HomeMy WebLinkAboutResolution No. R22-25RESOLUTION NO. R22-25
A RESOLUTION AWARDING THE BID AND AUTHORIZING THE MAYOR TO
EXECUTE ALL CONTRACT AND RELATED DOCUMENTS FOR THE PROJECT
KNOWN AS SOUTH 4TH STREET RECONSTRUCTION PROJECT.
WHEREAS, the City of Laurel needs to conduct reconstruction work on South 4h
Street, Laurel MT, known as the South 4th Street Reconstruction Project (hereinafter "the
Project");
WHEREAS, the City of Laurel has complied with its procurement policy and Montana
law by utilizing a competitive bid process to ensure the project cost and firm selected is in the
best interests of the City in both quality and price; and
WHEREAS, the City of Laurel sought bids from qualified firms to complete the project
by publicly advertising the project pursuant to Montana law; and
WHEREAS, the City of Laurel received a responsive bid from Cop Construction for
the project; and
WHEREAS, Cop Construction's bid to complete the project is for the total cost of Four
Million Two Hundred Ninety -Eight Thousand Seventy Dollars and No Cents ($4,298,070.00),
with the City setting aside an additional Two Hundred Fourteen Thousand Nine Hundred Three
Dollars and Fifty Cents ($214,903.50) for contingency purposes;
WHEREAS, Cop Construction was the lowest qualified bidder, and such bid is attached
hereto and incorporated by reference herein; and
WHEREAS, the City of Laurel currently possesses adequate funds to complete the
project and it is in the City of Laurel's best interests to proceed with the project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Laurel,
Montana, that the City Council accepts the bid with Cop Construction and the Mayor is
authorized to execute all contract and related documents with Cop Construction for the project
known as South 4" Street Reconstruction, pursuant to the terms and conditions contained in
the attached bid for the total cost of Four Million Two Hundred Ninety -Eight Thousand Seventy
Dollars and No Cents ($4,298,070.00), with the City setting aside an additional Two Hundred
Fourteen Thousand Nine Hundred Three Dollars and Fifty Cents ($214,903.50) for contingency
purposes.
Introduced at a regular meeting of the City Council on the 24th day of May, 2022, by
Council Member Herr.
R22-25 Awarding Bid and Authorizing Mayor to Execute Contract Documents for Project Known as South 01
Street Reconstruction Project
PASSED and APPROVED by the City Council of the City of Laurel the 24' day of
May, 2022.
APPROVED by the Mayor the 24h day of May, 2022.
CITY OF LAUREL
EL
i 6�
Dave Waggoner, Maydr
ATTEST:
S ker, Clerk -Treasurer
APPROVED AS TO FORM:
Michele L. Braukmann, Civil City Attorney
R22-25 Awarding Bid and Authorizing Mayor to Execute Contract Documents for Project Known as South 4a'
Street Reconstruction Project
2611 Gabel Road
Blllinga. MT 59102-7329
4062455499
HLIENG.NG.COMOM
May 9, 2022
Kurt Markegard
City of Laurel
115 W. 1st Street
Laurel, MT 59044
Re: S. 4th Street Reconstruction Project — Recommendation of Award
Dear Kurt:
Bids for the S. 41h Street Reconstruction project were received on May 51h, 2022. Five bids were opened
and read aloud, with bid amounts being $4,816,738.00, $5,264,339.00, $5,063,731.52, $5,246,058.00,
and $4,298,070.00. All bids were considered responsive bidders. The bids were checked for
mathematical accuracy and two bids had discrepancies. Western Municipal miscalculated the total price
of schedule 4 and subsequently their total bid amount. KLE Construction miscalculated several bid items
on schedules 1, 2, & 3, and subsequently their total bid amount. Their recalculated bids amounts do not
affect the order of bids from high to low.
In addendum No. 1 we made allowances for either the Contractor or the owner to request a unit price
change for the asphalt pay item. This was due to the volatility of recent asphalt prices and the time
expected between bidding and paving of the project. This price adjustment along with expected varying
amounts of bid item quantities leads us to recommend that the Owner include a 5% contingency into
their proposed budget for this project.
The lowest bidder for the total project is Cop Construction. We recommend the overall contract for bid
be awarded to Cop Construction for the amount of $4,298,070.00 with the City setting aside an
additional $214,903.50 for contingency. Enclosed is the Notice of Award (NOA) for the City's approval
and a Certified Bid Tabulation. Please sign, date and return four (4) original NOA forms; upon receipt,
we will work with Cop Construction to route final Contracts for the City's approval.
If you have any questions or concerns, please contact me at (406) 245-5499.
Sincerely,
KU s
an E. Welsh, PE
Project Engineer
Enclosure(s): Notice of Award
Certified Bid Tabulation
Project d: 2104-00862
cc: file
ENGINEERING, REIMAGINED
T"UUMON OPSIOS
SM AVENUE WATERONE MOM PRWER
i vwn w;M «vel
ry6,lo)1
StlwOu5e 1-S[mmbryammmb
Figlnne L inbn of Ces[
We m Mdpal[nm on
MI nBMM1ers [mabucHon
qE Cmsb W - LLC
ACMI LLC
C, [msbucUoo
mt
�
MW9vWn
13 Wl
13aimm
tlA
]mpmm
venom
-
m
1m imas,F�maraammMa
644m
umom
umo
zo,5m
ss.600m
ssmm
inX¢4vmi
WDMm
6.1]II
ss}mm
]e,Ypm
a$Sm
15,¢pm
1w am.MXmm�na
Wm4m
K.mu
vs6Xm
ate.
ss6pm
npoom
nm
929sm
92¢
65Wm
asm
]m FmwLLn v��
'6
35.W
IaG1N
]3,115,
)w.]so.
