HomeMy WebLinkAboutResolution No. R23-27RESOLUTION NO. R23-27
A RESOLUTION OF THE CITY COUNCIL AUTHORIZING THE MAYOR TO
APPROVE A CHANGE ORDER FOR THE PROJECT KNOWN AS THE SOUTH 4TH
STREET RECONSTRUCTION.
BE IT RESOLVED by the City Council of the City of Laurel, Montana,
Section 1: Approval. The Change Order for the Project known as the South 4th Street
Reconstruction Project, a copy attached hereto and incorporated herein, is hereby approved.
Section 2: Execution. The Mayor is hereby given authority to execute the Change
Order for the Project known as the South 4th Street Reconstruction Project on behalf of the City.
Introduced at a regular meeting of the City Council on the 25th day of April, 2023, by
Council Member Klose.
PASSED and APPROVED by the City Council of the City of Laurel the 25th day of
April, 2023.
APPROVED by the Mayor the 25th day of April, 2023.
CITY OF LAUREL
0'6t�01101'
Dave Waggoner, Ma or
ATTEST:
e c er, Clerk -Treasurer o`�. • '
APPROVED AS TO FORM: ;.� •• .:,\
=, AA • 't1 .
��'STONE�'��`���`
. 4 1 ,,,,,,,,,,,,,0\
Michele L. Braukmann, Civil City Attorney
R23-27 Approve Change Order for South 41h Street Reconstruction Project
Change Order
No. 1
Date of Issuance: 4/14/2023 Effective Date: 4/14/2023
Project: South 4th Street Reconstruction Owner: City of Laurel Owner's Contract No.:
Contract: Date of Contract: June 8, 2022
Contractor: COP Construction Engineer's Project No.: 2104-00862
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Contractor is instructed to abandon an existing waterline within Russell Park and replace with an 8" waterline and appurtenances in in
In South 5th Street between Maple Ave. and Cedar Ave. See the Attached exhibit sheet U-16
Attachments (list documents supporting change): See previously submitted WCD No. 1 and Contractors Copy of Laurel new tie-in
Waterline plan & profile between Maple Ave. and Cedar Ave. on South 5th Street — U16
Engineer's Breakout of Change Order Cost
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days
Substantial completion (days): 140 Days starting on March. 27, 2023
$4,298,070.00 Ready for final payment (days): 170 Days starting on March 27, 2023
Increase from previously approved Change Orders No. 0 Increase from previously approved Change Orders
to No. 0: No. 0 to No. 0:
Substantial completion (days): 140 Days starting on March. 27, 2023
Ready for final payment (days): 170 Days after starting on March 27, 2023
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion (days): 140 Days starting on March. 27, 2023
$4,298,070.00 Ready for final payment (days): 170 Days starting on March 27, 2023
Increase/ Decrease of this Change Order: [Increase] [Decrease] of this Change Order:
Substantial completion (days): 14 Calendar Days
$88,152.36 Ready for final payment (days): 14 Calendar Days
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion (days): 154 Days Starting on March 27„ 2023
$4,386,222.36 Ready for final payment (days): 184 Days starting on March 27, 2023
RECOMM DEQ-
.
By:
2_lz
Engi r (Authorized Signature)
Date: 4/24/2023
AC
By
By:
Owner rho Signatu e)
Date:
ACCWntractor;(
By:
uthon ed Signature)
Date: 4/25/23
South 4th Street Reconstruction Change Order Page 1 of 2
KU Project 2104-00862
ENGINEER'S BREAKOUT OF CHANGE ORDER COST
2022 Pavement Maintenance Project
S. 4TH ST FROM WEST AVE. TO HWY 212
City of Laurel, MT
April 24, 2023
<<KLJ
ITEM
DESCRIPTION
UNIT
QTY
UNIT PRICE
TOTAL PRICE
Schedule 2 - Water System Improvements
202
Taxes, Insurance and Bonds
LS
1
$2,750.00
$2,750.00
203
Traffic Control
LS
1
$1,300.00
$1,300.00
206
Temporary Water System,
LS
1
$1,300.00
$1,300.00
208
Remove Ex. Valve
EA
2
$250.00
$500.00
211
Remove Ex. Water Main
LF
20
$13.00
$260.00
213
Connect to Ex. Water Main
EA
2
$2,000.00
$4,000.00
215
8" C900 PVC Water Main
LF
1 392
$78.00
$30,576.00
217
8" Gate Valve & Box
EA
4
$4,300.00
$17,200.00
219
8" tee
EA
1
$1,700.00
$1,700.00
222
8" X 6" Reducer
EA
2
$1,000.00
$2,000.00
224
8" Bends
EA
1
$1,400.00
$1,400.00
231
Install 2" Water Service w/Curb Box
EA
1
$3,300.00
$3,300.00
232
Install 1" Water Service w/ Curb Box
EA
1
$2,500.00
$2,500.00
233
1" Water Service Reconnection
EA
1
$30.00
$30.00
238
Exploratory Excavation
HR
4
$350.00
$1,400.00
416
1-1/2" Crushed Base Course
CY
145
$41.00
$5,945.00
418
Gravel Alley Surface Repair
SY
435
$14.00
$6,090.00
Unit Price Item Changes
L5
1
$5,901.36
$5,901.36
Total Change Order Cost
$88,152.36
—G—G—
CUT AND REMOVE 10 LF
OF EXISTING WATER AWN
CAP END
l I _
Z
0
U
H
cn
Z
O
UW
W � �
N �gw
w 0
O
w�5
U
eGLE FEET
Q
m
- U16 J
Ap 1t, 2023-S13pm-KWraj t�'CNy�MTLurM�2101_OOBS1,X022_PAvemeMM�lAeraricalCADWSJAYI-PNmPraeN.Uwy (U181 .. t.....-
0
S ,
EX 11 GRADE
N •T.98L
,7.W
RIM
RIM 32BAd1
_
ie' INV IN 32M" M)-
18'W .. 328&/9 (SI
_--.__________
�
________
_________________________
____
B•GATE VALVE
--------
SLFWIP CWATERMAIN STA O✓�5
SLFTPVCWATERMMN
3290
8
352 LF 9' PVC WATER MAIN
10 LF r PVC WATER AWN S•S'TEE
C (TATE VALVE STA 0 W, 0.0
STA l
nr REDUCER
STA 4-t2
CONNECTTO EXISTING
W GATE VALVE 6 BO%
W PVC WATER MAIN
VERIFY SIZE, OEP
STA 4M . 0.G 8' 90' SENO
STA 4-12
8 LOCATION
CONNECT TO EXISTING
CP WATER MAIN
3275
VERIFY Ste. DEPTH
B LOCATION
FG EG
FG EG
FG EG
FG EG
FG EO
Z
0
U
H
cn
Z
O
UW
W � �
N �gw
w 0
O
w�5
U
eGLE FEET
Q
m
- U16 J
Ap 1t, 2023-S13pm-KWraj t�'CNy�MTLurM�2101_OOBS1,X022_PAvemeMM�lAeraricalCADWSJAYI-PNmPraeN.Uwy (U181 .. t.....-