Loading...
HomeMy WebLinkAboutPublic Works Committee Minutes 08.15.2022AGEND. CITY OF LA PUBLIC WORKS MONDAY, AUG The Public Works Committee meeting was called to orde 2022, by Committee Chair, Heidi Sparks. Members Present: Heidi Sparks- Chair, Iry Wilke- Vice Mary Carter Others Present: Kurt Markegard- Public Works Director Public Input: None General Items Approval of Minutes from July 18, 2022- Bill M minutes of July 18, 2022. Motion was seconded approve the minutes. New Business 2. Emergency Call Out Report- Report attached 3. KLJ Report- Report attached Items to note: 0 2022 Pavement Maintenance Project issues with supply chain and/or emplo pushed back to October o Water System PER- meeting schedule new water reservoir. Possible discussii o West Railroad Street- received notice The city needs to commit funds to the before the council in the coming mont o Cherry Hills subdivision- will be pavii week so lots should start being sold Old Business: None Other Items 15, 2022 at 6:OOpm on Monday, August 15, Bill Mountsier, Emelie Eaton, atsier made a motion to approve the Emelie Eaton. Motion carried 5-0 to 4th Street Reconstruction)- due to nent issues the start date has been this week to begin discussions on i item for September meeting :)m the state regarding the project. coding shortfall. This will be coming and then final walk through is next • Mary brought up the ruts by South Pond on S�81h Ave. Suggested adding some pea gravel to help absorb water and even out the round. Announcements Next Meeting will be Monday, September 19, 2022, at 6: Opm in Council Chambers Meeting adjourned at 6:52pm UW City of Laurel. Project Sta August 15, 202 2022 Pavement Maintenance Project (4th Street (KU #2104-00862) Reason for Project: To provide yearly maintenance and imp Network. Proiect Scope: Miscellaneous annual pavement maintenance locations throughout the City of laurel Current Status: • Project Bid Opened on 5.5.22 • Contracts Executed 6.8.22 • Suspend Work Order issued 6.8.22 (Contractor to • Contractor is scheduled to begin work on 9.12.22 Water System PER (KU #2104-00147) Reason for Proiect: To update the Preliminary Engineering the most current information. Update 4( I(VKLI struction) ments to the City of Laurel Roads bidding and construction in n in Spring of 2023 rt that was completed in April 2014 with Prosect Scope: To Update the existing computer model for the water distribution system; Review pressure zone, tank and booster station alternatives; Analyze p to 3 different sites for anew water tank and explore funding alternative for all potential projects. Current Status: • Working on finishing draft report with info from Southside Stormwater Study (KLJ #2004-01470) Reason for Project: Analyze Laurels South side to determine n I Project Scope:: To complete a stormwater master pla6forth of Highway 212. improvements for stormwater. areas south of the train tracks and west . Current Status: • Completed, need to discuss next steps in resolvinj outfall. WWTP Screw Pump 8 Replacement (KU Reason for Project: To replace screw pump B at the Laurel �) ENGINEERING, REIMAGINED Treatment Plant. Page 1 of 3 R,a City of Laurel Project Status Update August 15, 2022 4(VKL Project Scope: Reconstruction and rehabilitation of the Archimedes Screw Pump "B" at the City of laurel Wastewater Treatment Plant. Current Status: • Project Bid July 11t • Project Award July 13th • Old pump removal completed week of July 11th • New pump installation roughed in week of July 11th • Pump grouted August 9th • Lakeside inspection for the week of August 22nd • Project completion, August 2022 WTP Lift Well Replacement (KU #2004-01487) Reason for Proiect: To replace a lift well at the Laurel Water Treatment Plant. Project Scope: Reconstruction and rehabilitation of the lift well at the Citv of Laurel Water Treatment Plant. Current Status: • 100% review with Nathan completed February 8th • DEQ approval received March 14th • Pre -Bid conference was held on May 121h • Bid opening was held on May 19th • Construction agreements executed • Construction to take place late fall and winter Laurel Planning Services (KU #1804-0055411 Reason for Project: KU has been retained to provide City of Laurel planning services as needed. Project Scope: Planning services may include; subdivision, zoning, development, floodplain hazard management, miscellaneous reviews and other related work. KU will prepare staff reports, recommendations, and attend meetings upon request. Current Status:. • Zoning Regulations Update. To be scheduled • Subdivision Regulations Update. In house project • Planning Jurisdiction Issues moving forward. • West Interchange Plan. Local match not budgeted • Planner/Project Transition. Ongoing • Lazy KU Subdivision 2nd Filing. Element and Sufficiency Reviews. Waiting on additional information. Page 2 of 3 ENGINEERING, REIMAGINED KLICity of Laurel Project Status Update August 15, 202 Laurel Capital Improvement Plan (KU # 2104-00649) Reason for Project: KU has been retained by the City of Laurel to develop a 5 -year Capital Improvement Plan (CIP). Project Scope: The CIP is primarily a planning tool for annual udgeting to assist Departments and the Governing Body establish project priorities and funding. Current Status: • Task Order executed • Kick-off meeting Department Heads • Initial structure of CIP generated • Department Heads contacted for additional projel • Document is being drafted. • A meeting with City Department Heads needs to L • The document will be presented to a City Council I • A Public Hearing before the City Council needs to I Other Notes and Information scheduled in late November. irk Session scheduled. Other potential projects have been identified during recent conversations between City staff and KU. City Public Works staff and KU task leaders meet bi-weekly to (discuss current and future projects. As these are tentative, the timing and extent of KU's services are TBD, unless noted otherwise. Anticipated FY22 Proiects 1. West Railroad Street Reconstruction- Proposal su 2. Water System Planning a. Booster station rehabilitation or replacen b. Water storage tank Preliminary Engineeri 3. 71h Street reconstruction 4. Waterline extension out to Golf Course Road 5. Updates to Zoning regulations 6. Updates to Subdivision Regulations 7. West Interchange Neighborhood Plan Other Potential Future Proiects 1. West Side TIFF itted t (task order forthcoming) Report Page 3 of 3 ENGINEERING, REIMAGINED