HomeMy WebLinkAboutPublic Works Committee Minutes 07.19.2021MINUTES
CITY OF LAUREL
PUBLIC WORKS COMMITTEE
MONDAY, JULY 19, 2021
The Public Works Committee meeting was called to order at 6:OOpm on Monday, July 19 2021
by Committee Chair, Heidi Sparks.
Members Present: Heidi Sparks- Chair, Iry Wilke- Vice Chair, Richard Herr, Dan Koch, Mary
Carter
Others Present: Kurt Markegard- Public Works Director
Public Input: None
General Items:
Approval of the Minutes from June 21, 2021- Motion by Iry Wilke and seconded by Dan
Koch. Motion carried to approve the minutes as corrected- Note: Don Nelson was not
present at the June 2021 meeting and Dan Koch was present at the June 2021 meeting.
New Business
2. Emergency Call Out Report- Report attached
a. Items of note- Water break on Woodland Ave. A temporary fix is in place until
the city can get pipe to install a permanent fix.
3. KLJ Engineering Report- Report attached
Old Business: None
Other Items
• Kurt gave an update on the ARPA Grant applications submitted. Report of grant
applications attached.
Announcements
4. Next Meeting will be Monday, August 16, 2021 at 6:OOpm
Meeting adjourned at 7:15pm.
Emergency Call Out for August 16, 2021, Public Works Committee Meeting
7/19 411 Idaho Sewer Backup
7/21 Sewer Plant Alarm
7/23 Sewer Back up 600 blk 5th Ave.
7/25 Water Leak 1111 Locomotive Circle
8/7 Vandalism at Kids Kingdom Bathroom
City of Laurel Project Status Update
August 16, 2021
2022 Pavement Maintenance Project (KU #2104-00862)
Reason for Project: To provide yearly maintenance and improvements to the City of Laurel Roads
Network.
Project Scope: Miscellaneous annual pavement maintenance design, bidding and construction in
locations throughout the City of laurel
Current Status:
• Project Scope and Task Order Delivered to City
• Being Reviewed at Workshop on 7/20/21 and Council 7/27/21
Lindy Lane Sewer Replacement (KU #2014-00018)
Reason for Project: To replace a large capacity sewer main that is cracked and has a high potential for
failure.
Project Scope: To remove and replace a 115 lineal foot section of 30" sanitary sewer pipe that is just
south of Interstate 90 to a manhole within Lindy Lane.
Current Status:
• Bid Opening 8/12/21
• City Council 8/26/21
Water System PER (KU #2104-00147)
Reason for Proiect: To update the Preliminary Engineering Report that was completed in April 2014 with
the most current information.
Project Scope: To Update the existing computer model for the water distribution system; Review
pressure zone, tank and booster station alternatives; Analyze up to 3 different sites for a new water tank
and explore funding alternative for all potential projects.
Current Status:
• Project Analysis is in Progress.
• Final Report is due Sept. 1:1
Sth Ave. Water Re -Route (KU #2104-00118)
Reason for Project: To abandon the existing waterline between W. 11th and W. 12th Streets that crosses
existing properties without an easement.
Page 1 of 5,
ENGINEERING, REIMAGINED
City of Laurel Project Status Update
August 16, 2021
Proiect Scope: Abandonment of a 12" waterline that connects 111h St. to 12t1 St north of Sm Ave. in
Laurel. A new 12" waterline will connect at the intersection of 5t1 Ave. and 11th St, route east to 4th Ave.
and then north to 12th St. where it will turn back west and connect at the original connection point along
12t1 St.
Current Status:
• Draft study complete and under internal review
Southside Stormwater Study (KU #2004-01470)
Reason for Project: Analyze Laurels South side to determine needed improvements for stormwater.
Project Scope:: To complete a stormwater master plan for the areas south of the train tracks and west
of Highway 212.
Current Status:
• Analysis and evaluations of existing conditions is complete
• Development of alternatives is in progress
WWTP Screw Pump 8 Replacement (KU #2004-01359)
Reason for Project: To replace screw pump B at the Laurel Wastewater Treatment Plant.
Proiect Scope: Reconstruction and rehabilitation of the Archimedes Screw Pump "B" at the City of laurel
Wastewater Treatment Plant.
Current Status:
• Project Bid July 1:1
• Project Award July 13th
• Anticipated equipment delivery January 15"
• Project completion, February 1511
WTP Lift Well Replacement (KU #2004-01487)
Reason for Proiect: To replace a lift well at the Laurel Water Treatment Plant.
Project Scope: Reconstruction and rehabilitation of the lift well at the City of Laurel Water Treatment
Plant.