33.m
3551
566m
]9>50
W
p.m
W
LII M irerq Bam�p
i] 3A
a1(p
K,9AID
]$m
IYAmmbaln
Km
ID
01
915ID
�m
13814
1PM
mW
158%
91.m
g.m
lanL
]B'Slumpraln0
Km
81169
K30
gam
I)$Y
0SW
139m
94m
1W9m
13]m
sss
1mm
513
]], >I'hmnpE6bmbaAA
47A
iWm
]3Ym
Mm
35
Tqm
ZY Smm YnNVI
1mm
w]m.
P&lO
136m
<]$bl
%353ID
IAm
>o,Rl
Im.W
]H 36•SbmbaF
Ivs
3pK.40
S;fm
35mm
IbW
anWpm1.Lm=.oO
,B6m
A
S,
IAAm
.yLW
).>m.W
. mm.mnm'mmmW
V7�.M
SPiym
650.m
$am
53
SLm
514953
Sxm
ks,)a
$im
SWmm
YfSuem¢L
524555
s;m55
hm}R4]
k.]W)a
5luiwiW
SRMI[E-WaMSyabmpplpemenb
p�neM1OpNMn5fx6
Wesbm MimWpJ ComNNon
WNw Bmtlrtn8on5bsMn
LLEfnnaumtbnll[
I0. Cq 11G
6ppCm5Mym�
lOiunNR
XnSm,wm
�LLSi
rtMiQ
ten
rt
imueWR
Iwn
1mLLmQsuR
Xn
1m
SOs.omm
5
Slm.®.m
Slm➢n
5m,m}W
Sm
HfIDe.m
HLm9
P.M.
5014mW
mi wmrcevMPmOv
LS
1
yAOIIm
$W
$ngAm
$35
$E
$193TIW
5,93
¢Y,359m
y039i
$b,O10ID
5,4.mm
M14rmn
SEmm
56mpm
Sss.mom
5
$z1Amm
5xy6E
Sa3.w9m
H3M6
klmm
k]m4m
S8 SmmmT Wra udsmLr Gmd
IS
1
$340LO.m
�.W
54¢0.
k#U
51]p]Olp
5])
9ku4
59 as.
H.W).m
H
��wmrm
Snso
SH
51uo
H]
Sum
S9.zm
Sv4W
H3
Sum
Sn
$W,m4.m
5m,6W
Suimm
Smmom
SE
31zs4m
loan
k a
Hm0.m
W
m] sswamim
ss
1
$.9
$1 v
scam
Hsoom
k5o4W
,amnm
slq..
s
nee�vane
S,.me.t
k
55X69
S,Tmm
5
Hn.m
5a5EW
S9vem
SesK.
5zsom
5z,as4
1l8 BeamsIXSYeX /.uemE
G
6
kJrmm
H
$mm
$5m
$15mm
$9
$1395m
$L3RW
$914W
$4%
$limW
5]
v4 Mudmnvnry
Sml.m
5
Ss4m
58mm
Hnm
52395
k,cm
SAsn
Seam
31 Bemoe FaWMMaIn
4
610
$M]5
5)0
$Mm
$13AW
$15.m
$IO,mp
5NM
$H,]
$SaW
533
519m
5&'MW
va apvem EV Wmcmam
IF
y®
SL.m
H53i
$IaPW
$35W
55)
Slflm
k]
SILm
k1
51aW
Su
a3 fmrevmacwmrman
-
Sn]x
HSOnm
$nom
51smm
HO
k9.
am.m
k3Amm
na [� WmrMaln
m
595.m
$LTE
$])am
$InAap
$,Wm
56j
SY30
k19
$v36m
$]RW
S,4MW
E15 0 MWaMMMn
IF
3M13
$e5.m
$161,051
5fI5m
kHYs
$mm
H
50fID
5%m
Sas%
$nm
SLWA)A
Notice of Award
Date: 5/9/2022
Project: S. 4th Street Reconstruction
Owner: City of Laurel Owner's Contract No.: N/A
Contract: South 41h Street Reconstruction Project Engineer's Project No.: 2104-00862
Bidder: Cop Construction
Bidder's Address: 242 S. 641h street West, Billings, MT 59106
You are notified that your Bid dated 5/4/2022 for the above Contract has been considered. You are
the Successful Bidder and are awarded a Contract for Schedule 1, 2, 3. & 4. South 4th Street Reconstruction.
[indicate total Work, alternatives, or sections of Work awarded]
The Contract Price of your Contract is four million, two -hundred ninety-eight thousand and seventy Dollars
($ 4,298.070.00).
3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
3 sets of Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen [15] days of the date you receive this
Notice of Award.
1. Deliver to the Owner 3 fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract Security [Bonds] as specified in the
Instructions to Bidders (Article 20) and General Conditions (Paragraph 5.01).
3. Other conditions precedent:
a. A preliminary copy of the construction schedule
b. List of subcontractors and suppliers
c. A breakdown of the costs associated with Item no. 417 Asphalt Concrete Pavement (4")
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default,
annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with th ove conditions, Owner will return to you one fully executed
counterpart of the Contract Documents. zaQ U,�
rr
Owner \ n , ,
By: 011 0 t l� `� PYl &6
Authorized Signature
�ew>or
Title
Copy to Engineer
S. 4th Street Reconstruction Notice of Award Form C-510
KU Project 2104-00862 Page 1 of 1