elementoty Schccl
Q Redevtioped socccr ricicr
-01
E ERHANCE SECURITY AND SAFETY: Renovations and
updates to existing schools will improve safety and security
for students, staff, and the public when utilizing the facilities
b L,DDRESS OVEROROWDING AT SCHOOLS: Additional
classrooms and school buildings will increase capacity,
allewata current overcrowding, and allow fer future growth.
High School District Pians
Sportsfreld at Graffi
_
Elementary Site
Q Updated Hieh School Tr.w.,:. Events
Jn
Q Community 50—. , Fuld;
\'"V.
Additrcnol Peri:inc
Q Softball Field
Additions and Renovations at
West Elementary
Q 2 -Story classroom lying Addition
.s ♦ .
!a-, „rx 0 Renovation of Nrest'elemente:y
t7 p
0 NshAuxiGcry Cxymrosium
, Q> kce� Parking lot n Parent Drop -Olt
t New 3-5 Elementary Scheoi
at Kogan Fields
6n.®D2dicnttd Faf:nt C�!op�Ufi
f' a N^w 8-5 Elementoty Schccl
Q Redevtioped socccr ricicr
-01
E ERHANCE SECURITY AND SAFETY: Renovations and
updates to existing schools will improve safety and security
for students, staff, and the public when utilizing the facilities
b L,DDRESS OVEROROWDING AT SCHOOLS: Additional
classrooms and school buildings will increase capacity,
allewata current overcrowding, and allow fer future growth.
High School District Pians
Types of Spaces the New Bond Will Create
F., 0
Athletic & CTE Additions, and hrterlar
Renovations at the High Sehool
® Spcciai Educetlon Renovation
Q Adrrin Office Renovation
® A11101c Expauion
Q L,bn,ry Renovation
® urE rxponsiaa
Relocating the Adrsirastratien Building
® Renovated South Elrmentory
Q Modular clossr—rns becomo fozilay stooge
® Enistrng spertsficid to remoin
Jn
-
\'"V.
Types of Spaces the New Bond Will Create
F., 0
Athletic & CTE Additions, and hrterlar
Renovations at the High Sehool
® Spcciai Educetlon Renovation
Q Adrrin Office Renovation
® A11101c Expauion
Q L,bn,ry Renovation
® urE rxponsiaa
Relocating the Adrsirastratien Building
® Renovated South Elrmentory
Q Modular clossr—rns becomo fozilay stooge
® Enistrng spertsficid to remoin
WHY IS THIS BOND IMPORTANT?
FACILITIES ARE ATCI,-,,
Middle School Capacity -- -- --
Existing (Without Bond)
Sao
"0
600
C- Compr_ty
Elementary School Capacity
E 'st' N1/•th t d)
xi �na� ( IA/,+k
ou
ix0a
'°°
600 f F
aoo
� Ovev r—, -Ay
GRAFFELSMENTARY
C -tf F.icmcrte: y duet nut hove enough
12, xi rns and tc eeiui*r )nadas fw�u.:' na..
plocrd en art¢ ac o t rnmcry xeL•hnn far
v.+Crowding Ir. Mr mc3, a� 2dN3 the orter:c•
ttud•,Mn must th-I t+e —11 tha mod✓k:. u:c
!ec n✓„r. W19in!• t4eunh0vt the day
PropoEed (With Bond)
coo
too
Frrr+9rgr-rtlt •-
d00
Soo �� �•� � � � � -: :.' l
� Ove• Co:rpectty
Proposed (With Bond)
wrm: yv+
woo
no
600 -
zoo
a a.s a a a s a a a a .. �x R•a•ep a�a
� Ovu Cc. -,panty
ow -
fit[. • r
SOUTH ELEMENTARY
5-. 'Fl --v isuptrctinjanu.... poen,
*nd so ttudrntn meet V -C nuls:de bet'. -sr,
th.ir-6d 151 cletstnon)-e tM mom. huilymg tr
'ac th* EM1e *om. hour !uach gc to tha hh:aq'
th,��an rhr lay, ever it p� «e ether condo.^.
BUILDINGS ARE AT THE ENDS OF THIER LIFE.