Current Status:
• DEQ Submittal 7/30/21
• Advertise 8/26/21
• Bid Opening 9/1/21
Page 2 of 5
ENGINEERING, REIMAGINED
A d City of Laurel Project Status Update K L'
August 16, 2021 <
2021 Pavement Maintenance Project (KU #2004-00831)
Reason for Project: To provide yearly maintenance and improvements to the City of Laurel Roads
Network.
Project Scope: Miscellaneous annual pavement maintenance design, bidding and construction in
locations throughout the City of laurel
Current Status:
• Approved by Council on May 11th
• Start Construction lune 1s`
• Crack sealing complete this week.
• Chip Sealing to occur 7/20/21
• Project to be complete by 8/15/21
• Change Orders Issued 8/11/21
Sanitary Sewer H2S Remediation (KU #1804-00122)
Reason for Project: Buildup of H2S within the WW collection system has led to deterioration of manholes
and other system components.
Proiect Scope: Complete design and construction administration to address H2S build-up in the system.
Current Status:
• Survey completed
• Design underway
• DEQ Submittal 7/30/21
• Advertise 8/26/21
• Bid Opening 9/1/21
Water Tank Recoat (KU #1904-01843)
Reason for Project: The coating on the City water tank has deteriorated to the point where it is flaking
and peeling.
Project Scope: Design, bid, and administer the recoating of the water tank.
Current Status:
• Project Bid 7/1/21
• Project Award 7/13/21
• Project Completion 8/31/21
Page 3 of 5
ENGINEERING, REIMAGINED
City of Laurel Project Status Update
August 16, 2021
Yellowstone River Crossing (KU #2004-00542)
Reason for Project: The 4" waterline that serves Riverside park campground freezes during the winter
months and leaks where it crosses the Yellowstone River.
Proiect Scope: Design, bid, and administer the replacement the waterline that is attached to the bridge
crossing the Yellowstone River
Current Status:
• Preconstruction meeting scheduled for 7/21121
• Project on Hold until Pipe can be delivered
Design Standards & Rules Update (KU # 1804-02569)
Reason for Proiect: Update old standards
Project Scope: Develop a set of cohesive and concise design standards for public improvements to help
facilitate reviews of new developments and ensure the public improvements are designed in the City of
Laurel's best interest.
Current Status:
• Drafts of the all sections of the manual are complete
• Final sections of streets, water and sewer are complete
Laurel Planning Services (KU #1804-00554)
Reason for Project: KU has been retained to provide City of Laurel planning services as needed.
Project Scope: Planning services may include; subdivision, zoning, development, floodplain hazard
management, miscellaneous reviews and other related work. KU will prepare staff reports,
recommendations, and attend meetings upon request.
Current Status:
• Site Plan Review— Lot 1B, Block 1, Entertainment Subdivision. 2nd submittal reviewed and
sent to City on 6.15.21
• Subdivision Review—Goldberg Sporting Estates Sewer Recommended language Sent to Kurt
April 22"d, 2021. Needs to go to City Council
• Subdivision Review—Cherry Hills 3`d Filing Initial Review Complete and sent to City 7.6.21
• Subdivision Review - Iron Horse Station Subdivision Water & Sewer Delivered Approved,
Streets & Storm comments sent 5.28.21
• Subdivision Review - Bitterroot Grove Townhomes Engineering reports reviewed and sent
to City on 6.8.21
ENGINEERING, REIMAGINED
Page 4 of 5
City of Laurel Project Status Update
KLI
August 16, 2021
• Growth Policy Update —Completed December 15, 2020
Laurel Capital Improvement Plan (KU # 2104-00649)
Reason for Project: KU has been retained by the City of Laurel to develop a 5 -year Capital
Improvement Plan (CIP).
Project Scope: The CIP is primarily a planning tool for annual budgeting to assist Departments and the
Governing Body establish project priorities and funding.
Current5tatus:
• Task Order executed
• Kick-off meeting Department Heads
• Initial structure of CIP generated
• Department Heads contacted for additional projects.
• Document is being drafted.
Other Notes and Information
Other potential projects have been identified during recent conversations between City staff and KU.
City Public Works staff and KU task leaders meet bi-weekly to discuss current and future projects. As
these are tentative, the timing and extent of KU's services are TBD, unless noted otherwise.
Anticipated FY21 Proiects
1. West Railroad Street Reconstruction- Proposal submitted
2. Water System Planning
a. Booster station rehabilitation or replacement (task order forthcoming)
b. Water storage tank Preliminary Engineering Report
3. 7th Street reconstruction from 1" Street to
4. Waterline extension out to Golf Course Road
5. Updates to Zoning regulations
6. Updates to Subdivision Regulations
7. West Interchange Neighborhood Plan
Other Potential Future Proiects
1. West Side TIFF
ENGINEERING, REIMAGINED