HomeMy WebLinkAboutResolution No. R21-68RESOLUTION NO. R21-68
A RESOLUTION OF THE CITY COUNCIL APPROVING CHANGE ORDER #3 TO
THE CONTRACT BETWEEN THE CITY OF LAUREL AND HARDRIVES
CONSTRUCTION AUTHORIZING ADDITIONAL WORK AND ADDITIONAL COSTS
FOR THE
2021 PAVEMENT MAINTENANCE PROJECT.
BE IT RESOLVED by the City Council of the City of Laurel, Montana:
Section 1: Approval. The Change Order #3 between the Parties is attached hereto
and incorporated herein as part of this resolution and is accepted and hereby approved by the -
City Council.
Section 2: Execution. The Mayor and City Clerk/Treasurer of the City of Laurel
are hereby given authority to accept and execute the attached Change Order #3 on behalf of the
City.
Section 3: Effective date. The effective date for the Change Order #3 is upon
adoption and approval of this resolution.
Introduced at a regular meeting of the City Council on August 10, 2021, by Council
Member Stokes.
PASSED and APPROVED by the City Council of the City of Laurel this 10d' day of
August 2021.
APPROVED by the Mayor this 10' day of August 2021.
CITY OF LAU L
Thomas C. Nelson, Mayor
ATTEST:
Bethany La ve, lerk-Treasurer
APPROV D AFORM
Sam Pain er, Civil City Attorney
R21-68 Approve Change Order 43 Hardrives Construction 2021 Pavement Maintenance Project
Date of Issuance: August 11, 2021
Project: 2021 Pavement Maintenance Owner: City of Laurel
Contract: 2021 Pavement Maintenance Project
Contractor: Hardrives Construction
Change Order
No. 3
Effective Date: August 11, 2021
Contract No.:
Date of Contract: May 20th, 2021
Engineer's
No.: 2004-00831
The Contract Documents are modified as follows upon execution of this Change Order:
Contractor is to perform additional work that will include the resurfacing of the baseball field parking lot lust south of the Laurel High
Costs will include 2,085 SY of extra chin seal.
Attachments (list documents supporting change):
Cost assessment sheet from Hardrives Construction. Services are described as Baseball Field lot (Double chip seal).
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days
Substantial completion (days): August 20th, 2021
$329,329.50 Ready for final payment (days): September 0 , 2021
Increase from previously approved Change Orders No. 0 Increase from previously approved Change Orders
to No. 1: No. 0 to No. 1: ,
$81,472.00
Contract Price prior to this Change Order:
$410,801.50
Increase of this Change Order:
$14.344.80
Contract Price incorporating this Change Order:
$425.146.30
RECOM�
By:
Englne (Authorized Sii
Date: $/4/2021
Date:
Substantial completion (days): 42 days
Ready for final payment (days): 42 days
Contract Times prior to this Change Order:
Substantial completion (days): October 3rd . 2021
Ready for final payment (days): October 151h. 2021
[Increase] or {De' crease) of this Change Order:
Substantial completion (days): 0 days
Ready for final payment (days): 0 days
Contract Times With all approved Change Orders:
Substantial completion (days): October 3rd , 2021
Ready for final payment (days): ): October 1511. 2021
ACCEPTED:
By:
Contractor (Authorized Sigi (Ure)
Date:
i
Laurel 2021 Pavement Maintenance Change Order Page 1 of 2
KU Project 2004-00831 1
Change Order
Instructions
A. GENERAL INFORMATION
This document was developed to provide a uniform format for handling contract changes that affect Contract Price or
Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent
Change Order if they affect Price or Times.
Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of
accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes.
If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed.
For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a
Field Order should be used.
B. COMPLETING THE CHANGE ORDER FORM
Engineer normally initiates the form, including a description of the changes involved and attachments based upon
documents and proposals submitted by Contractor, or requests from Owner, or both.
Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval,
depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated
agreement for a previously performed change. After approval by one contracting party, all copies should be sent to
the other party for approval. Engineer should make distribution of executed copies after approval by both parties.
If a change only applies to price or to times, cross out the part of the tabulation that does not apply.
Laurel 2021 Pavement Maintenance Change Order Page 2 of 2
KU Project 2004-00831
City of Laurel Date: July 27,2021
IIS West list St.