I � ,
GRAFF ELEMENTARY WEST ELEMENTARY SOUTH ELEMENTARY NdEST ELEMENTARY
�ali::n 1911. G:r.;i Ff:mentcry is cm of Un
9u➢tin2Y>5.%V-tc:.;n_r.:n:y to*ui-
C7 -z t -3U -1y 2022 Th* ptpc3 In IN, ra3ctor
U/o ot•Sau-S., and Craft --M..v
dost b�hdinys N tho dLbld or:d Fw¢
aigrir5cect upmudaa to Ka r..achcniccl
69,rF..:a.Shawnd-is
a?lf•in tha p!1nclFal offi- t South EtemarRa;•
have old mtd-jod c),r—,-trot aro eectty
�dached rho end of ito l,f¢t ahii*cacta t¢
u+atanplo of nldL
br.R,faod.ttg w -oto) th-qg-t tha hes chd
:*:rcidLhznd i.rru'M1 s'grrattl upy^.&-i.=t
msi:2cln rho Cu�:di-..g lnc:*w-¢exhyc*r,
carrcd3d p:poa *nd ayctipmLm tlx:-roquha
Into c.^.3reoT: raquiFire that the Roo:. ba
m2&- --=e- rtu-de:-
eoratant'*poll and replace. tint, tvhl-h
eth pl-d urofYrL-lted. Wlair.WrG.nec
hlwh3, thO ea:u cndoG•j cad dayt,c strip
ova'tirr . is o it rmendcuS atprn;*.
15-IS;<•eth=o•*e*arty old invatts*M
do -
MODERNIZE ACADEMI0 PHYSICAL EDUCATION ENVIRONMENTS.
rMUMI"ARTSIACI- E,i ratnWRIM. 4EEq'T ELCL:C-TAr,V MCI" SCHOOL \1,If=E,1TLItM TRAIWNO
EtihtnlY6:ti )M lnd::rRrm'Arit./Ay.::^. \'ic:l iaumrr::•atylwi:: .: dvimcicA `}C_,v�c.,crlrr,). r{.uton wltnN!i.:.:,:.�:,:h:P}n:::!.c,ia:a'.t;:ng•gtthr.6 n.dW:n-,:¢A
lar tdinp at -.he Laaei liirrh oeime:l iwh 6rcr. yymntm,nr, c•I.K
m tvr.t*ua+vn•-rlx.:ny rn pru+nerna-:anmr+.a h.
-A.- rCmpa ihuen.11'.leudb�rmnt ee s'h°ul to
mowpu.r .ndn.j ed1r^ flih1;s-:f-1C01111111 &
01r:e-,nb.otr+'Iy MEaSPI-IM
mr.atnuanry Ctr
l,rl*nts wKh Mt-, M1t mt•c. ivmvon ar. t}r phytlrnl -t4ty meu r...rt the ncade et v�.Ow,tc •Mtt fm yah p.r¢t-t¢.r.on Steel acAtn•L M bl.
t9•i>+. n.ltr.Nuti1N,*Ir u'I.rrttr •1nM nn W')rnel,ya•ttm. (+'i: nnCM nn L: »^.rfy-nh'rrR:.
t+r..n:.rf,rnv� a•• edo¢•M. c. rnndor„ rsv.rf•w-hcoghcaf¢ty to,hha+6p,
k•o. nvirunnn•nL };,ycrnrer.r_nlie+•¢xrc*ntlw cat�Mo
WHAT ARE THE PROJECT COSTS?
High School District Cast Brrzakdovvn:
$31 M1
' � PHYSICAL EDUCATION EXPANSION
L+:'�dea en au F.vY grn-r:aa.ati h=1 -a, ur_v. fw_..T+t�vit>.i a <•c�tir� ,::.-,
LIBRARY, SPED, MUSIC, PERFORMING
ARTS FOS RENOVATION $3.445,000
h:vl,a c3d1'.•n to tN [b+vr. adi:tiatilSY ,al fcL:ate: P.:saca�a rid FCS
CAREER TECHNOLOGY ADDITION $3,850,000
mica, [arau Uo pnv .Jaa<hndaGV CL-aua<cs
GRAFF FIELDS DEVELOPMENT ; ` i0C. C�Pu
n:l \i pu4irg oM car'¢:au bc!+-,a 1s+v:a
CONTINGENCY $2,254.800
LxYdaf +eMtnaa'v, a,,d eN-ale h!,ert.xt+•a a<-•dl.�s.c.
PROFESSIONAL FEES $2,205.280
DEFERRED MAINTENANCE cUDMET $2.056.079
lxbda, ha^d, trtn.L-d to +<+v t» recd, a! dedee+<I a,enanarie
SITE IMPROVEMENTS $7,3rB4OGQ
BUS BARN IMPROVEMENTS $1,700,000
h:laaa dawL-F'cant ar raer Ew bam cod itdY Nwec;Y.,erLl-g.
2` BOND COSTS, LEGAL, INSURANOS
fxkdsa Vl band +aY. a.tMoHwf.CCR W%ry coat+. v,duvsraa
2 FF&E + TECHNOLOGY $6717•185
n<I.4afw Yana ie+:A¢a. eeJJ.nv': ala: L+e!agV ei!:t)ara
1 PERMIT, FEES, & TESTING $203,121
buhda+lvntuie.fi<t,aea +µ1pnant. aatl t.. A+Y:gy ¢dmtiva
I it,ricBond: X3'!,000,000
Edunentory SONG 4 nand: $Li7,000,000
VOTAL BOND AMOUNT: SMB,U00,,0C0�
WHAT DOES IT COST ME?
tu;—ed rf. Jncirrtm on -I I tX^1 home /toxnbk r.,ur. ;•Ttr;.iv"J
$g2_�O J I-•Son.n � ����:.��.,' ;'ear
Elementary District Cost Breakdown:
NEW ELE'a-4'sN7ARY (3110 - 5th) $2736Q000
WEST ELEMENTARY $15,538,513
n_r.'�-f a nrv: ct�ci U ;to e: !Se9 erd an eddaron
PROFESSIONAL FEES $4,826,465
prslv>atm.:-
CONTINGENCY $4,637,695
r[Lkef <¢rnn,:e:n rd ¢Y•ax<nc�tn,ctu„+�r'-p+r<y.
S. BOND COSTS, LEGAL, INSURANCE $4.c.•r
cllcrd... 1.:spa!1<aa Cd u11R[Y«a+. od 1--
2 FF&E + TECHNOLOGY $1.166,873
r:raaa+ 4_uh'�a. Mwax ey:$xarl end to:Yrsd:t5/ k+ap a:a.�[ �ltry tc':yz�
9 DEMO GRAFF ELEMENTARY $826.950
�:•::' e;., ai u,a <. + ,s pox o:.ma-:ary ;<txt <¢ r¢�s< rcy r::.,. +.:.�.
g' FtFAMJ7. FEES, & TESTING $454.985
A, .... a..a,ctraa,eye+•«p..®,..a.,.�„�r:,ea.,..m.ew•<�n..
ttlY12RRRIIY`v
ESYL*44TED M'L.L L.EY-i COAP-nAlIIIi2 -.r. w.:..,..
:y D
RESOLUTION NO. R23 -
A RESOLUTION OF THE CITY COUNCIL AUTHORIZING THE MAYOR TO
APPROVE A CHANGE ORDER FOR THE PROJECT KNOWN AS THE SOUTH 4TH
STREET RECONSTRUCTION.
BE IT RESOLVED by the City Council of the City of Laurel, Montana,
Section 1: Approval. The Change Order for the Project known as the South 4"' Street
Reconstruction Project, a copy attached hereto and incorporated herein, is hereby approved.
Section 2: Execution. The Mayor is hereby given authority to execute the Change
Order for the Project known as the South 4"' Street Reconstruction Project on behalf of the City.
Introduced at a regular meeting of the City Council on the day of April, 2023, by
Council Member
PASSED and APPROVED by the City Council of the City of Laurel the day of
April, 2023.
APPROVED by the Mayor the day of April, 2023.