Laurel, PAT 59044 Job Type: Asphalt
Job Location: W. 14th St
•'Final pay based 4n actual measured quantities.
e All workmanship and materials guaranteed against failure for one full year.
PAYMENT TO BE AS FOLLOWS:
UPON SATISFACTORY COMPLETION OF PROJECT
eve,moemit... blumlil,mtlrtpbNIaWr<wopYAlnaamdawxlN WernmY@Wam.fv Nammor:
--See Abovere
I ROP0SA MAY BE WITHDRAWN BY US IF NOT ACCEPTED VVIIIIHIN 20 DAY
All material 6 Suanntmd to be Species. 0 M to be completed In a worriment. manner according to standard pnttln,, ary alten ims
deviation, ham came end4Mice. inn.lbal o.con,Mi4 hobnobbedoNY uponwdnte order, nJwla be.. ea nen
eharyawderandabmetheaWnan. Nl agreements continent upon nae,, a ddenta, mdelap hoped our termer. Crum,
lon,ryere, enrnWemdothnnemnrylmunn<e. corror lananlunycnemdbyPlmYmml Companneam innrance. IN,
Dmummeshe event .. R14101 eA Use. This Rmte b to be inner! onymbeommst t the, blbhed.
l
AUTHORIZED SIGNATURE: lady Teske• Estimator
Acnopt.meof Prame.1; Theabovep,lotspaURsali mS .nd �cff di(IonS are sa0sfactorr and
areherebyancepled. You are authorized to doth' ink asaQad ed. Payment Milan made asoutaned above.
SIGNATURE: I DATE OF ACCEPTANCE:
Licensed o Bonded c Insured WWW.HARDRIVES•ASPHALMOM
LS
$3,S111D
53,500.00
2 Mill 4" each side and lay fabric
6,800 SY
$2.75 $
18,700.00
3 Asphalt Overlay 2^
573 TN
$84.00
$48,132.00
4 Traffic Control
1 LS
$1,250.00
$1,250.00
$71,582.00
Option 2
5 Mobilisation
1 LS
$3,500.00
$3,500.00
6 Reclaim top B", Remove 4', molsture, Condition & Compact, 2%crown ,4"paving
6,8005Y
$23.04
$156,672.00
7 Traffic0ontrol
'1 is
$2,500.00
$2,500.00
$162,672.00
Optica3
8 Moblllsatlon
I LS
$3,500.00
$3,500.00
9 Chip seal followed by l 11V asphalt overlay
6,800 SY
$e.SO
$57,800.00
10 Traffic Control
1 Ls
$2,500.00
$2,500.00
$63,800.00
Extra shipping
Chip Seal Pool Parking lot ( Double chip seal one end)
2,825 SY
$3.441
$9,890.00
Baseball Held lot( Double Chip Seal)
2,085 SY
$6.88
$14,344.80
•'Final pay based 4n actual measured quantities.
e All workmanship and materials guaranteed against failure for one full year.
PAYMENT TO BE AS FOLLOWS:
UPON SATISFACTORY COMPLETION OF PROJECT
eve,moemit... blumlil,mtlrtpbNIaWr<wopYAlnaamdawxlN WernmY@Wam.fv Nammor:
--See Abovere
I ROP0SA MAY BE WITHDRAWN BY US IF NOT ACCEPTED VVIIIIHIN 20 DAY
All material 6 Suanntmd to be Species. 0 M to be completed In a worriment. manner according to standard pnttln,, ary alten ims
deviation, ham came end4Mice. inn.lbal o.con,Mi4 hobnobbedoNY uponwdnte order, nJwla be.. ea nen
eharyawderandabmetheaWnan. Nl agreements continent upon nae,, a ddenta, mdelap hoped our termer. Crum,
lon,ryere, enrnWemdothnnemnrylmunn<e. corror lananlunycnemdbyPlmYmml Companneam innrance. IN,
Dmummeshe event .. R14101 eA Use. This Rmte b to be inner! onymbeommst t the, blbhed.
l
AUTHORIZED SIGNATURE: lady Teske• Estimator
Acnopt.meof Prame.1; Theabovep,lotspaURsali mS .nd �cff di(IonS are sa0sfactorr and
areherebyancepled. You are authorized to doth' ink asaQad ed. Payment Milan made asoutaned above.
SIGNATURE: I DATE OF ACCEPTANCE:
Licensed o Bonded c Insured WWW.HARDRIVES•ASPHALMOM