CITY OF LAUREL
Dave Waggoner, Mayor
ATTEST:
Kelly Strecker, Clerk -Treasurer
APPROVED AS TO FORM:
Michele L. Braukmann, Civil City Attorney
R23- Approve Change Order for South 4" Street Reconstruction Project
Change Order
No. 1
Date of Issuance: 4/14/2023 Effective Date: 4/14/2023
Project: South 4th Street Reconstruction Owner: City of Laurel Owner's Contract No.:
Contract: Date of Contract: June 8, 2022
Contractor: COP Construction Engineer's Project No.: 2104-00862
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Contractor is instructed to abandon an existing waterline within Russell Park and replace with an 8" waterline and appurtenances in in
In South 5th Street between Maple Ave. and Cedar Ave. See the Attached exhibit sheet U-16
Attachments (list documents supporting change): See previously submitted WCD No. 1 and Contractors Copy of Laurel new tie-in
Waterline plan & profile between Maple Ave. and Cedar Ave. on South 5th Street — U16
Engineer's Breakout of Change Order Cost
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days
Substantial completion (days): 140 Days starting on March. 27, 2023
$4,298,070.00 Ready for final payment (days): 170 Days starting on March 27, 2023
Increase from previously approved Change Orders No. 0 Increase from previously approved Change Orders
to No. 0: No. 0 to No. 0:
Substantial completion (days): 140 Days starting on March. 27, 2023
$0.00 Ready for final payment (days): 170 Days after starting on March 27, 2023
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion (days): 140 Days starting on March. 27, 2023
$4,298,070.00 Ready for final payment (days): 170 Days starting on March 27, 2023
Increase/Decrease of this Change Order: [Increase] [Decrease] of this Change Order:
Substantial completion (days): 5 Calendar C
$82,251.00 Ready for final payment (days): 5 Calendar
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion (days): 145 Days Starting on March 27„ 2023
$4,380,321.00 Ready for final payment (days): 175 Days starting on March 27, 2023
RECOMM 1DED• l / ACCEPTED: ACCEPTED:
By: G✓ e -By: By:
Engin r (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature)
Date:
South 4th Street Reconstruction Change Order Page 1 of 2
KU Project 2104-00862
�
�
! �a + /
M
)z(
�. G % � /
MAPLEm�: \
3mRAVE
o#aooVIS p£a,me@u�".LS HIS 2
"13?jnvi
, _ _ «:
�
,I
,§
Im
�
,I
PIP
Im
�)
;|[[
B §m7§
�}o(
(
)
�
�
§
�
(f
■\
\
/A
.
. �.
§.
§§!§
//r
I§
Mayor Waggoner, Council Members and City Staff,
I would first like to congratulate Chief Hopper as the next Fire Chief for the City of Laurel. I do believe the
selection was the good one to build a working relationship between the Fire Department and the City of
Laurel. I have full faith in JW and that he will transition the fire department well in to the future. I have
watched JW grow for many years and become one of the most dedicated and reliable leaders of the fire
department. I hope I was able to be a mentor to him during that his growth with the LVFD.
I'm sure we all have heard Michelle speak several times about showing up every day. That is what we all
need to do. Show up and give our best, hold all of ourselves to the highest standard and be accountable
for our actions. If we all do that then Laurel will flourish. On that note, I would like to thank Council
Members Mize and Wilkie for doing just that: showing up. The firefighters are delighted with your
interest in learning what we do, how we train and learn.
Both have participated in the fire departments training and meetings for a month and half now. Thank
you both very much.
Over the last couple of months, I have spent a lot of time thinking of what is the path going forward? (-
remind myself of what I preach: "What we do is bigger than any one of us". I have certainly used this
many times at the fire department, but this is true for everyone who serves the citizens of laurel. With
this quiet and less stressful environment I -find myself in now, I have identified that my direct personality
and my need to fix a problem the moment it becomes a problem (Thank you to the Military) is not
always the most fitting approach for others involved. Perhaps, learning to be more transparent outside
of the chaos and madness that is often our norm in the fire department.
Every day I remind myself WHY I joined the fire department almost 25 -years ago. That reason was to
continue serving but on a smaller scale than the military by serving my community. That is what I will
continue doing, every day.
I want to thank the Council Members, City staff and all those I have had the pleasure working with over
the years. We have accomplished so many projects and improvements together and have overcome
many obstacles and adversity. Thank you for the opportunities I have been given to learn and lead such
an exceptional fire department.
Thank you, and again
Congratulations to Chief Hopper
Brent Peters
Laurel Fire Department
406-670-8954